r-s

ne
Site Investigation, Design & Construction

tiv nd
ow
ec rla
of Hydro & Transport Tunnels

e
sp e
re itz
Kathmandu, Nepal 19 - 20 December 2013

ir w
he - S
Quality Control

ft n
O tio
© a
n nd
M.Sc. Felix Amberg
tio ou
ra F

Amberg Engineering Ltd., Switzerland


st T
llu E
lI C
Al ITA
©
Content

1. Quality – What is that?

r-s
ne
tiv nd
ow
2. Stakeholders and interfaces

ec rla
e
sp e
re itz
3. How is Quality achieved?

ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
What is Quality?

r-s
If I get what I want!

ne
tiv nd
ow
Quality is achieved if

ec rla
e
sp e
the product / the service delivered

re itz
is as requested!

ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
How to achieve Quality?

r-s
Quality is achieved in stages

ne
 design

tiv nd
ow
 production

ec rla
e
 application

sp e
re itz
ir w
he - S
Quality is not
 a one single-point action

ft n
O tio
 a one single stakeholder issue
© a
n nd
tio ou
ra F
st T

How to achieve Quality


llu E

 General procedure
lI C
Al ITA

 Example: Sprayed concrete


©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Involved Stakeholders

r-s
ne
Owner

tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
Applicator
Designer /

ft n
/

O tio
Supervisor
Contractor
© a
n nd
tio ou
ra F
st T
llu E
lI C

Material
Al ITA

Supplier
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality Management as Tool

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T

 Preferably, every stakeholder has a Quality Management System


llu E
lI C

 A Project Management System is compulsary


Al ITA

 There are different interfaces etc between the stakeholder and


©

during the project execution which must be taken care of

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality in Stages – Owners part

r-s
Definition: What do I want!

ne
tiv nd
ow
Definition of all (!) the

ec rla
e
performance requirements of the

sp e
re itz
future infrastructure

ir w
he - S
for example:

ft n
O tio
 Dry tunnel
© a
(better a waterproofing class)
n nd
tio ou

 Sprayed concrete only as first


ra F

support
st T
llu E

 etc
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality in Stages
Interface Owner - Designer

r-s
ne
tiv nd
ow
Owner

ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
Applicator Designer
© a
n nd
tio ou
ra F
st T
llu E
lI C

Material
Al ITA

Supplier
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality in Stages - Performance Criteria Agreement
Owner – Designer Interface:

r-s
Performance Criteria Definitions / Agreement

ne
tiv nd
ow
ec rla
this includes :

e
sp e
re itz
 General objectives for the future use and the safety of the

ir w
he - S
infrastructure

ft n
 Environmental and third party requirements

O tio
 Requirements of operations
© a
n nd
 Specific targets of the owner
tio ou

 Protective goals and special risks


ra F
st T

 Standard-related regulations
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Performance Criteria agreement
Performance requirements on waterproofing

r-s
(for each structure or component of a structure)

ne
tiv nd
ow
 Various recommendations, guidelines, standards,

ec rla
e
defining waterproof classes

sp e
re itz
ir w
he - S
Waterproofing Definition for Characteristic of the

ft n
O tio
Class impermeability on the waterproofed inner soffit

© a
n nd inner soffit
1 Completely dry ….
tio ou
ra F

2 Largely dry ….
st T

3 Slightly wet …
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Performance Criteria agreement
Performance requirements for fast setting sprayed concrete

r-s
(for each structure or component of a structure)

ne
tiv nd
ow
 Various recommendations, guidelines, standards,

ec rla
e
defining early age strength classes

sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality in Stages – Designers part
How to get from Requirements to the Project?

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA

Important aspects for quality:


©

 Knowledge and experience of people


 Available time and money for the design
Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Qualities in Stages
Interface Designer - Supplier

r-s
ne
Owner

tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
Applicator Designer
© a
n nd
tio ou
ra F
st T
llu E
lI C

Material
Al ITA

Supplier
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Designer – Supplier Interface
Designer elaborates

r-s
ne
 Requirements for materials (descriptions, standards, test

tiv nd
ow
specifications etc)

ec rla
e
 Drawings

sp e
re itz
 Supervision and inspection of delivered materials during

ir w
he - S
construction (quality assessment plans)

ft n
O tio
Material supplier delivers
© a
n nd
 Technical approvals (technical data sheets, safety data sheets
tio ou

etc)
ra F

 Production control certifications etc


st T
llu E

 Application guidelines
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Qualities in Stages
Interface Designer - Applicator

r-s
ne
tiv nd
ow
Owner

ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
Applicator Designer
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA

