Tata Powerkalinganagar Cpp1: Cumul. Engg Progress Planned Progress
Tata Powerkalinganagar Cpp1: Cumul. Engg Progress Planned Progress
KalingaNagar CPP1
Master Drawing TYCO
List - DOCUMENT STATUS
Cumul. Engg Progress 97.79% Remaining documents 0 Plan to be approved 245
Planned Progress 100.05% To be submitted till date 245 Approved 209
Thursday, September 17, 2020 Submitted till date 238 Due by >6days by TYCO 21
Due for Submission 7 Due by >6days by Tata 1 Issue 0 Issue 1 Issue 2 Issue 3
Tata Tata Tata Tata
Vendor Soft Copy Vendor Soft Copy Vendor Soft Copy Vendor Soft Copy
Scheduled Latest Approval Transmitt Approval Transmitt Approval Transmitt Approval Transmitt
Sr. No. Drawing / Document number Drawing / Document title Category Weightage Eng Progress Due Responsibility Days Delayed Transmitt Receipt Date Transmitt Receipt Date Transmitt Receipt Date Transmitt Receipt Date
Submission Date code al code al code al code al
al number Date al No Date al No Date al No Date
Number Number Number Number
BASIC ENGG
PIPING & INSTRUMENT DIAGRAM FOR FIRE
1 TP0004-V009-00-P02-M3-001
WATER PUMPS HOUSE
A 1.25% 1.25% 22-Jan-13 1 18-Jan 31-Jan 3 7-Feb 26-Feb 3 20-Mar 3 31-Mar 10-Apr
7 TP0004-V009-00-ME-DBR-001 DESIGN BASIS REPORT FOR HYDRANT SYSTEM A 1.25% 1.25% 22-Jan-13 1 18-Jan 28-Jan 3 10-May 24-May 2 26-Jul 7-Aug 2 7-Oct 28-Oct
8 TP0004-V009-00-ME-DBR-002 DESIGN BASIS REPORT FOR MVWS SYSTEM A 1.25% 1.25% 22-Jan-13 1 8-Feb 22-Feb 3 10-May 24-May 1
9 TP0004-V009-00-ME-DBR-003 DESIGN BASIS REPORT FOR HVWS SYSTEM A 1.25% 1.25% 22-Jan-13 1 8-Feb 22-Feb 3 10-May 24-May 1
10 TP0004-V009-00-ME-DBR-004 DESIGN BASIS REPORT FOR FOAM SYSTEM A 1.25% 1.25% 22-Jan-13 1 8-Feb 22-Feb 2 10-May 24-May 1
DESIGN BASIS REPORT FOR AUTOMATIC
11 TP0004-V009-00-ME-DBR-005
SPRINKLER SYSTEM
A 1.25% 1.25% 22-Jan-13 1 8-Feb 22-Feb 3 10-May 24-May 2 26-Jul 7-Aug 1
23 TP0004-V009-00-P02-G1-003 GENERAL HYDRANT LAYOUT FOR TG BUILDING A 0.421052% 0.42% 29-Mar-13 1 21-May 8-Jun 2 26-Jul 14-Aug 2 28-Oct 20-Nov 2 22-Jan 7-Feb
24 TP0004-V009-00-P02-G1-004 GENERAL HYDRANT LAYOUT FOR BOILER UNIT A 0.421052% 0.42% 29-Mar-13 1 24-May 17-Jun 3 26-Jul 14-Aug 2 2-Sep 8-Oct 3 22-Jan 13-Feb
27 TP0004-V009-00-P02-G1-007 GENERAL HYDRANT LAYOUT FOR IDCT AREA A 0.421052% 0.42% 29-Mar-13 1 17-May 17-Jun 2 26-Jul 14-Aug 2 2-Sep 8-Oct 1
GENERAL HYDRANT LAYOUT FOR GIS CUM
28 TP0004-V009-00-P02-G1-008
ADMIN BUILDING
