DAILY WORK REPORT DATE: 29-Jan-2020

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT WBS/ACTIVITY


LOCATION: HAWIYAH SITE

LAYDOWN

TOTAL
PR-28

PR-29

PR-30

PR-31

PR-59
AREA: GREEN FIELD-MODULAR

TEAM LEADER:

SUPERVISOR: JANARDAN PRASAD

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION WORKED HOURS REMARKS

GROUP-1

1 EXP-11130 JAHAN KHAN BAZ GUL CRANE OPERATOR 5 5 10

2 SGCHW-175 MUHAMMAD IQBAL RIGGER LEVEL 3 5 5 10


3 SGCHW275 SHAHID IMRAN RIGGER LEVEL 3 5 5 10

4 SP6040 KUSHNOOD ABBASI RIGGER 5 5 10


5 SP5771 RAJESH KUMAR SAH RIGGER 5 5 10
6 SP12185 ALFREDO LISONDRA RIGGER 5 5 10
7 SP4544 RAJU SINGJALI RIGGER 5 5 10
8 SP5075 GANA PRASAD PATHAK RIGGER III (TUV CERTIFIED) 0

GROUP-2 0

1 RENTAL TASIKUL ISLAM HELPER 10 10


2 RENTAL MD AHASANUL ISLAM HELPER 0
3 RENTAL TANVIR HOSSAIN HELPER 0
4 0
5 0
GROUP-3 0

1 RENTAL MEGHRAJ RAI CRANE OPERATOR 10 10

2 0

3 0

4 0

5 0

6 0

7 0

8 0

9 0

GROUP-4 0

1 0

2 0

3 0

4 0

5 0

GROUP-5 0

1 0

GROUP-6 0

1 0

2 0

3 0

SAIPEM DIRECT CONSTRUCTION EQUIPMENT


ASSET NO
No. DESCRIPTION CAPACITY WORKED HOURS REMARKS
/ PLATE NO

crane 85 ton 5 5 10

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR: CONST. MANAGER:

SIGNATURE: SIGNATURE: SIGNATURE:


DAILY WORK REPORT DATE: 17/02/2020

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT WBS/ACTIVITY


LOCATION: HAWIYAH SITE

VERY GOOD

EXCELLENT
GOOD

POOR

BAD
AREA: GREEN FIELD-MODULAR

TEAM LEADER:

SUPERVISOR: JANARDAN PRASAD

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION WORKED HOURS REMARKS

GROUP-1

1 SP11936 JOHN JOHN RESURRECCION PIPING FOREMAN 0


2 SP11923 TITUS CAMUS PIPEFITTER 0
3 SP11926 BENITO JR JUSTO PIPEFITTER 0
4 SP11929 ANTHONY JAY STA ANA PIPEFITTER 0
5 SP11930 JUANITO CASALME VILLANUEVA PIPEFITTER (FW) 0
GROUP-2 0

