PROJECT:

Supply and Installation of 150m3/day


SWRO Plant with Related Civil
Works

Amano sheet roof

NOTE:

ALL DIMENSIONS ARE IN mm

50mm GI pipe

16mm Plinth plastering in New R.R Masonary work for raising Exsisting Plinth Beam Dry Earth Filling
Cement Mortar 1:1:5 Exsisting Plinth Level

G.L G.L
300

R.R Masonry in Cement Mortar 1:5


300 300 300

450
SECTION A-A
8035 8165 3500 3508

DRAWN BY VIRAJ

SCALE NTS

DRWG.NO.

DATE

DESIGNED BY
Closed fitting ridge
Amano sheet CHECKED BY

SHEET NO.
100*50 ridge channal
CAD FILE
50*50mm 'T' channal 50*100 'C' Channal
8mm hook bolt(j bolt)
with sq nut & washer
CUSTOMER
125*20 thk Valance board fixed
125*25 thk valance board 100*10 mm thick m.s plate with 10mm Bolt & nut to M.S Plate
fixed with 10mm bolt & nut

NWS&DB

CONTRACTOR
50mm GI pipe
10m3 PE Tank 10m3 PE Tank
UNITED TRACTOR & EQUIPMENT (PVT) LTD
No.683, NEGOMBO ROAD,
MABOLE, WATTALA.
Tank farm Base
TEL :2932109/29322110/2932111
10mm 150*150mm M.S Plate 8mm nut and bolt
FAX : 2931550

NO DATE
SECTION VIEW
SHOP DRAWINGS
TITLE:

PE Tank Base new Roof