Professional Documents
Culture Documents
If The Soil Sample Retains On Sieve N°4. The Soil Is Gravel
If The Soil Sample Retains On Sieve N°4. The Soil Is Gravel
No, I won't. I will have identified the next week because the laboratory is in maintenance.
The construction will have done an inspection of the correct use of EPP next week.
The crane will have got up all the construction elements by the end of the month.
The engineers will have turned off the crane from tomorrow until next week. So the crane will
have got up all the construction elements by the end of the month.
The inspector will have chosen to use the bom of the PTAR, but this won't have turned off
because it is new.
Yes, they will. If the driver of the concrete mixer will have driven fast
No, they won’t. If the concrete mixer will have broken its hose.
If the soil sample retains on sieve N°4. The soil is gravel.
If the concrete mixer doesn't arrive on time, the concrete will set quickly.