Structural Calculations "Proposed Two Storey Residential": Engr. Renvil M. Pedernal Civil Engineer PRC NO: 0160678

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

STRUCTURAL CALCULATIONS

"PROPOSED TWO STOREY


RESIDENTIAL"

ENGR. RENVIL M. PEDERNAL


CIVIL ENGINEER
PRC NO: 0160678
TIN NO: 742-806-735-000
PTR NO: 10083544A
DATE ISSUED: 4/05/2019
ISSUED AT: ANTIPOLO RIZAL
PROJECT : PROPOSED TWO STOREY RESIDENTIAL
LOCATION : BLK 19 LOT 28 YEN ST., LORES COUNTRY HOMES,
BRGY. SAN ROQUE ANTIPOLO CITY
OWNER : ALEX BALANGUE

STRUCTURAL A N A LY S I S
I. DESIGN DATA
LIVE LOAD 100PSF DECK ROOF 4,788 Pa
100PSF CLASSROOM 4,788 Pa
DEAD LOAD 150 PCF REINF CONCRETE 24 KN/M³
35 PSF 4" CHB 2,154 Pa
45 PSF 6" CHB 2,423 Pa
5 PSF G.I.SHEET 239.40 Pa
EXTERNAL LOAD
WIND PRESSURE 140 MPH 240KPH 40 PSF 1,914 Pa horizontal projection
SEISMIC LOAD V = .82 Naẉ Where I= 1.0 Z= 0.40
Rẉ= 8.40 Nᵥ= 1.60
Na= 1.20
V= .06024 W
SOIL BEARING CAPACITY = 2,000 PSF 96 Kpa
II. DESIGN CRITERIA
A. CONCRETE
fc' = 2,500 psi 17.24 Mpa Ѵa = 40 psi
fc = 1,350 psi 9.31 Mpa Ua = 120 psi
fy = 18,000 psi 124.11Mpa fa = 900 psi
Fy = 40,000 psi 275.80 psi d = l/360

CONFORMED BY:
Owner: ALEX BALANGUE

PREPARED BY: ENGR. RENVIL M. PEDERNAL


CIVIL ENGINEER
PRC # 0160678 VALID 2/25/2021
PTR # 10083544A
T.I.N. # 742-806-735-000
A) SEISMIC ANALYSIS OF TWO STOREY BLDG
o.m. wt total

P10

3.00
+ P7.0

3.5
P3.5

3.5
v

6.00 6.00
Ra Rb Rc

DESIGN DATA: SEISMIC ZONE FACTOR = 1.20 AT MAGNITUDE 8.5 AT


RITCHER SCALE
V = (ZIC/Rw)W WHERE V = DESIGN BASE SHEAR
Z = ZONE FACTOR
I = IMPORTANCE FACTOR
C = NUMERICAL COEFECIENT TO IMPORTANCE FACTOR
Rw = NUMERICAL COEFECIENT TO SEISMIC
WIND PRESSURE = 240 KPH = 40PSF HORIZONTAL PROJECTION
25% wind factor = 10psf
total = 50psf
width of span = 3.50m = 11.48ft
unit wt = 50psf x 11.48 = 574 lbs/ft

LEVEL W H ξ WH
WP10.5 = 574(3.50 x 3.28)² = 21.614k
WP7 = 574(3.50 X 3.28)² = 21.614K
WP3.5= 574(3.50 X 3.28)² = 21.614K
WPv = 574(0 X 3.28)² = 0
TOTAL 278.48K
64.842

