Proposed 4 Storey Building

PEM
Architictural work

Plumbing and sanitary works


1.0Masonry works

Installation of CHB 1. Roughing ins

1.1Exterior walls 1.1Installation of sanitary and pipe and fitings


1.2Interior walls 2.1installatio of water pipe and fitings
3.1 Fabrication

2. Cement plaster 2. Plumbing Tixture

2.1Exterior walls 2.1Installation of water Closet


2.2Interior walls 2.2Installation of lavatories
2.3Installation of floor drains
3. Floor Finishes

4.Plain Cement smooth finish Electrical works

4.1 Tile finish


4.2Water Proofing 1.Roughing ins

1.1Installation electrical conduits/pipe


5.Celling 1.2Installation electrical cable

5.1Installation of celling forms 1.3Installation panel board


5.1Installation of celling board 1.4 Installation of switches

6.Wall Finishes
Auxilary Works
6.1 exterior wall 1.Installation of cert
6.2 interior wall 2.Installation of Intercom
3.Installation of Telephones
7.Comfort rooms
Mechanical works
7.1 Tiles finish

8.Doors and windows 1.Fire Protection

9,0 Paint Finishes 1.1Installation of pipe fitings


1.2Installation of water Sprinkles
1.3Installation of smoker detector
1.4Installation of fire alarm
1.5 1Installation of fire hydrant