Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

8/4/2020 Prelim Quiz 2: Attempt review

Home / My courses / UGRD-CS6302-2013T / WEEK 4 : Project Planning and Tracking / Prelim Quiz 2

Started on Tuesday, 4 August 2020, 12:54 PM


State Finished
Completed on Tuesday, 4 August 2020, 12:58 PM
Time taken 4 mins 6 secs
Grade 20.00 out of 20.00 (100%)

Question 1 You can not customize each KPI to reflect your needs.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 2 The testing process begins with defining defect in the Management module.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 3 _______are checkpoints on a release timeline used to verify that the release and its interim deliverables
Complete are progressing as planned.
Mark 1.00 out of
1.00

Select one:
a. Scoreboard

b. Milestones

c. Thresholds

d. Analysis

Question 4 In the definition phase, the QA/project manager defines the scope, milestones, and KPIs for the project
Complete in ALM.
Mark 1.00 out of
1.00 Select one:
True

False

Question 5 Cycle 2 can start before the end of cycle 1.


Complete

Mark 1.00 out of Select one:


1.00
True

False

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=184247&cmid=1045 1/4
8/4/2020 Prelim Quiz 2: Attempt review

Question 6 Indicates whether the scheduled calculation is currently running.


Complete

Mark 1.00 out of Select one:


1.00
a. Enabled/Disabled

b. Apply settings

c. Set Refresh Rate

d. Active/Inactive

Question 7 A test set folder in the Test Lab module contains tests that are covered by your requirements.
Complete

Mark 1.00 out of Select one:


1.00
True

False

Question 8 This cycle ensures that the new features meet the expectations of the business.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 3-Performance Testing

b. Cycle 1-New Features

c. Cycle 4-User Acceptance Testing

d. Cycle 2-Integrated System Testing

Question 9 This cycle tests the new features with existing features that might have been impacted by the changes.
Complete

Mark 1.00 out of Select one:


1.00
a. Cycle 3-Performance Testing

b. Cycle 4-User Acceptance Testing

c. Cycle 1- New Features

d. Cycle 2-Integrated System Testing

Question 10 Tests the new features of the application implemented in the release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Cycle 2-Integrated System Testing

b. Cycle 1-New Features

c. Cycle 4-User Acceptance Testing

d. Cycle 3-Performance Testing

Question 11 The Detailed tab enables you to select content to include in the release scope item.
Complete

Mark 1.00 out of Select one:


1.00
True

False

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=184247&cmid=1045 2/4
8/4/2020 Prelim Quiz 2: Attempt review

Question 12 Displays KPI calculations that enable you to determine the status of your release.
Complete

Mark 1.00 out of


1.00 Select one:
a. Detailed tab

b. Content tab

c. Scorecard tab

d. General tab

Question 13 The Release Scope tab enables you to define and update release scope items.
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 14 ______ are the means for setting objectives on Project Planning and Tracking releases and for planning
Complete and tracking release progress towards these objectives throughout its duration.
Mark 1.00 out of
1.00

Select one:
a. Scoreboard

b. Analysis

c. Scope items

d. Thresholds

Question 15 After adding a cycle to a release, you specify the details for the cycle using the _____.
Complete

Mark 1.00 out of


1.00 Select one:
a. Details tab

b. Attachment

c. Cycle tab

d. Button

Question 16 Tests the performance of the application for criteria such as number of concurrent users that the
Complete application supports and the response time of the application.
Mark 1.00 out of
1.00 Select one:
a. Cycle 4-User Acceptance Testing

b. Cycle 3-Performance Testing

c. Cycle 2-Integrated System Testing

d. Cycle 1- New Features

Question 17 Milestones are used to measure progress in project planning and tracking.
Complete

Mark 1.00 out of


1.00 Select one:
True

False
https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=184247&cmid=1045 3/4
8/4/2020 Prelim Quiz 2: Attempt review

Question 18 Displays the progress of a release in a Gantt chart.


Complete

Mark 1.00 out of Select one:


1.00
a. Master Plan tab

b. Detailed tab

c. Content tab

d. Scorecard tab

Question 19 If an application flaw is detected while running a test set, you can submit a defect. 
Complete

Mark 1.00 out of


1.00 Select one:
True

False

Question 20 When you assign a requirement to a cycle, the requirement is not automatically assigned to the release.
Complete

Mark 1.00 out of Select one:


1.00
True

False

◄ Chapter 4-Project Planning and


Jump to... Prelim Examination ►
Tracking

https://trimestral.amaesonline.com/mod/quiz/review.php?attempt=184247&cmid=1045 4/4

You might also like