V = 1.20 X .67 X .14 X 1.0 X 64.842 = 7.299K

Fwp = (Vw x Hr)/ Wh


Fwp10.5= (7.299 x 21.614)/64.842 = 2.433k
Fwp7 = (7.299 x 21.614)/ 64.842 = 2.433k
Fwp2.60 = (7.299 x 21.614)/ 64.842 = 2.433k
Fwp 0.00 = ( 0 x 31.346)/64.842 = .00k

wt of column one span of the bldg = 80.00k


FOR OVERTURNING MOMENT
take ξMRa = 0
Rb6m - (80k x 9m) - (2.433 x 12m)- (2.433x 6m) + RC 12m = 0
∑Fv = 0 Ra + Rb + Rc - 80 = 0 but Ra = 0 Rb = 80- Rc
from equation 1 ( 80- Rc)6m -(29.196) - 14.60 + 12Rc = 0
480 - 6Rc - 29.196 -14.60 + 12Rc = 0
R c= 24.23k therefore Rb = 80-24.23 = 55.77k
overturning = (80 x 6)-(2.433 x 10.5)-(2.433 x 7)- (2.435 x 3.5) = 428.91k

counter moment = 80 x 6 x 3.28 = 1574.40ft - lbs > o.m. ok


finally wt of bldg will govern
9.45
B. DESIGN OF ROOFING SYSTEM
40psf
2.5m

φ
2.35m 6.00m

B.1. DESIGN OF PURLINS


WPN = 40(2 X SIN φ)/ 1+ SINφ =9.58PSF
W1 = G.I.SHEET = 2.50LBS/FT X 2.30FT = 5.75 LBS/FT X COSφ= 5.50LBS/FT
W2 = PURLINS = 5.16 LBS/FT
TOTAL = 20.24LBS/FT
Sx/Sy = Mn/Mt = 1/8(20.24 X (3.00 X 3.28)² = 1.0512
1/8 (20.24COSφ X (3.00 X 3..28)²
Sx = 1.0512 Sy say sy= 2.5 then sx =2.628
from table interpolation
try 2" x 3" x 1.2mm purlin spaced at 24"
properties: Sx = 1.38 Sy = 2.68 d= 3" Tw = 1/16 Tf = 1/16
Bf = 2"
from flexure fb = Mt/Sx + Mn/Sy = (3,036 /1.38) + (2,888.22/2.68)
= 3.277.70psi < Fba = .60fy = .60 x 36,000 = 21,600 ok
from shearing Fva = .40fy = .40 x 36,000 = 14,400psi
fv = v² + Vt² = 1381psi < 14,400psi ok
dTw 2bf tf
from deflection
d = 5wl⁴ = 5 ( 20.24 x 9.84⁴)x 1728 = .087" < da = ( 9.84 x 12)/360 ok
384 EI 384 x29 x 10⁶ x 1.69
finally adopt purlins C 2" x 3" x 1.2mm spaced at 24" on center
provide sag rod 3/8" dia between rafters

B.2. Design of rafters


span or spacing of rafters maximum = 3mts = 9.84m
wt from purlins = 15 pcs - c-purlins = 15 x 5.16 #/' x 9.84 = 762#
Mpurlins = 1/4 ( 762 x 9.84 )x 12 = 22,494.24 in-lbs
try rafters 2- channel 2" x 6" x 2mm
Mrafters = 1/8 x 18.90#/' x 9.84²x 12 = 2,745in- lbs
Mt = 25,239.25 in-#

tentative section assume that ;


fb = 102/000cb < L/rt < 510,000cb cb= 1.00
fy fy
fb=3/4(.60Fy) = >1/3(.60Fy
16,200psi > 7,200psi
Fb = ((2/3) - Fy(L/rt)²)) Fy = therefore rt = 1.12
1,50,000cb
from flexure ,
S = M/fb = 25,239.25/ 14,400 = 1.76
try w 5 x 16
properties; Sx = 8.51 rt = 2.13 I = 21.30 in⁴
check for bending
allow bending L/rt = 120 = 56.33
2.13
Fba = 36,000( 2/3 - 36,000(56.55²) ) = 21,312psi
1,530,000 x1
Fb = 25,239.25 / 8.91 = 2,950 psi < 21,312psi ok

check for shear


Fv = V = 1/2 ( 7,684.06) = 2,050psi < 14,400psi ok
dtw 5 x 3/8

check for deflection


d = 5 (7684.06 x 11.48³) 1728 = .0025" < da = (9.84 x 12)/360 = .328 0k
384 x 29 x 1,000,000 x 21.30
finally adopt rafters 2- 2" x 6" x 1/4" max spacing 4.00m
use base plate 8" x 8" x 1/4 w/ 2- 16mmφ x 12" anchor bolts A325

