Coating Selection Plan "Map"

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

COATING SELECTION PLAN “MAP”

BI Number: BI-10-09004
BI Title: MARJAN DEVELOPMENT PROGRAM DOWNSTREAM PIPELINES- PKG 18
Review Title: 60%
Phase: Detailed Design
Deliverable Number: C265879001P

Name of Items to be Make Installation Insulated or Service Maximum Maximum Service Surface to be APCS Notes/Remarks
coated (CS, (offshore/onshore, above Uninsulated (crude oil, sour Exposure/Service/ /Operating coated (external Selected for coating
SS, ground, buried (dry crude, seawater, Operating Pressure or internal) application
GS, ground/subkha), sour gas, etc.) Temperature (psi)
Al, immerse) (oF)
etc.)
1.Closed Drain Drums CS Onshore – Internal Uninsulated Sweet products 140 50 Internal APCS-2A
(653-D-3XX1 Coating (NGLs, Sales gas,
A/B/C/D/E/F/G/H/L/J/K)- Ethane, Butane,
MT Propane)

2. Closed Drain Drums CS Onshore -External Uninsulated Sweet products 140 - External APCS-1A .
((654-D-3XX4A/B). Coating (NGLs, Sales gas,
Ethane, Butane,
3. Closed Drain Drums Propane)
(657-D-3XX2A/B/C/D/E)

4. Closed Drain Drum


(658-D-3XX3)

5. Closed Drain Drum


(660-D-3XX5)
Above ground Carbon CS Onshore / Above Ground Uninsulated Sweet products 106 - External APCS-1A
Steel Pipelines (NGLs, Sales gas,
1.TNRKTG-1 Sales Gas Ethane, Butane,
Pipeline. Propane)

2. TNKJNGL-1 NGL
Pipeline.

3. TNJBETH-1 Ethane
Pipeline.

4. TNJBPRP-1 Propane
Pipeline.

5.TNJBBUT-1 Butane
Pipeline

6. TNKJ-1 Pipeline

Saudi Aramco: Company General Use


Buried Carbon Steel CS Onshore/ Buried / Dry Uninsulated Sweet products 106 - External APCS-104A
Pipelines ground (NGLs, Sales gas,
1.TNRKTG-1 Sales Gas Ethane, Butane,
Pipeline. Propane)

2. TNKJNGL-1 NGL
Pipeline.

3. TNJBETH-1 Ethane
Pipeline.

4. TNJBPRP-1 Propane
Pipeline.

5.TNJBBUT-1 Butane
Pipeline

6. TNKJ-1 Pipeline

Carbon steel Transition CS Onshore / Soil - Air Uninsulated Sweet products 106 - External All transition areas (buried to above ground pipe sections, including
section pipe to above Interface (NGLs, Sales gas, camel and road crossings) shall be protected with the buried service
ground Ethane, Butane, coating and supplemented with an approved protective
Propane) laminate/wrapping system with UV resistance outer wrap. LSTK
(Soil/Air Interface) contractor shall comply with the requirement of SAES-H-002 para 5.1.5.
All Pipelines
Buried Road Crossings & CS Onshore / Under ground Uninsulated Sweet products 106 - External APCS-104A plus 1) APCS-113C shall be used only for open cut
Thrust boring (NGLs, Sales gas, APCS-113A or excavation.
Ethane, Butane, APCS-113C 2) The proposed APCS-113A topcoat shall be
(All pipelines) Propane) confirmed by CSD/Coatings Team if it has
adequate abrasion resistance APCS-104A/B shall
be abraded prior to top-coating with APCS-113A.
3) if Coating will be damaged using the
conventional thrust boring system in rocky soils.
Consult the CSD/Nonmetallic Team for modify
the optimum composite wrap.
Underground pipelines CS Onshore/ Buried / Dry Uninsulated Sweet products 106 - External APCS-113C
– Field Joint Coating ground (NGLs, Sales gas,
(All pipelines) Ethane, Butane,
Propane)

Notes:

1. Surface preparation and coating application shall be in according to SAES-H-001 for above ground items and SAES-H-002 for buried and soil/ air interface pipelines.
2. Approved coating systems shall be in according to SAES-H-101V& SAES-H-002V.

Saudi Aramco: Company General Use

You might also like