A 0.421052% 0.42% 29-Mar-13 1 15-Apr 16-Apr 3 15-May 20-May 3 5-Jun 8-Jun 2 1-Oct 15-Oct
29 TP0004-V009-00-P02-P5-001 FIRE WATER PUMP HOUSE PIPING LAYOUT A 0.421052% 0.42% 28-Feb-13 1 17-May 30-May 3 27-Sep 10-Oct 2 29-Nov 26-Dec 2 29-Jan 7-Feb
PIPING LAYOUT FOR HVW SPRAY SYSTEM FOR
30 TP0004-V009-00-P02-P5-002
GENERATOR TRANSFORMER ( GT 1)
A 0.421052% 0.42% 8-Feb-13 1 14-Feb 21-Feb 3 22-Feb 16-Mar 3 24-Apr 30-Apr 2 17-May 31-May
Page 1 of 5
HYDRAULIC CALCULATION OF SPRINKER
101 TP0004-V009-00-M-CA-031
SYSTEM FOR WORKSHOP
I 0.421052% 0.42% 22-Mar-13 1 21-May 8-Jun 1
CALCULATION (CLEAN AGENT)
PR. DROP CALCULATION OF 300 BAR INERGEN
102 TP0004-V009-00-M-CA-032
SYSTEM FOR CCR & MEE
I 0.421052% 0.42% 18-Feb-13 1 24-May 27-May 3 10-Jul 23-Jul 3 28-Aug 4-Sep 2 28-Aug 19-Sep
PR. DROP CALCULATION OF 300 BAR INERGEN
103 TP0004-V009-00-M-CA-033
SYSTEM ECR FOR UNIT#1
I 0.421052% 0.42% 18-Feb-13 1 24-May 27-May 3 10-Jul 23-Jul 3 28-Aug 4-Sep 2 28-Aug 19-Sep
PR. DROP CALCULATION OF 300 BAR INERGEN
104 TP0004-V009-00-M-CA-034
SYSTEM ECR FOR UNIT#2
I 0.421052% 0.42% 18-Feb-13 1 24-May 27-May 3 10-Jul 23-Jul 3 28-Aug 4-Sep 2 28-Aug 19-Sep
PR. DROP CALCULATION OF 300 BAR INERGEN
105 TP0004-V009-00-M-CA-035
SYSTEM ECR FOR UNIT#3
I 0.421052% 0.42% 18-Feb-13 1 24-May 27-May 3 10-Jul 23-Jul 3 28-Aug 4-Sep 2 28-Aug 19-Sep
119 TP0004-V009-00-M-DS-016 DATA SHEETS FOR JOCKEY PUMP WITH MOTOR A 0.285714% 0.29% 8-Feb-13 1 15-May 24-May 3 5-Jul 13-Jul 3 14-Aug 19-Aug 3 22-Aug 26-Aug
120 TP0004-V009-00-M-DS-017 DATA SHEETS FOR Y - TYPE STRAINER A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 17-Jun 20-Jun 2 19-Jul 1-Aug 2 5-Sep 6-Sep
DATA SHEETS FOR HYDRANT VALVE SINGLE
121 TP0004-V009-00-M-DS-018
HEAD
A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 20-Mar 3 31-Mar 9-Apr 1 23-Sep 27-Sep
122 TP0004-V009-00-M-DS-019 DATA SHEETS FOR WATER MONITOR A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 20-Mar 3 31-Mar 9-Apr 1
123 TP0004-V009-00-M-DS-020 DATA SHEETS FOR HOSE PIPE WITH COUPLING A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 9-Apr 2 24-Apr 30-Apr 1
124 TP0004-V009-00-M-DS-021 DATA SHEETS FOR BRANCH PIPE WITH NOZZLE A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 9-Apr 3 24-Apr 30-Apr 1
125 TP0004-V009-00-M-DS-022 DATA SHEETS FOR HOSE BOX A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 4 26-Jul 7-Aug 2 10-Sep 20-Sep 1
