Professional Documents
Culture Documents
Inprocess Check Sheet (ACKA)
Inprocess Check Sheet (ACKA)
Continuty Testing Wire Location i) Beep sound with red light indicstion during
CTF
testing for OK Part.
Coupler Matching ii)*Matching with femail coupler/ fixture should be
Manual
proper.
Visual Inspection (100%) Soldering Joint i) Should be free from soldering defects Visually
Moulding Parts ii) Should be free from moulding defects Visually
Back Out iii) Should not be come out from coupler Manual
Tape availability/ iv) Gray & Red, Location should be as per drg/
sample. Visually
colour/ position
Packing Mix-up i) No mix-up of Material Visually
ii) Date,qty,part name & operator sign should be
Sticker mention on sticker. Visually
Inspected By: