PROCUREMENT AND CONSTRUCTION OF 1X300 MW THERMAL POWER

PLANT
EARTH COMPACTION TEST REPORT
Form No. C-004

Location/Area of Testing: Report no:

Maximum Dry Density – Lab (MDD): Optimum Moisture Content: Date:


Reduced Level (RL):

Sr. Test Sample Number


Description
No. 1 2 3 4 5 6 7 8

1 Weight of Wet soil + Core Cutter = (Ws) (gm)

2 Weight of Empty Core Cutter = (Wc) (gm)

3 Volume of Core = (Vc) (cc)

4 Weight of Wet soil = (Ws-Wc) (gm)

5 Bulk Density (Yb) = (Ws-Wc)/Vc (gm/cc)

6 Rapid Moisture Meter Reading = (m)

7 Corrected Rapid Moisture Meter Reading = [m/(100-m)]x100

8 Corrected Rapid Moisture Meter Reading (Round off) = (W)%

9 Dry Density (Yd) = (100xYb)/(100+W)

10 Field Compaction = (Yd/MDD)x100


Remarks:

Sub Contractor Checked & Approved by Owner


Signature

Name
Date