Material
Supplier
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Designer – Applicator Interface
Approval tests – if necessary

r-s
ne
 Demonstration of the suitability of the materials, equipment,

tiv nd
ow
ec rla
construction methodology, operations instruction, the

e
sp e
competence of operatives etc

re itz
ir w
he - S
Base:

ft n
 Application instructions

O tio
 Quality control plan
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Designer – Applicator Interface
Quality control during application

r-s
ne
 Quality Control Plan

tiv nd
ow
 Type of control (for material, equipment, persons)

ec rla
e
sp e
 Frequency and time

re itz
 Execution (underground, environmental conditions,

ir w
he - S
application process and result, curing)

ft n
 Benchmarks values and measures

O tio
 Responsibilities
© a
n nd
 Information flow and documentation
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Designer – Applicator Interface
Contractual documents

r-s
ne
 Construction description

tiv nd
ow

ec rla
Tender specifications

e
sp e
 (Bill of quantities / unit prices)

re itz

ir w
Inspection control plan

he - S
 further documents

ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Material Requirements
Most frequently used sprayed concrete classes (SC)

r-s
Requirements of sprayed concrete and recommended areas of

ne
application (according to SIA 198, Part1)

tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Material Requirements
Sprayed concrete classes SIA 198 Part II

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Material Requirements
Specific requirements for sprayed concrete

r-s
ne
Object Field of application Main requirements

tiv nd
ow
Exca- First support measure Early strength: Class J2

ec rla
vation

e
sp e
Rock support Early strength: Class J2

re itz
Compressive strength class C25/30

ir w
he - S
Working capacity Gf > 4‘000N/m
Water tightness < 40mm

ft n
O tio
© a
n nd
tio ou
ra F

Sealing layer Smoothness: l/h < 10:1


st T

Roughness: < 2mm


llu E
lI C
Al ITA

….
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Contractual Documents

Construction description,

r-s
ne
tender specifications, drawings etc ) and control plan

tiv nd
ow
ec rla
e
Definition of

sp e
re itz
 Selected shotcrete classes

ir w
 Tolerances for width

he - S
 Required pre-tests (qualification tests) for shotcrete of the

ft n
O tio
classes SC 2 to SC 7
© a
n nd
 Requirements on surface (e.g. smooth layer underneath sealing
tio ou

membrane)
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Contractual Documents
Tender Specifications

r-s
072 Shotcrete (according to properties)
specifications

ne
According to SIA 198 and SN EN 206-1

tiv nd
ow
.500 Type SB 2

ec rla
Compressive strength class C25/30

e
sp e
Exposure class XA1, XD1.

re itz
Nominal value of max. grain size D_max 8

ir w
he - S
Chloride content class
Consistency class (as declared by contractor)

ft n
O tio
Additional requirements:

© a
Early strength class according to SIA 198 J2.
n nd
Working capacity Gf > 4’000 N/m
tio ou

Water tightness < 40 mm


ra F

431 Supply and application of wet sprayed concrete (MUL) application


st T
llu E

Invoicing by processed volume of concrete quantities and


lI C

.100 Working area L1 and L2


Al ITA

unit prices
.142 Type of shotcrete SB 2
©

Type of profile: mining tunnel construction


Phase: excavation of bench and invert 5’000 m3

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Contractual documents
Inspection control plan

r-s
ne
tiv nd
ow
ec rla
Subject of test Test Requirement Tests:Time/Intensity Measures Documentation

e
sp e
Shotcrete SB2

re itz
ir w
Early strength Stud driving Early strength class J2 Continually Adjust composition Test record

he - S
Compressive Assessment according Price reduction or Test record
SN EN 12504-1 1 Test / 250 m3
strength SN EN 13791 replacement

ft n
O tio
Price reduction or
Water tightness SN EN 12390-8 Water penetration < 40mm 1 Test / 250 m3 Test record
replacement

© a
n nd 1 Test / 2000m3
Content according to pre-
Content of steel SIA 162/6 or if composition changes Price reduction or
tio ou
tests, total sample quantity Test record
fibres (wall) Paragraph 4 45 or on demand of site replacement
min 20 kg
supervision
ra F

1 Test / 2000m3 Price reduction or


st T

Working capacity SIA 162/6 Gf > 4’000 Nm/m2 Test record


or if composition changes replacement
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Contractual documents
Inspection control plan for excavation, profiles, steel arches etc

r-s
(accord. to Swiss codes sia 198)

ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
How to achieve quality?

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality makes the car drive

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
Quality control is not a one single point action

r-s
ne
tiv nd
ow
ec rla
e
sp e
re itz
ir w
he - S
ft n
O tio
© a
n nd
tio ou
ra F
st T
llu E
lI C
Al ITA
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013
r-s
ne
Site Investigation, Design & Construction

tiv nd
ow
ec rla
of Hydro & Transport Tunnels

e
sp e
re itz
Kathmandu, Nepal 19 - 20 December 2013

ir w
he - S
ft n
O tio
Disclaimer
© a
n nd
tio ou
A. The speakers are presenting their own personal views and are not
ra F

expressing the view of the Foundation.


st T
llu E
lI C

B. Papers and documents displayed or handed out during the Event are
Al ITA

copyrighted. The participants must observe and comply with all applicable
law regulations concerning the copyright.
©

Site investigation, Design & Construction of Hydro & Transport Tunnels | Kathmandu, Nepal – 19-20 December 2013

You might also like