C. DESIGN OF CONCRETE MEMBERS

I. DESIGN OF SLAB
take short span max = 4.10m - .250 = 3.85m = 12.63ft
WT.FROM LIVE LOAD = 100#/ft² X one ft strip = 100.0#/ft
WT.FROM DEAD LOAD = 5"/12" X 150pcf X one ft strip = 62.50 #/ft
WT OF FINISH = 5PSF X one ft strip = 5.0#/ft
167.50 #/ft
use 0ne way slab for design
M = 1/12 wl² = 1/12[ 167.50 X( 12.63)²]12 = 26,719.08 "-#

d = [ M/RB]˙⁵ = * 26,719.08/ (138.6X10)+˙⁵ = 4.40"+ .50 = 4.90" < 5" OK

As = M / fѕјd = * 26,719.08/( 18,000x.866x4.50)+ = .42 sq.inches using 1/2"dia bar


area = .196 sq,inch
Spacing = 12x.196/.42 = 5" on center

check for shearing ,


Ѵ = V/ bd = ⅟₂ , *167,50 x 12.63+/(12x 4.5)- = 19.59psi < 40 psi ok

check for bond


µ = V/ Σ̧οj d = ⅟₂{ 167.50 x 12.63/(2x1.57x.866x4.5) = 86.44 psi < 120 psi ok

finally adopt thickness of slab = 5"


use 1/2" dia main reinforcing steel bar spaced at 8" o.c. b.w. top and bottom

1/2"φ main bott bar spaced at 4" o.c.longtl

1/2"φmain bott bar spaced at 4" o.c. transv.


1/2"φ top bend up and extra bar spaced at
4"o.c.

1/2"φ bott bar longtl spaced at 8"o.c.


1/2"φ bott & bott bar spaced at 8"o.c.

2. design of floor beam and roof beamss B-2


max Length = 4.10 - .25 =3.85m = 12.63ft
wt from slab = 167.50#/'x 9.84 = 1648.20#/'
wt of beam = 8/12 x 16/12 x 150 = 133.33#/'
wt of chb wall 6 inches w/ plastering = 40#/ft² x 8ft = 320#/"
total unit wt = 2,101.53 x 2/3 =1,401.02#/'
M = 1/12 WL² = 1/12 x 1401.02 x 12.63² x 12 = 223,486.37in -lbs

d = [ M/RB]˙⁵ = * 223,486.37/ (138.6X10)+˙⁵ = 12.70"+ 1.50 = 14.20"< 16" OK


As = M / fѕјd = * 223486.37/( 18,000x.866x18.5)+ = .775sq.inches using 5/8"dia bar
area = .306 sq,inch
Nas = .775/.306 = 2.53 < 5pcs - 5/8"dia main bars

check for shearing ,


Ѵ = V/ bd = ⅟₂ , *1401.02 x 12.63+/(10 x20)- = 44.24psi > 40 psi ok
provide max spacing of stirrups
spacing = 2φfs/v'b = 2x.11x18,000 = 75" > 8"
(44.24-40)x 12
check for bond
µ = V/ Σ̧j d = ⅟₂{ 1401.02 x 12.63/(5x1.57x.866x18.50) = 70.35psi < 120 psi ok

finally adopt B-2 10" x 20"


use 5- 5/8" dia main reinforcing steel bar
provide 3/8 stirrups spaced at 4-2", 4-4", 4-6" rest at 8" o.c.