126 TP0004-V009-00-M-DS-023 DATA SHEETS FOR HVW SPRAY NOZZLE A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 18-Mar 2 31-Mar 9-Apr 1
127 TP0004-V009-00-M-DS-024 DATA SHEETS FOR MVW SPRAY NOZZLE A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 18-Mar 2 31-Mar 9-Apr 1
DATA SHEETS FOR QUARTZOID BULB
128 TP0004-V009-00-M-DS-025
DETECTOR
A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 18-Mar 2 31-Mar 9-Apr 1
129 TP0004-V009-00-M-DS-026 DATA SHEETS FOR DELUGE VALVE A 0.285714% 0.29% 22-Jan-13 1 21-Jan 4 13-Feb 3 6-Mar 18-Mar 2 31-Mar 9-Apr 1
DATA SHEETS FOR DRY CHEMICAL POWDER
130 TP0004-V009-00-M-DS-027
TYPE PORTABLE FIRE EXTINGUISHERS
A 0.285714% 0.29% 8-Feb-13 1 19-Mar 16-Apr 2 3-Sep 10-Sep 1
168 TP0004-V009-00-M-DS-066 DATA SHEETS FOR "C" & "L" R.1/4" VENT VALVE A 0.285714% 0.29% 8-Feb-13 1 8-Feb 1-Mar 3 15-May 23-May 1
169 TP0004-V009-00-M-DS-067 DATA SHEETS FOR BLEED VALVE R.1/4" A 0.285714% 0.29% 8-Feb-13 1 8-Feb 1-Mar 3 15-May 23-May 1
170 TP0004-V009-00-M-DS-068 DATA SHEETS FOR I FLOW VALVE A 0.285714% 0.29% 8-Feb-13 1 8-Feb 1-Mar 3 15-May 23-May 1
171 TP0004-V009-00-M-DS-069 DATA SHEETS FOR HORIZONTAL CHECK VALVE A 0.285714% 0.29% 8-Feb-13 1 8-Feb 1-Mar 2 15-May 23-May 1
172 TP0004-V009-00-M-DS-070 DATA SHEETS FOR R1SC HOSE A 0.285714% 0.29% 8-Feb-13 1 8-Feb 1-Mar 2 15-May 23-May 1
TP0004-V009-00-M-DS-073 DATA SHEETS FOR REVOLVING HEAD 1 24-May 30-May 2 19-Jun 24-Jun 1
TP0004-V009-00-M-DS-074 DATA SHEETS FOR SEAMLESS PIPE 1 24-May 11-Jun 2 1-Oct 9-Oct 1
TECHNICAL DATA SHEET (CONTROL SYSTEM)
173 TP0004-V009-00-E-DS-001 DATA SHEETS FOR CONTROL PANEL A 0.475714% 0.48% 22-Jan-13 1 19-Mar 24-Apr 3 7-Oct 18-Oct 3 12-Feb 1-Mar 1
174 TP0004-V009-00-E-DS-002 DATA SHEETS FOR GAS RELEASE PANEL A 0.475714% 0.48% 22-Jan-13 1 19-Mar 24-Apr 3 7-Oct 18-Oct 3 12-Feb 1-Mar 1
175 TP0004-V009-00-E-DS-003 DATA SHEETS FOR MODULE A 0.285714% 0.29% 22-Jan-13 1 19-Mar 24-Apr 2 26-Jul 12-Aug 2 1-Oct 9-Oct 2 12-Feb 1-Mar
176 TP0004-V009-00-E-DS-004 DATA SHEETS FOR MANUAL CALL POINT A 0.285714% 0.29% 22-Jan-13 1 19-Mar 24-Apr 3 26-Jul 12-Aug 3 1-Oct 9-Oct 2 12-Feb 1-Mar
177 TP0004-V009-00-E-DS-005 DATA SHEETS FOR HOOTER A 0.285714% 0.29% 22-Jan-13 1 19-Mar 24-Apr 3 26-Jul 12-Aug 1
178 TP0004-V009-00-E-DS-006 DATA SHEETS FOR HOOTER CUM STROBE A 0.285714% 0.29% 22-Jan-13 1 19-Mar 24-Apr 3 26-Jul 12-Aug 1
179 TP0004-V009-00-E-DS-007 DATA SHEETS FOR CONTROL CABLE A 0.285714% 0.29% 22-Jan-13 1 19-Jul 13-Aug 3 4-Apr 8-Apr 1
