Professional Documents
Culture Documents
Trail Bridge Strategy English
Trail Bridge Strategy English
2006
Government of Nepal
Design and • To examine and approve • To prepare, approve and • To prepare, approve
Cost designs of trail bridges longer revise designs and cost- and revise designs and
Estimates than the prescribed span. estimates cost estimates.
19
Contd....
• To ensure the quality standard of • To implement plans through user • To arrange for third party
construction and maintenance committees / contractors technical audits.
work. • To have third party technical audits • To undertake rectification
• To monitor and evaluate conducted. work if the quality of
• To conduct research and develop • To undertake rectification work if the work on the bridge do not
technology or make quality of work on the bridge do not conform to prescribed
arrangements for doing so. conform to prescribed norms and norms and standards and
• To prepare Trail Bridge Code standards and to have the bridge to have the bridge
dismantled if such rectification work dismantled if such
are not or cannot be done. rectification work are not
or cannot be done.
Organizational To mobilize • To ensure • To conduct or make • To publish statements of actual and • To make public statements
management foreign assistance uniformity and arrangements for conducting estimated costs, sources of finance, etc. of actual and estimated
coordination Capacity Building Training • To prepare annual reports of trail costs, sources of finance,
among donor • To update and publish the Nepal bridges and forward them to the Local etc.
agencies Trail Bridge Record. Infrastructure Development and Rural • To mobilize local
• To give • To settle disputes concerning Roads Department. resources.
preference in ownership of trail bridges • To settle disputes between VDCs
budget connecting two or more districts concerning ownership of trail bridges.
allocation to and on technical matters. • To conduct demonstration model trail
districts bridge training and routine maintenance
following this training.
20
strategy
9. Implementation Schedule A
List of Technical Manuals and Hand Books
This strategy will come into force from the day His
Majesty’s Government so decides.
1. Short Span Trail Bridge Standard
10. Review Technical Handbook for Suspended Type
Volume - I, II and III (2003)
This strategy will be reviewed when deemed
necessary in order to make it effective and suitable to 2. Short Span Trail Bridge Standard
the times. Technical Handbook for Suspension Type
Volume - I, II and III. (2003)
4. Particulars of the : Brief particulars of the Technical Chief LDO DDC Chairperson
Condition of condition/ status of each
the Bridge bridge in the district. (Schedule B/3)
Signature: ................. Signature: .................. Signature: ..................
B. Major Maintenance
S. N Bridge Span Walkway Status Grant Rs. Total Per meter Construction Completion
Name (m) width Completed/ DDC User VDC Donor Others Expenditure Cost (Rs.) Period of work
Number
(cm) Under Committee Agency (x) (Rs.) (month) (Date)
construction
27
(x) To specify "others" ………….
Schedule B/3
Particulars of Condition of Bridges
District Development Committee
Annual Report (FY ……..….)
S. N. Bridge Name of Span (m) Walkway Walkway Year of Date of Last Inspector's Condition of Remarks
River Steel/Timber width (cm) Completion Inspection Name Bridge
Number Name
Trail Bridge Strategy 2006
28
Schedule B/4 District Trail Bridge Record
District Development Committee
Annual Report (FY ……)
Date: …………………. (Date of preparation of this report)
S. N. Bridge Name of Span (m) Walkway Coordinates VDC Year of Local/ Period of Constructing
River Steel/ Completion Main Trail Construction Agency
Timber (month)
Number Name Longitude Latitude Left Bank Right Bank
B. Functions
The following will be the main functions of the NGO:
• To promote the initiatives of the community and
motivate it for active participation.
• To provide intensive and effective social
mobilization/coordination support.
• To assist in the task of mobilizing local resources.
• To provide support to the local body to formulate
and prioritize trail bridge programs.
• To monitor demands for bridges.
• To provide technical and social support to the
community.
• To establish contacts and coordination with all
related parties.
• To help the community in clearing obstacles faced
in the course of constructing trail bridges.
• To prepare reports and submit them to the local
body and the related parties.
• To help in ensuring the smooth operation of routine
repair and maintenance work.
Trail Bridge Strategy 2006 33