Towards IDD
Integrated Digital Delivery
Slide 5
What is IDD ?
Integrated Digital Delivery
1
4 3
use of digital tools.
construction
Source : BCA
IDD Objectives / aims:
To achieve >>timely,
cost effective,
productive & high quality
project delivery - design, manufacturing, fabrication, construction
and asset delivery
IDD
Source : BCA
Current Industry Challenges
DIGITAL
1 DIGITAL
MANUFACTURING
2 DIGITAL
3 DIGITAL ASSET
DELIVERY &
4
DESIGN CONSTRUCTION
& FABRICATION MANAGEMENT
Design BIM model is Design/Construction BIM is not fully utilized Building owners
often developed for BIM not directly linked during construction still learning how
BCA submission only. to manufacturing, beyond 3D geometry to link BIM to FM
BIM Model not fabrication & logistics,
planning & execution Documentation still Lack of capability
suitable for DfMA/FM very paper-based and infrastructure
Digital Designers are Opportunities for
to support FM
rare to find(Designer further automation, Real-time information operations
who can code) use of robotics and 3D not captured and used digitally.
printing effectively to guide
coordination,
execution, & validation
Digital information are mostly segregated, great need to integrate across the value chain for greater effectiveness
Source : BCA
1 Digital Design - components
BIM
Quality
Checks
Computational &
DESIGN BIM MODEL
Rule-based Tender Release
design & Handover
Buildability and Constructability
Source : BCA
2 Digital Manufacturing and Fabrication components
Source : BCA
2a. Fabrication Model Preparation
Design upfront for ease of manufacturing and assembly
Highly automated offsite production facilities - PPVC
Efficient and clean on-site installation process -
Collaboration Virtual Reality (VR) Immersive Virtual Reality (IVR)/Computer Aided Virtual Environment (CAVE)
2c. BIM to
Shop Floor
Cold Formed
Light Gauge Steel Truss
Fabrication Line in
direct BIM/CAD control
Slide 15
2d. Automation & Robotics
Automated Fabrication and Welding
TEKLA Integration
Slide 16
2e. DfMA : Better Quality Control
Field BIM
Equipment Tracking
(e.g. using BIM for
(e.g. using GPS)
layout)
Lean ICE Meeting Session
Construction
Source : BCA
3a. VDC Process – BIM in Construction
Slide 20
VDC Fuzor & MS Teams
Slide 30
DIGITAL ASSET DELIVERY & MANAGEMENT
Scan to BIM
Asset Monitoring & Asset Management
Knowledge of Scripting
Aaron Foong
Eugene Seah Managing Director,
Senior Director, Special Projects KTPC Management
Group CEO’s Office (part of the SJ Group)
Eugene.seah@Surbanajurong.com aaron.foongkk@ktpworld.com
Slide 47