FRP JOINT INSPECTION FORM MAT/WOVEN THICKNESS GUIDE

(Must completed for each joint) Thickness 1.5 oz.Mat Woven


1/8" 2 1
Date: 3/16" 3 2
Customer: 1/4" 4 2
Project: 5/16" 5 3
Location(Plant/Block): 3/8" 6 4
Pipe/Joint Number: 7/16" 8 4
Job Number: 1/2" 8 5
Job Specification: 9/16" 9 6
Pipe Diameter 5/8" 11 6
Craftsman: 11/16" 11 7
Foreman: 3/4" 12 8
Foreman Signature: 13/16" 13 8
7/8" 14 9
1" 16 10
Checklist Check YES Initials
Ends of Pipe Flat: Craftsman:
Ends Ground to proper taper as required: Craftsman:
Ends capped according to specified detail: Craftsman:
Fit up according to Specifications: Craftsman:
Surface Preparation (Grinding) has been completed: Craftsman:
Surface has been primed: Craftsman:
Primer Used:
Corrosion Barrier Quality: Checked by:
Barcol Hardness: Checked by:
Laminate Quality: Checked by:
Barcol Hardness: Checked by:
Overlay Tapers: Yes ____ No ____
Layers Staggered: Yes ____ No ____
Butt Joint Centered: Yes ____ No ____
Inspected before Paint: Yes ____ No ____

Overlay to be fabricated in _____________ pieces staggered around the circumference.


Thickness of structural overlay to be _____________ Layers of mat
Layers of woven roving
If joint is inspected by Customer Inspector, please complete the following:
Spec. Actual Inspector
Fit Up:
Taper (if specified)
Signature of Inspector:

Prints available? YES NO


Welds numbered? YES NO