This document outlines standard drawings for the Eastern Indonesia National Road Improvement Project from July 2008. It contains requirements for highway work on the project set by the Ministry of Public Works Directorate General of Highway in the Republic of Indonesia. The document provides consulting services from ARRB Group Ltd, The Louis Berger Group, Inc, VicRoads, PT. Perentjana Djaja, and PT. Dacrea Mitrayasa.
This document outlines standard drawings for the Eastern Indonesia National Road Improvement Project from July 2008. It contains requirements for highway work on the project set by the Ministry of Public Works Directorate General of Highway in the Republic of Indonesia. The document provides consulting services from ARRB Group Ltd, The Louis Berger Group, Inc, VicRoads, PT. Perentjana Djaja, and PT. Dacrea Mitrayasa.
This document outlines standard drawings for the Eastern Indonesia National Road Improvement Project from July 2008. It contains requirements for highway work on the project set by the Ministry of Public Works Directorate General of Highway in the Republic of Indonesia. The document provides consulting services from ARRB Group Ltd, The Louis Berger Group, Inc, VicRoads, PT. Perentjana Djaja, and PT. Dacrea Mitrayasa.