DATA SHEETS FOR PLC BASED CONTROL
180 TP0004-V009-00-E-DS-008
PANEL
A 0.082400% 0.08% 31-Jan-13 1 6-Aug 29-Aug 3 23-Sep 3-Oct 3 31-Oct 12-Nov 1
181 TP0004-V009-00-E-DS-009 DATA SHEETS FOR MCC CONTROL PANEL A
ELECTRICAL ENGG
182 TP0004-V009-00-E06-IC9-001 G.A. FOR PLC PANEL A 1.6666% 1.67% 29-Mar-13 1 19-Jul 26-Jul 3 6-Aug 20-Aug 3 20-Sep 3-Oct 3 15-Oct 16-Oct
183 TP0004-V009-00-E06-IC9-002 G.A. FOR DIESEL ENGINE CONTROL PANEL A 1.6666% 1.67% 29-Mar-13 1 5-Jul 19-Jul 3 23-Aug 3-Oct 3 1-Oct 3-Oct 3 17-Oct 31-Oct
184 TP0004-V009-00-E06-IC9-003 G.A. FOR MCC A 1.6666% 1.67% 29-Mar-13 1 24-May 15-Jun 3 26-Jul 13-Aug 3 3-Sep 11-Sep 3 15-Nov 18-Nov
185 TP0004-V009-00-E06-IC9-004 ELECTRICAL LOAD LIST A 1.6666% 1.67% 29-Mar-13 1 27-May 11-Jun 3 22-Apr 4-May 3 9-May 9-May 1
186 TP0004-V009-00-E06-IC9-005 I/O LIST A 1.6666% 1.67% 29-Mar-13 1 21-May 6-Jun 2 4-Oct 31-Oct 2 7-Feb 17-Feb 1
187 TP0004-V009-00-E06-IC9-006 INSTRUMENTS LIST A 1.6666% 1.67% 29-Mar-13 1 10-Jul 22-Jul 3 25-Apr 28-Apr 1
GENERAL LAYOUT OF CABLE ROUTING OF FIRE
TP0004-V009-00-E06-IC9-007
PROTECTION SCOPE
1.6666% 1.67% 29-Mar-13 1 24-May 19-Jun 3 2-Sep 30-Sep 3 26-Feb 2 31-Mar
QA QC
188 TP0004-V009-00-M-QAP-001 QAP FOR MS PIPE A 0.0724% 0.07% 31-Jan-13 1 25-Mar 31-Mar 1
189 TP0004-V009-00-M-QAP-002 QAP FOR MS GALVANISED PIPE A 0.0724% 0.07% 31-Jan-13 1 11-Jun 24-Jun 3 27-Jun 11-Jul 1
190 TP0004-V009-00-M-QAP-003 QAP FOR PIPE FITTINGS - MS A 0.0724% 0.07% 31-Jan-13 1 26-Apr 4-May 3 9-May 21-May 1
191 TP0004-V009-00-M-QAP-004 QAP FOR PIPE FITTINGS - GI A 0.0724% 0.05% 31-Jan-13 3 TYCO 2642 11-Jun 24-Jun 3
192 TP0004-V009-00-M-QAP-044 QAP FOR INERGEN SYSTEM A 0.0724% 0.07% 31-Jan-13 1 3-Oct 17-Oct 3 25-Oct 31-Oct 1
193 TP0004-V009-00-M-QAP-006 QAP FOR C.I. GATE VALVE A 0.0724% 0.07% 31-Jan-13 1 8-Aug 21-Aug 3 5-Sep 17-Sep 1
194 TP0004-V009-00-M-QAP-009 QAP FOR BUTTERFLY VALVE A 0.0724% 0.07% 31-Jan-13 1 8-Aug 21-Aug 3 5-Sep 17-Sep 1
195 TP0004-V009-00-M-QAP-010 QAP FOR C.I. NON-RETURN VALVE A 0.1100% 0.00% 31-Jan-13 -2786 TYCO
196 TP0004-V009-00-M-QAP-013 QAP FOR AIR RELEASE VALVE A 0.3324% 0.33% 31-Jan-13 1 15-Jan 16-Jan 1
197 TP0004-V009-00-M-QAP-014 QAP FOR FIRE WATER PUMP WITH MOTOR A 0.0724% 0.07% 31-Jan-13 1 10-Jul 19-Sep 25-Sep 2 26-Sep 4-Oct 1
QAP FOR FIRE WATER PUMP WITH DIESEL
198 TP0004-V009-00-M-QAP-015
ENGINE
A 0.0724% 0.07% 31-Jan-13 1 18-May 24-Jun 3 11-Sep 12-Sep 3 26-Sep 9-Oct 3 16-Oct 18-Oct