3-5/8"dia 5- 5/8"dia

20 20
5-5/8"φ 3-5/8" dia
10 10
sect at midspan sect at support

3. design of BEAM B-1


max Length = 6.00- .30 = 5.70m = 18.70ft
wt from slab = 167.50#/'x 12 = 2,010#/'
wt of beam = 10/12 x 20/12 x 150 = 208.33#/'
wt of chb wall inches w/ plastering = 40#/ft² x 8ft = 320#/"
total unit wt = 2538.9(2/3) = 1,692.22#/'
M = 1/12 WL² = 1/12 x 1692.22x 18.70² x 12 = 591,752.41 in -lbs

d = [ M/RB]˙⁵ = * 591,752.41/ (138.6X12)+˙⁵ = 18.85"+ 1.50 = 20.35"= 20" OK

As = M / fѕјd = * 591,752.41/( 18,000x.866x18.50)+ = 2.052sq.inches using 3/4"dia bar


area = .44 sq,inch
Nas = 2.052/.44 = 5 < 6pcs - 3/4"dia main bars

check for shearing ,


Ѵ = V/ bd = ⅟₂ , 1692.22 x 18.70+/(12x20)- = 65.92psi < 40 psi ok
provide max spacing of stirrups
spacing = 2φfs/v'b = 2x.11x18,000 = 12.73" > 8"
(65.92-40)x 12

check for bond


µ = V/ Σ̧j d = ⅟₂{ 1692.22 x 18.70/(6x2.36x.866x18.50) = 69.75psi < 120 psi ok

finally adopt B-1 12" x 20"


use 6- 3/4" dia main reinforcing steel bar
provide 3/8 stirrups spaced at 4-2", 4-4", 4-6" rest at 8" o.c.

3-5/8"dia 6- 5/8"dia

20 20
6-5/8"dia 3-5/8" dia
10 10
sect at midspan sect at support

5. design of beam B-1A


Length = 8.10m- .30 = 7.80 m =25.59 ft
wt from slab = 167.50#/'x 9.84' = 1648.20
wt of beam = 12/12 x 20/12 x 150 = 133.33#/'
wt of chb wall inches w/ plastering = 40#/ft² x 8ft = 320#/"
total unit wt = 620.84#/'
M = 1/12 WL² = 1/12 x 620.84 x (18.703)² x 12 = 217,171.203in -lbs

d = [ M/RB]˙⁵ = * 217,171.203/ (138.6X10)+˙⁵ = 12.50"+ 1.50 = 14"< 16" OK

As = M / fѕјd = * 217,171.203/( 18,000x.866x14.5)+ = .960sq.inches using 5/8"dia bar


area = .306 sq,inch
Nas = .906/.306 = 3.13 < 4pcs - 5/8"dia main bars

check for shearing ,


Ѵ = V/ bd = ⅟₂ , *620.84 x 18.703+/(10x16)- = 36.29psi < 40 psi ok

check for bond


µ = V/ Σ̧j d = ⅟₂{ 600.84x 18.703/(5x1.57x.866x14.5) = 57.00psi < 120 psi ok

finally adopt B-1 10" x 16"


use 5- 5/8" dia main reinforcing steel bar
provide 3/8 stirrups spaced at 4-2", 4-4", 4-6" rest at 8" o.c.

3-5/8"dia 5- 5/8"dia
16 16
5-5/8"dia 3-5/8" dia
10 10
sect at midspan sect at support

6. DESIGN OF COLUMN C- 2 typical

wt from beam B-4 = 620.84 x 10.66 = 6,618.15#


wt from col C-2 = 6/12 x 16/12 x 12 x 150 = 1600 #
total wt = 8,218#
c = .85 Ag ( .225Fc' + PgFs) = 8218
8,218 = .85 x 6 x 16 ( .225 x 2500 + 18000Pg)
Pg = -.0247 < + 1% = .01
As = PgAg = .01 x 12 x 12 = 1.44 sq mts
Nas = 1.44/.306 = 4.7 < 8-5/8" dia
check for buckling
M = 8,218 x 12/2 = 49,308 in-lbs

d = [ M/RB]˙⁵ = * 49,308/ (138.6X16)+˙⁵ = 4.5"+ 1.50 = 6"< 12" OK

As = 49,308/ 18000x .866 x 12.5 = .259 sqin < 1.44 sq in ok

finally adopt C- 2 6" x 16"


use 8- 5/8 " dia main bars
provide 3/8 " dia lateral ties spaced at 4-3",4-4",rest at 8" o.c.

