Materi - Mr. Iwan - Woh-Hup - Indonesia Webinar PPVC
Materi - Mr. Iwan - Woh-Hup - Indonesia Webinar PPVC
Multipurpose Powerpoint
• Client
• Consultant
• Contractor
• Subcontractor
IMPLEMENTATION COVID 19 PREVENTION
PLAN IN SINGAPORE
SAFE DISTANCING MEASURE
ORGANIZATION CHART
SM OFFICER
Lee Sai Yin
Chowdhury Rana
SCHEDULE
1
0615hrs
2
0630hrs
3
0645hrs
• Max capacity:
• 10ft lorry : 4
• 24ft lorry : 8
BUS & TRANSPORT ARRANGEMENT
STOPPING AREA
BUS & TRANSPORT ARRANGEMENT
SUBCON ARRANGEMENT
BUS SCHEDULE
0615hrs 0715hrs 0815hrs
• Subcontractor will be required to arrange tim ing of • Subcontractor to segregate bus/ transport vehicles as according
transport in accordance to below schedule to the tim ing for the work zones. The bus group list with the
bus/ transport details m ust be subm itted to WH
BUS & TRANSPORT ARRANGEMENT
END OF SHIFT CONTROL
BUS SCHEDULE
1900hrs 2100hrs
1930hrs 2130hrs
2000hrs 2200hrs
2030hrs 2230hrs
• Security and WSHE team to m aintain crowd control at Bus pick up points
• Always m aintain safe distancing during bus boarding and ensure that sam e bus group boards onto 1 bus. No inter -m ingling and m ixing
• Liaise with bus com pany to have bus drivers to disinfect bus after dropping workers at their dorm itory (aerosol disinfectant spray cans)
ENTRY CONTROL
Partitions in between work-stations and safe distancing m eeting boxes shall be setup with the office
SITE AND FACILITIES ZONE
SUM
ALL
ZONES
SITE AND FACILITIES ZONE
WORKING ZONE
EMERGENCY
ASSEMBLY
AREA
DINNING
AREA
19
SITE AND FACILITIES ZONE
SITE ACCESS AND FACILITIES AT ZONE A
STAFF
ENTRA
NCE
Designated route
for zone A only WORKE
R
ENTRA
NCE
SITE AND FACILITIES ZONE
SITE ACCESS AND FACILITIES AT ZONE B
STAFF
ENTRA
NCE
Designated route
for zone B only WORKE
R
ENTRA
NCE
DINNING
AREA
SITE AND FACILITIES ZONE
SITE ACCESS AND FACILITIES AT ZONE C
STAFF
ENTRA
NCE
Designated route
for zone C only WORKE
R
ENTRA
NCE
STAFF
ENTRA
NCE
Designated route
for zone D only WORKE
R
ENTRA
NCE
WORK ACTIVITIES CONTROL
SCHEDULING OF WORKS AT CONSTRUCTION BLOCKS
ZONE A
12:25 –13:10hrs 13:10 –13:20hrs 15:40 –16:10hrs 16:10 –16:20hrs
ZONE B
12:25 –13:10hrs 13:10 –13:20hrs 15:40 –16:10hrs 16:10 –16:20hrs
ZONE C
12:25 –13:10hrs 13:10 –13:20hrs 15:40 –16:10hrs 16:10 –16:20hrs
ZONE D
12:25 –13:10hrs 13:10 –13:20hrs 15:40 –16:10hrs 16:10 –16:20hrs
1 pcs Oxygen Tub 6 pcs Nasal Canul 2 pcs Simple Mask Disinfectant at the AWJO office site and worker beds every 1 week
COVID 19 Prevention Program
Menyediakan fasilitas kesehatan di lokasi proyek berupa ruang klinik yang dilengkapi
dengan :
Hand Gloves Surgical Mask Bacterial Hand Wash Medicine & Vitamins
Temperature Check for all visitors Temperature Check for site staffs
All Staff Are Required to
Implement the Government
regulations regarding Driving
Procedure on Large-Scale Social
Restriction
Recommended Hospital :
41
DESIGN FOR MANUFACTURE and ASSEMBLY
DFMA & IDD JOURNEY
44
VARIOUS BIM
MODEL
DIGITAL INSPECTION
MODEL BASED WITH WH MOBILE
IDD
QUANTITY TAKE OFF ROBOTIC TOTAL APP
2009
(ARCHI. STR. M&E) STATION RFID/QR CODE
3D LASER-SCANNING FOR MATERIAL
2017
TRACKING
Adoption of BIM
VDC
DIGITAL
FABRICATION
Adoption of IDD
BIM TECHNOLOGY CAPABILITY
2015 2015/2016
Adoption of VDC Adoption of DFMA
SAFETY STUDIES WITH
PBU / MET/ PPVC
MODEL
CONSTRUCTION SEQUENCE
VR SIMULATION
R&D
WALKTHROU VISUALIZATION PBU
GH PPV
DIGITAL MOCK-
C
UP
MET
BIM – VDC – IDD
New Plan
2015
• Concrete PBU adoption
• IPA for Concrete PBU
Design Review & Coordination
2016
• IPA for Drywall PBU Prefabricated Bathroom Shop Drawing
• Drywall PBU adoption Unit (PBU)
2019
• IPA for Structural PBU
(application in progress)
• Structural PBU adoption
2015
• Partnering with Venturer
2016
Design Review & Coordination
• Singapore Sustainability
Academy in
collaboration with CDL Cross Laminated Timber
(CLT)
2018
• WH Technology Hub @
Gul
Expansion in Johor
IPA Steel PPVC The Tapestry, Whistler Grand,
2D Casting, 3D Casting
6-sided PPVC 6-sided PPVC
WH Tech Hub,
IPA Concrete PPVC Riviere
2D Casting,
5-sided PPVC Design stage
Concrete
Shear Wall
PPVC
Concrete
Product Key
Column-
Beam
PPVC
Features
Steel
PPVC
Versatile Modelling Capability
Integrated
Fabrication Bedroom 2 &
Common Bath
Master Bedroom
Competent Team
Design Fabrication
Integrated Review
Fabrication
Coordination
Plastering, Skim
Coat and Aluminum
MEP Painting Cladding
Installations
False
ceiling
Cabinet
s
Glass Railing
Floor Tiling
Virtual Design Construction (VDC)
Integrated 3D
model
4D
sequencing
5D
Cost
6D
FM
Fabrication
Integrated Digital Delivery (IDD)
Integrated
Fabrication
Main
Contractor
• VR walkthrough enable project team to continuously improve understanding of project before construction started
RC Fabrication
JB Yard
Fabricate
PPVC carcass
KFELS Tampines
KFELS
Project Site
Fit-out & Fit-Out
finish PPVC Yard
module
TAM
Install PPVC
module
64
Challenges Faced &
Mitigation Measures
Challenges Faced & Ways to Overcome
Challenges Faced & Ways to Overcome
➢ Yard expansion in JB
Challenges Faced & Ways to Overcome
• Payment
CLIENT
Value Chain
• BIM Capabilities
CONSULTANT
Value Chain
• BIM capability
• Facilities
SUBCONTRACTOR
• Workforce
THANK YOU