199 TP0004-V009-00-M-QAP-016 QAP FOR JOCKEY PUMP WITH MOTOR A 0.0724% 0.07% 31-Jan-13 1 10-Jul 7-Sep 3 19-Sep 25-Sep 1
200 TP0004-V009-00-M-QAP-017 QAP FOR Y - TYPE STRAINER A 0.0724% 0.07% 31-Jan-13 1 30-Jul 7-Aug 3 26-Aug 2-Sep 1
201 TP0004-V009-00-M-QAP-018 QAP FOR HYDRANT VALVE SINGLE HEAD A 0.0724% 0.07% 31-Jan-13 1 16-Jul 31-Jul 3 7-Aug 12-Aug 1
202 TP0004-V009-00-M-QAP-019 QAP FOR WATER MONITOR A 0.0724% 0.07% 31-Jan-13 1 16-Jul 31-Jul 3 24-Sep 3-Oct 14-Oct 1
203 TP0004-V009-00-M-QAP-020 QAP FOR HOSE PIPE WITH COUPLING A 0.0724% 0.07% 31-Jan-13 1 17-Jul 31-Jul 3 8-Aug 9-Sep 20-Sep 2 17-Oct 24-Oct
204 TP0004-V009-00-M-QAP-021 QAP FOR BRANCH PIPE WITH NOZZLE A 0.0724% 0.07% 31-Jan-13 1 16-Jul 2-Sep 1
205 TP0004-V009-00-M-QAP-022 QAP FOR HOSE BOX A 0.1100% 0.11% 31-Jan-13 1 24-Jan 1-Feb 1
206 TP0004-V009-00-M-QAP-023 QAP FOR HVW SPRAY NOZZLE A 0.0724% 0.07% 31-Jan-13 1 11-Jun 27-Jun 3 8-Aug 20-Aug 2 27-Aug 31-Aug 1
207 TP0004-V009-00-M-QAP-024 QAP FOR MVW SPRAY NOZZLE A 0.0724% 0.07% 31-Jan-13 1 11-Jun 27-Jun 3 8-Aug 20-Aug 2 27-Aug 31-Aug 1
208 TP0004-V009-00-M-QAP-025 QAP FOR QUARTZOID BULB DETECTOR A 0.0724% 0.07% 31-Jan-13 1 11-Jun 27-Jun 3 8-Aug 20-Aug 2 27-Aug 31-Aug 1
209 TP0004-V009-00-M-QAP-026 QAP FOR DELUGE VALVE A 0.0724% 0.07% 31-Jan-13 1 2-May 10-May 3 17-Jul 24-Jul 1
QAP FOR DRY CHEMICAL POWDER TYPE
210 TP0004-V009-00-M-QAP-027
PORTABLE FIRE EXTINGUISHERS
A 0.0724% 0.07% 31-Jan-13 1 6-Nov 9-Nov 1
QAP FOR WHEEL MOUNTED DRY CHEMICAL
211 TP0004-V009-00-M-QAP-028
POWDER TYPE FIRE EXTINGUISHERS
A 0.0724% 0.07% 31-Jan-13 1 6-Nov 9-Nov 1
Weightage Desctiption
100% Approved
90% Approved after comments incorporation
75% Not approved.Resubmit
100% I
50% First Submission
Page 2 of 5
3.05000000000001 0.25416666667
2.76 0.23
0.00285714
0.00285714
0.000724
0.00643828 0.00160957
Page 3 of 5
Issue 4 Issue 5
Tata Tata
Vendor Soft Copy Vendor Soft Copy
Approval Transmitt Approval Transmitt Approval
Transmitt Receipt Date Transmitt Receipt Date
code al code al code
al No Date al No Date
Number Number
2 15-May 18-May 1
18-May 1
3 17-Sep 19-Sep 1
2 24-Apr 30-Apr 1
3 21-Feb 3-Mar 1
2 28-Oct 20-Nov 1
2 26-Feb 28-Mar 1
1
2 19-Jun 1-Jul 1
2 19-Jun 1-Jul 1
3 19-Jun 5-Jul 1
Page 4 of 5
1
1 8-Oct 29-Oct 1
1 8-Oct 28-Oct 1
2 19-Sep 19-Sep 1
2 2-Sep 6-Sep 1
1
1
10-Jan 13-Jan 1
1
1
2 28-Jan 1
1
1
3 14-Apr 4-May 1
1
1
2 28-Oct 12-Nov 1
3 26-Nov 2-Dec 1
2 9-Dec 13-Dec 1