Model DPR & Application Form For Integrated RAS PDF
Model DPR & Application Form For Integrated RAS PDF
1|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
CONTENTS
Sl. Particulars Page
No.
1 Project Summary 3
2 Background/Introduction 4
3 Benefits & Justification 4
4 Objectives 4
5 Technical Details 5
a. Site/Location Details
b. Technical specifications
6 Project Formulation 7
a. Organization and management
b. Mode of beneficiary selection
c. Risk assessment (Bio-security & Environmental Concern)
7 Cost Estimates 7
a. Capital Cost
b. Operational Cost
9 Expected Outcomes 10
10 Milestones and Timelines (month-wise) 11
11 Design and layout 12
2|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
1. PROJECT SUMMARY
1. Title INTERGRATED RAS FOR TROUT
CULTURE
3. No. of unit
FY:
3|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
2: INTRODUCTION/BACKGROUND
Trout fish culture is an ideal option for sustainable use of water resources
in mountainous regions because here both surface and underground waters
are suitable for this purpose. In regions where income-generation and
employment opportunities are scarce, trout farming could help to ensure
employment and steady incomes in addition to the production, trout farming
could also ensure increased income and employment through angling tourism,
restaurants and related services. The Rainbow trout has many local strains,
which have developed in the different river systems. Out of these, numerous
improved commercial strains have been bred. The widely cultured commercial
strains have been improved from those original rainbow trout populations that
possessed advantageous qualities, such as hardiness, fast growth, resistance
to diseases and reliable reproduction under farm conditions.
3. BENEFITS AND JUSTIFICATION:
Rainbow trout (Oncorhynchus mykiss) is a farm fish and is thriving well
in culture system in almost all Himalayan States. There is a great demand of
trout fish in India as well it is having good market in other parts of the world,
there is a great potential for development of Trout Fisheries in all hill states as
they are having abundant Cold water resources in the form of springs, high
altitude glacier lakes, snow fed streams, rivers & reservoirs are available for
undertaking such culture. Hill States are having little land holdings as such
need is to culture this species under the RAS conditions for better management
and higher production and intern high returns. The Establishment of RAS of
10 MT Production Capacity of Table size trout and 2 Lakhs Trout fingerlings
will serve as an integrated unit in to the private sector in all the hill states.
4. OBJECTIVES:
Promote semi- indoor/ indoor trout farming under RAS for harnessing
higher production/unit area
Facilitate use of new infrastructure for quality seed rearing
Promote water-reuse concept for integration of RAS to facilitate multiple
crop production and income
Facilitate commercial farming by entrepreneurs/Corporate sector with
more private investment
4|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
5. TECHNICAL DETAILS
b. Technical specifications:
Source of brooders:
5|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
16 UV sterilizer 1 No.
Total Project pipeline, gate valves, automatic NRV, all machine SS made
18 Complete
automatic control panels, wiring sensors etc.
19 Oxygen mixing Air stone for all Tanks + Air pipeline etc. Complete
20 Automatic feeding Systems. Complete
21 Alarm System & Diesel Gen-Set 10 KW 1 No. each
Details of Equipment
1. Insulated Fiber Glass Tank of Proposed Size
6. PROJECT FORMULATION
a. Organization and management:
The project will be implemented by the selected beneficiary under the
6|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
7|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
xvi. Total Project pipeline, gate valves, automatic NRV, all 3.80
machine made automatic control panels, wiring sensors
etc.: Complete
xvii. Oxygen mixing Air stone for all Tanks + Air pipeline etc.: 3.20
Complete
8|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
4 Stocking Size 10 gm
13 Survival Rate 85 %
Fingerling production
S.N Title Description
1 Total Brood Stock 700 kgs
2 Male 400 kgs
3 Female 300 Kgs
Fecundity (Number of Eggs from per kg body
4 1000 Nos. per kgs
weight)
5 Total Green Ova 3,00,000 Nos.
6 Fertilized Eggs 2,80,000 Nos.
7 Stocking Density per trays 10,000 Nos.
9|Page
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
Economic Feasibility
1 Capital cost Rs.59.50 lakhs
2 Input cost Rs. 21.23 lakhs
3 Gross Income Rs. 59.50 lakhs
4 Gross Profit Rs.38.27 lakhs
9. EXPECTED OUTCOMES
The major anticipated outputs of intervention are: -
10 | P a g e
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
Breeding
Fingerling rearing
Harvesting &
Marketing
11 | P a g e
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
12 | P a g e
DPR: INTEGRATED RECIRCULATRY AQUACULTURE SYSTEM
13 | P a g e
14 | P a g e
APPLICATION FORM FOR INTEGRATED RAS
Communication Address:
3 Details of land where Project State:
activities is proposed to be District:
taken up*
Taluk/ Mandal:
Revenue Village:
Ownership (whether freehold or on lease):
If on lease, duration of lease (minimum of 10 years):
Total area of the proposed land (in ha):
4 Cost Estimates: Capital cost:
Estimate as per local SoR Operational cost:
5 Technical Details Area of the land:
Source of water:
Proposed fish spp.:
Area of land:
Expected seed Production(in No.):
Market rate of fish seed (in Rs. /piece):
Expected trout production(in kg):
Market rate of table size fish (in Rs. /kg):
Expected Income(in Rs.):
6 Whether assistance for this YES/NO:
purpose has been obtained If yes (provide the details) Year:
under any other scheme of Quantum of assistance: Conditions for assistance:
the Central/ State
Government/others?
7 Experience of the applicant in
the field and details of
training undergone if any *
8 Source/s for financial
resources to meet the
construction cost beyond the
eligible subsidy**
9 Marketing tie up /other
means of marketing?
*Photo copies of the documents need to be submitted along with application form.
**Proof of source of finance need to be submitted viz. bank consent letter for loan. In case of self-finance, bank
account statement copies of last 6 months need to be submitted.
APPLICATION FORM FOR INTEGRATED RAS
Name of Applicant:
Signature:
1. Application together with documents have been verified and found to be in order.
2. Proposed has been inspected by the Departmental Officer/s and found feasible for taking up
the project as detailed in the DPR.