Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress M/S.KBL
Tata Power Kalinganagar Cpp1: Cumul. Engg Progress Planned Progress M/S.KBL
Clarified cum Fire water Pump House /Compressor house 0.6 0.60% 1
Submersible Pump & submersible pump for cable tunnel
39 TP0004-V010-00-M-M22-GI-039 General Arrangement Drawing with motor drawing A 23-Jan-13 8-Feb 26-Feb
0.9 0.90% 1
58 Civil assignment foundation drawing for all the fixed motors A 30-Jan-13 2-Sep 6-Sep
cable sizing calculations and data sheet for all the 0.625 0.63% 1
59 submersible motor I 30-Jan-13 25-Sep 5-Oct
Instrumentation Documents INSTRUMENTATION
Datasheets of Instruments for miscellanious Horizontal 0.95 0.95% 1
60 TP0004-V010-00-IC-M22-DS-066 Pumps (Compound Guage, Pressure Guage) A 7-Feb-13 5-Dec 11-Dec
61 TP0004-V010-00-IC-M10-DS-067 Datasheets of Instruments (VMS ) for CW Pumps 0.9 0.90% A 7-Feb-13 1 8-Nov 18-Nov
Datasheets of Instruments for CW Pumps (RTD, Pressure 0.9 0.90% 1
62 TP0004-V010-00-IC-M10-DS-068 Transmiters, Junction Box) A 7-Feb-13 8-Aug 19-Aug
Control Philosophy including all the set points, permissives, 0.625 0.63% 1
65 alarm and tripping logic for CW pumps and misc. pumps. I 7-Feb-13 2-Aug 23-Aug
66 QAP for all instruments for purchaser's approval 0.625 0.63% A 7-Feb-13 1 13-Feb 18-Feb
67 Instrument list for different pumps 0.625 0.63% I 7-Feb-13 4 KBL 2437 6-Jan 16-Jan
0.625 0.63% 1
68 Interconnection Schedule for instruments for VMS only I 7-Feb-13 8-Nov 18-Nov
69 GA diagram of all JBs and supports (if any) 1.35 1.35% I 7-Feb-13 1 8-Nov 18-Nov
1 1.00% 1
70 Hook up diagram for all applicable instruments including BOQ A 7-Feb-13 12-Mar 14-Mar
71 JB schedule 1 1.00% I 7-Feb-13 1 8-Nov 18-Nov
Specification of special I&C Cables including VMS cables and 1 1.00% 1
72 wiring diagram A 7-Feb-13 8-Nov 18-Nov
Manufacturer’s test, calibration and guarantee certificates 1 1.00% 1
73 for all instruments and control equipment I 7-Feb-13 13-Nov 2-May
1 1.00% 1
74 General arrangement of Control Panel for submersible pumps I 7-Feb-13 3-Oct 8-Oct
QAP
75 TP0004-V010-00-M-M10-QAP-069 Quality Assurance Plan for CW Pumps 3 3.00% A 7-Feb-13 1 6-Feb 22-Feb
76 TP0004-V010-00-E-M10-QAP-070 Quality Assurance Plan for CW Pumps Motors 3 3.00% A 7-Feb-13 1 13-Feb 22-Feb
2 2.00% 1
77 TP0004-V010-00-M-M22-QAP-073 Quality Assurance Plan for Miscellanious Horizontal Pumps A 7-Feb-13 22-Feb 29-Mar
Quality Assurance Plan for Miscellanious Horizontal Pumps 1 1.00% 1
78 TP0004-V010-00-E-M22-QAP-074 Motors A 7-Feb-13 7-May 30-May
79 TP0004-V010-00-M-M22-QAP-075 Quality Assurance Plan for Submersible Pumps and motors 1 1.00% A 7-Feb-13 1 22-Feb 11-Mar
OTHER DOCUMENTS
80 Sump Model test write-up / procedure 2 2.00% 7-Feb-13 1 18-Jan 22-Jan
81 Sump model test GA 2 2.00% I 7-Feb-13 1 18-Jan 22-Jan
82 CFD Analysis technical write-up / procedure 2 2.00% I 7-Feb-13 1 16-Jan 22-Jan
83 CFD Analysis Report along with recommendation 2 2.00% I 7-Feb-13 1 13-Feb 13-Feb
2 2.00% 1
84 TP0004-V010-00-M-M10-EDI-076 Sump Model analysis report along with Video-graphed CD. I 30-Jan-13 18-Apr 23-Apr
85 TP0004-V010-00-M-M10-EDI-077 L2 Schedule for CW & Effluent Disposal Pumps 2 2.00% I 15-Mar-13 1 18-Feb 6-Mar
86 TP0004-V010-00-PM-M22-MPR-079 Master Document List 2 2.00% I 16-Jan-13 1 10-Jan 16-Jan
87 TP0004-V010-00-DM-M10-MPR-080 Operation & Maintainance Manual for CW Pumps 1 1.00% A 16-Jan-13 1 3-Dec 27-Jan
Operation & Maintainance Manual for Effluent Disposal 1 1.00% 1
88 TP0004-V010-00-M-M10-EDI-081 Pumps I 15-Jun-13 2-Sep 15-Nov
Operation & Maintainance Manual for Miscellanious 1 1.00% 1
89 TP0004-V010-00-M-M22-EDI-082 Horizontal Pumps I 15-Jun-13 2-Sep 15-Nov
90 TP0004-V010-00-M-M22-EDI-083 Operation & Maintainance Manual for Submersible Pumps 1 1.00% I 15-Jun-13 1 2-Sep 15-Nov
91 TP0004-V010-00-M-M22-EDI-084 Performance test procedure for CW Pumps 1 1.00% I 15-Jun-13 1 3-May 5-Jun
92 Performance test report for all the pumps 1 1.00% A 15-Jun-13 1 7-Feb
3 13-Jul 25-Jul 1
3 13-Jul 25-Jul 2 27-Sep 9-Oct 2
3 16-Jul 25-Jul 1
2 13-Jul 25-Jul 1
3 3-Jan 7-Jan 1
2 27-Sep 5-Oct 1
3 3-Dec 10-Dec 1
3 16-Jul 20-Jul 1
3 14-May 23-May 3 20-Aug 27-Aug 1
3 13-Feb 6-Mar 1
3 13-Feb 7-Mar 1
3 23-Jan 23-Jan 3 17-Apr 23-Apr 1
13-Feb 28-Feb 3 17-Apr 23-Apr 1
1
1
3 5-Feb 22-Feb 3 25-Apr 14-May 2
2 7-May 3-Jun 1
3 23-May 1