PAR Record # AB8-ELE-74 Aban Job Planning Outline (JPO) (Form 1 of 2 for Assessing Risk) Work Permit Type/

Work Permit Type/ No.

Dismantling of Shaker#2 motors and shifting to main deck Task Date Isolation Certificate #
Task/Activity
Entry Certificate #

1. Complete this Form. Identify Task Steps/Equipment/Participants & *Any Rescue Plan will Department Head
Instructions Responsibilities require its own PAR Approval
2. Transfer the Task Steps to the Hazard Management Form and complete same Name / Job Position
TASK EQUIPMENT

Item No Certification Who Inspects? Dropped Objects Potential


Confirmed?
1 Lot Electrical Hand tools. and cable markers N/A Elec.

2 Multi meter Yes Elec.

3 Lot certified slings Yes Crane. Operator

4 Chain block 2Ton Yes Crane. Operator

TASK PARTICIPANTS

Task Ref. Name Signature* Position Performed Before? Identify Task Supervisor and
No Banks man (where applicable)
1, 6

1-5, 7-13

1-5, 7-13

TASK PROCEDURES /JOB PLAN (Include a Planned TOFS as a specific task step prior to conducting any critical parts of the operation)

Step No. Who Performs Who Supervises Dropped Objects Potential

*By signing your name you are confirming you understand the task, your duties and that you accept the obligation to stop the job (TOFS) for any real or perceived QHSEconcern
SAF-018, 11.April 2012, Reference SAF 330.00Page 1 of 2
1 Review and update Risk Assessment & conduct a pre-task meeting. N/A

2 Obtain required initial Cold Work Permit and Isolation permit N/A

3 Wear the required PPE & assess on-going job in surrounding area. N/A

4 Physically check and verify the effectiveness of isolation N/A

5 Use proper tools for doing job N/A

6 PLANNED TIME OUT for Safety N/A

7 Take note of all the connections before opening the connections N/A

8 Remove connections from junction box and remove both the cable N/A
fixing cleats from cable tray.
9 Open both the motor mounting bolts Yes. Secure Motor

10 Shift both motors to main deck. Yes. Secure Motor

11 Close Cold Work Permit & Isolation certificate or make long term
isolation if the job continues by other dept.
12 Reinstate the circuit breaker and do function test
ENVIRONMENTAL PRECAUTIONS
Step Ref. Task Step / Environmental Hazard / Prevention Control Required Who Performs Who Supervises Dropped Objects Potential

13 When finished ensure all tools and work material are removed N/A
from work area. (Hazardous/Non Hazardous waste)

*By signing your name you are confirming you understand the task, your duties and that you accept the obligation to stop the job (TOFS) for any real or perceived QHSEconcern
SAF-018, 11.April 2012, Reference SAF 330.00Page 2 of 2