1 SP12075 REGIE MADERAZO PIPING FOREMAN 0

2 SP12067 JOEY COMIA PIPEFITTER 0

3 SP12065 EDUARDO BERMUDO PIPEFITTER 0

4 SP12072 ROMEO MAGNAYE PIPEFITTER (FW) 0


5 SP12066 GILBERTH CARULLO PIPEFITTER 0
GROUP-3 0

1 SP12125 MADRIGAL ALBERT CUETO PIPEFITTER 0

2 SP12069 JOEL BOLADO FURTO PIPEFITTER (FW) 0

3 SP12239 BILOG JULIUS PIPE FITTER 0

4 SP12124 CASILISILIHAN MARIANO JR. UNTALAN PIPEFITTER 0

GROUP-4 0

1 SP12076 ELINO SARNO PIPING FOREMAN 0


2 SP11924 MARK VINCENT CANCERAN PIPEFITTER 0

3 SP12215 EDISON BACALSO ALFECHE PIPEFITTER (FW) 0

4 SP12247 KHAN WHAB PIPEFITTER 0

5 SP12064 JAKE ABAQUITA PIPEFITTER 0


GROUP-5 0

1 SP8071 AJAY PRATAP SINGH PIPING FOREMAN 0

2 SP12068 DONETHER DAGANI PIPEFITTER 0

3 SP12070 MICHAEL GALERO PIPEFITTER 0

4 SP12123 AXALAN JUANITO DE VILLA PIPEFITTER (FW) 0

5 SP12071 ROGELIO GUAB PIPEFITTER 0


GROUP-6 0

1 SP12074 LAWRENCE BALITA PIPING FOREMAN 0

2 SP11925 ROMMEL CANTOS PIPEFITTER (FW) 0

3 SP11927 RAHYAN RUELAN PIPEFITTER

4 SP11928 EDWIN SOLIS PIPEFITTER

5 SP12240 DIMALIBOT ROLANDO PIPE FITTER

GROUP-7
1 SP12244 MIAH HANIF PIPEFITTER

2 SP12248 MOZUMDER SHAHADAT HOSSAIN PIPEFITTER


3 SP8624 ANKITBHAI GANPATBHAI PATEL PIPE ERECTOR 0

4 SP12245 UDDIN ABBAS PIPEFITTER 0

GROUP-8

1 SP6414 TAJUDDIN ALI PIPING FOREMAN

2 SP12218 RONALD CABRERA VILLAREAL PIPEFITTER (FW)

3 SP12225 ARTEMIO BAGON VILLENA PIPEFITTER

4 SP12216 ROLANDO PLASOS BARQUIN PIPEFITTER

5 SP12217 CHRISTOPHER REPOLLO TAN PIPEFITTER

1 SP11977 ROMMEL AROGANTE EJES PIPEFITTER / STOREKEEPER 0

SAIPEM DIRECT CONSTRUCTION EQUIPMENT


ASSET NO
No. DESCRIPTION CAPACITY WORKED HOURS REMARKS
/ PLATE NO

FOREMAN: SUPERVISOR: CONST. MANAGER:

SIGNATURE: SIGNATURE: SIGNATURE:


DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 PSA0456 ISMAIL KUNHALI MOOTHEDATH CHEMMATE STRUCTURAL FOREMAN

2 SP12266 NAZRUL STEEL ERECTOR

4 SP12252 ALAM  MAHABUB STEEL ERECTOR

5 SP12084 ARIEL BENAMER STEEL ERECTOR

6 SP12261 KADAR KABAL BEPARI STEEL ERECTOR

7 SP12091 JOMAR NARANJO STEEL ERECTOR

8 SP8420 JITENDRA YADAV STEEL ERECTOR / HELPER

9 SP6774 PRIYA RANJAN KUMAR STEEL FITTER

10 RENTAL SHREE RAM MISHRA RIGGER LEVEL III (ARAMCO CERTIFIED)

11 SP12333 RAHMAN MOHAMMED MIZANUR STEEL ERECTOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY TOOL BOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TEAM LEADER:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

DATE UPDATED 08/29/2020 13:40:00 PM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA: PR-001

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP7955 FAIZ AHMAD CRANE OPERATOR (ARAMCO CERTIFIED)

2 SGCHW188 RAMESH PENTALA RAJAMALU RIGGER LEVEL III (ARAMCO certified)

3 SP5926 BIJAY RAM RIGGER III (ARAMCO CERTIFIED)

4 RENTAL AMJAD HUSSAIN HUSSAIN CRANE OPERATOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP11686 NAEEM AKHTAR STEEL ERECTOR - CHARGE HAND

2 SP8688 RATEESH PUTHUPULLY RAJANPIPE FITTER

3 SP11096 HARI NARAYAN PRASAD PIPE FITTER

4 SP12331 JALILUR RAHMAN CHOKIDER STEEL ERECTOR

5 SP6790 SHAUKAT ALI STEEL ERECTOR / HELPER

6 SP6247 MUSAWAR HUSSAN STEEL ERECTOR / HELPER

7 SP6760 PAPPU KUMAR SHARMA STEEL FITTER

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP12384 RAJESH KUMAR SINGH STRUCTURAL FOREMAN

