September 12, 2020

Project: Insaf Hospital


Mogbazar, Dhaka.
Sub: Cable measurement for the project of Insaf Hospital 1000kVA & 315 kVA
substation at Mogbazar, Dhaka.

HT cable:
1. Cable type : XLPE 11KV
2. Cable Size : 1x3c x 120 rm
3. Cable Length: 58 meter

LT cable:
4. Cable type : NYY
5. Cable Size : 3x1c x 300 rm
6. Cable Length: 50 meter

Cable for ATS to MDB-800A:


1. Cable type : NYY
2. Cable Size : 1x1c x 240 rm
3. Cable Length: 312 meter

Earthing cable:
1. Cable type : BYA Green
2. Cable Size : 70 rm
Cable Length: 160 meter

For 315 kVA Substation (new)

LT Cable
1. Cable type : NYY
2. Cable Size : 1x1c x 300 rm
3. Cable Length: 35 meter

Earthing Cable:
1. Cable type : BYA
2. Cable Size : 25 rm
3. Cable Length: 20 meter

Required Installation Materials List for 1000 kVA

1. Cable lugs 120rm-18 Pcs


2. Cable lugs 300rm-24 Pcs
3. Cable lugs 240rm-16 pcs
4. Cable lugs 70rm-14 Pcs
5. Cable tie 12inch-5 Pack
6. PIB Tape-6 Pcs
7. PVC Tape 5 Colour-25Pcs
8. Rowel Bolt 12mm-12Pcs
9. Cable tube 30X5mm Red-2 meter
10.Cable tube 30X5mm Yellow-2 meter
11.Cable tube 30X5mm Blue-2 meter
12.Cable tube 30X5mm Black-1 meter

Required Installation Materials List for 315 kVA

1. Cable lugs 300rm-10 Pcs


2. Cable lugs 25rm-12 Pcs
3. Cable tie 12inch-2 Pack
4. PIB Tape-2 Pcs
5. Rowel Bolt 12mm-8Pcs

Thanks
Md.Murad Mridha
Asst.Engr.
Adex Corporation Ltd. (Installation)