Proposed 3B+G+4P+33+M+R (Commercial /Resi. Bldg.

)
DARCY FRICTION LOSS CALCULATOR FOR MSSKID PIPES, FITTINGS & VALVES

Input / Given Data


Flow Rate (Q) m3/hr 25 0.00694 m3/s INPUTS
Pipe Inside Diameter (ID) mm 90 0.09 m CALCULATED VALUES
Kinematic Viscosity (ν) cSt 1 1.000E-06 m2/s
Specific Roughness (Є) m 7.00E-06
Pipe Length (L) m 165

Calculated Data
Average Velocity - V (m/s) 1.09
Reynolds Number 98244
Darcy Friction Factor 0.018
Head Loss - Pipe (m) 2.05 TOTAL HEAD LOSS, hf (m) 3.383

Calculated Head Loss in Fittings, Valves, Entrances & Exits


Type of fittings K Qty Sub Total K
Strainer 6 0 0
Expanssion Joint 3.3 2 6.6
Butterfly Valve 0.6 0 0
Check Valve, Swing Type 2.3 0 0
Non Return Valve 0.9 1 0.9
Elbow 45 Degrees 0.4 0 0
Elbow 90 Degrees, Long Radius 0.6 0 0
Elbow 90 Degrees, Standard 0.9 12 10.8
Flow Meter, Turbine Type 7 0 0
Foot Valve 0.9 1 0.9
Gate Valve 0.2 2 0.4
Globe Valve 10 0 0
Pipe Entrance, Inward Projected Pipe 1 0 0
Expander 3.3 0 0
Pipe Exit 1 0 0
Tee, Standard, Flow Through Branch 1.7 0 0
Tee, Standard, Flow Through Run 0.6 4 2.4
22
Head Loss - Valves & Fittings (m) 1.34
HYDRAULIC CALCULATIONS - TRANSFER PUMP SET

Issued By:
M/s. M.A.H.Y. KHOORY & CO. L.L.C. Issued for:
P.O BOX: 34001, SHARJAH, U.A.E. Project : Proposed 3B+G+4P+33+M+R (Commercial /Resi. Bldg.)
TEL: +971 6 5430059, FAX: +971 6 5430059 Jumeirah Village, JVC 14 PHRA005
Client : Mr. Waleed Mohammad Mohammad
Consultnat : M/s. National Engineering Bureau
Arrangement of Pumps: 1 Duty+1 Standby Mep. Consultant : M/s. Nottinggham Mechanical & electrical Consulting Eng.
Pump set location: Basement 3 Mep. Cont. : M/s. Tiger Contracting

Fittings
Pipe Dia Flow rate Pipe Velocity Pipe Loss Fitting loss Total Friction Remarks From
S.No Gate
(mm) (M3/HR) Length (m) (m/s) (m) Expansion Joint Elbow NRV Tee (m) loss (m) Drawing
Valve
1 90 25 165 1.09 2.05 2 12 1 2 4 1.34 3.4
Total Friction losses (m) 3.4
Static Head (m) 86
Safety Margin (m) 15
Total Head (m) 104.4
Selected Grundfos Pump model: Capable of Deliver Flow: (Ltr/sec) 6.81 Head (Mtr): 104.4

This calculation is based on Darcy-weisbach equation ie;


Effective Volume: R.T. volume No of R.T T/Volume (Ltr)
(m3) 98.00 1 98,000.00
R.T Volume Initial Filling Time(min) Pump-Q [L/Sec]
Flow Rate
98,000.0 240.00 (4 Hrs) 6.81

hƒ Head Loss, m
L Length of pipe, m
ƒ Darcy fricion factor Isuued Date: Revision Date: Approved date:
d inside Diameter of Pipe, m 19/Mar/20 DD-MM-YYYY DD-MM-YYYY