8-5/8" dia vert main bars


16"

6"

8. DESIGN OF COLUMN C-1 typical

wt from beam B-4 = 620.84 x 10.66 = 6,618.15#


wt from col C-2 = 12/12 x 12/12 x 12 x 150 = 1800 #
total wt = 8,418# x 2 = 16,836#
c = .85 Ag ( .225Fc' + PgFs) =16,836
16,836 = .85 x 8 x 16 ( .225 x 2500 + 18000Pg)
Pg = -.0236 < + 1% = .01
As = PgAg = .01 x 8 x 16 = 1.44 sq mts
Nas = 1.44/.306 = 4.7 < 8-5/8" dia
check for buckling
M = 16,836 x 12/2 = 101,016 in-lbs

d = [ M/RB]˙⁵ = * 101,016/ (138.6X16)+˙⁵ = 6.75"+ 1.50 = 8.25" =~8" OK

As = 101,016/ 18000x .866 x 6.5 = 1.10 sqin < 1.44 sq in ok

Finally adopt C-1 8" x 16"


use 8- 5/8 " dia main bars
provide 3/8 " dia lateral ties spaced at 4-3",4-4",rest at 8" o.c.

8-5/8"
16"

8"
9. DESIGN OF COLUMN C-2 at f00ting to second floor

wt from beam B-4 = 620.84 x 10.66 = 6,618.15#


wt from col C-2 = 12/12 x 12/12 x 12 x 150 = 1800 #
total wt = 8,418# x 4 = 33,656#
c = .85 Ag ( .225Fc' + PgFs) =33,656
33,656 = .85 x 16 x 16 ( .225 x 2500 + 18000Pg)
Pg = -.023 < + 1% = .01
As = PgAg = .01 x 16 x 126 = 2.56sq mts
Nas = 2.56/.306 = 5.8 < 8-3/4" dia main vert bars
check for buckling
M = 33,656 x 16/2 = 269,248 in-lbs

d = [ M/RB]˙⁵ = * 269,248/ (138.6X16)+˙⁵ = 11"+ 1.50 = 12.50"< 16" OK

As = 269,248/ 18000x .866 x 14.5 = 1.19 sqin < 2.56 sq in ok

Finally adopt C-2 footing to second floor 16" x 16"


use 8- 3/4 " dia main bars
provide 3/8 " dia lateral ties spaced at 4-3",4-4",rest at 8" o.c.

8-3/4"
16"
16"
8"

13. DESIGN OF SQUARE FOOTING F-1


wt of footing = 4ft x 4ft x 150 = 2,400 lbs
wt from column C-2 = 33,656 lbs
wt from tie beam = 12/12 x 12/12 x 12ft x150 = 1800 lbs
TOTAL WT = 37,856 LBS
s =P/A = 2,500 A= ( L X W)
L² = 37,856/ 2,500 = 15.14 sq ft L = 3.88 ft say 4 ft

UPWARD UNIT PRESSURE = 2,500 X 4 = 10,000 PSF


M1 = 1/2 ( 10,000 )(1.75)²12 = 183,750 IN -LBS
d = [ M/RB]˙⁵ = * 183,750/ (138.6X48)+˙⁵ = 5.4"+ 1.50 = 6.90"< 16" ok

As = 183,750 /18.000 x .866 x 16 = .73 sq in


Nas = .73 /.306 = 2 say 6 - 5/8" dia base bar both ways
spacing = 48/ 6 = 8"on center bothways

8- 5/8" dia main vert bars w/ 3/8"dia lateral ties spaced at


4-2", 4-4" , 8" rest on center
finish flr line

natl grnd line

8"

48"
16"
16"
2"
4ft

16"

6=5/8" dia base bar bothwaysa

16" 4ft
4ft