3 SP12193 DOBLE RAYMOND CONEJOS STEEL ERECTOR

4 SP12200 RIVERA JEROME LAVARES STEEL ERECTOR

5 SP12226 JERICK MANIBO ALOLOD PIPE FITTER

6 SP12194 EBORLAS JOJEE STEEL ERECTOR

7 SP12325 RAHMAN MOSTAFIZUR STEEL ERECTOR

8 SP12265 MIAH FARUK STEEL ERECTOR

11 SP12389 ARBENDRA SHUKLA STEEL ERECTOR / HELPER

12 SP7134 SURENDRA BEHERA JR PIPE FITTER / HELPER

13 SP6667 MALLESWARA RAO DEERGASI STEEL ERECTOR / STEEL FITTER

14 SP8488 NITESH KUMAR VARNWAL STEEL ERECTOR / STEEL FITTER

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP12385 ALBERT BELOCURA FANTONIAL JR. STRUCTURAL FOREMAN

2 SP12137 QUINTO MARIO MANIEBO STEEL ERECTOR

3 SP12195 FERNANDEZ JAYPEE VELOSO STEEL ERECTOR

4 SP12392 RICHARD GONATO JUNTILLA STEEL ERECTOR

5 SP12227 ALEJANDRO PLEGARIA CERDA STEEL ERECTOR

6 SP12226 JERICK MANIBO ALOLOD PIPE FITTER

7 SP12194 EBORLAS JOJEE MONTEGRANDE STEEL ERECTOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP12376 MUHAMMAD JAMIL STRUCTURAL FOREMAN

3 SP12332 HOSSAIN IMRAN STEEL ERECTOR

2 SP5900 AURANG ZAIB STRUCTURAL FITTER

3 SP6643 ALLAH OBHAYO STEEL ERECTOR

4 SP6262 MUHAMMAD RASHID STEEL ERECTOR

5 SP11716 ALI AMJAD STEEL FITTER

6 SP12265 MIAH FARUK STEEL ERECTOR

7 SP12389 ARBENDRA SHUKLA STEEL ERECTOR / HELPER

8 SP7134 SURENDRA BEHERA JR PIPE FITTER / HELPER

9 SP6717 DURGA RAO PARAPATI SAND BLASTER

10 SP6789 SHAFAQAT ALI STEEL FITTER

11 SP12332 HOSSAIN IMRAN STEEL ERECTOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA:

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP10982 ULDARICO BABA STEEL ERECTOR - CHARGE HAND

2 SP12127 CACAO ROMNICK TENORIO STEEL ERECTOR

3 SP12318 ISLAM MD MUSAHIDUL STEEL ERECTOR

4 SP12390 JESSIE CUBACUB SALAC PAINTER / HELPER

5 SP12291 HOSSAIN SARIF STEEL ERECTOR

6 SP12327 SELIM ABDUL JALIL STEEL ERECTOR

7 SP12324 MOHAMMAD  NOOR STEEL ERECTOR

8 SP12323 MIAH HARIS STEEL ERECTOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE:
DAILY WORK REPORT / TOOLBOX TALK DATE:

SAIPEM DIRECT CONSTRUCTION TEAM

PROJECT: HAWIYAH GAS PLANT EXPANSION PROJECT

LOCATION: HAWIYAH SITE

AREA: LAYDOWN

TOOL BOX TALK:

SAIPEM DIRECT CONSTRUCTION TEAM MANPOWER


No. BADGE NO. NAME POSITION SIGNATURE REMARKS

1 SP6212 ROLITO CAMILA STRUCTURAL FOREMAN

2 SP7078 BINU ARAVINDAN STEEL ERECTOR / HELPER

3 SP12198 NORO JUNREY PENTADO STEEL ERECTOR

4 SP12281 HASAN RAKIBUL_ STEEL ERECTOR

DATE UPDATED 12/19/19 12:00 AM


FOREMAN: SUPERVISOR:

SIGNATURE: SIGNATURE: