PROCESS DATA SHEET

Project N° - Unit Doc. type Code Serial N° Rev. index

9952T-600 PDS 0800 0009 A


CLASS 1
CLIENT SONATRACH Page

LOCATION ALGIERS REFINERY AMINE CB DRUM


ALGERIA 600-D-014 A
UNIT 600
MEROX
Rev. A B C D E 0 1 2 3 4 Rev. A B C D E 0 1 2 3 4
Page Page

A X

1 X

2 X

E 4

D 3

C Guillaume 2
Descamps
2011.03.03 Sofiane Tamouza
B 2011.03.03 18:21:02 1
10:05:16 +01'00' +01'00'

A 03-MAR-11 G.DESCAMPS S.TAMOUZA 0


Date
Rev. Written by Checked by Rev. Date Written by Checked by
DD-MM-YYYY
Document revisions
W:\Data-Snk003\Raffinage-Offsites\9952T-PEC-ALGIERS\3 - Package #3 - UOP Licensed Units\0600. MEROX\6. PDS\EQUIPMENTS\DRUMS\600-D-014 - AMINE CB DRUM\Rev A\[9952T-600-PDS-0800-0009-A' .x
PROCESS DATA SHEET
Project N° - Unit Doc. type Equipment N° Serial N° Rev. index

9952T-600 PDS 0800 0009 A


CLIENT SONATRACH Rev. Date Made by Checked by Page
A 03-MAR-11 GD ST
Revision

LOCATION ALGIERS REFINERY


DRUM 1
ALGERIA
UNIT 600
MEROX
1 ITEM 600-D-014
2 SERVICE AMINE CB DRUM

3 OPERATING PROCESS DESIGN


4 Pressure kg/cm2 g kg/cm2 g

(5)
5 0.5 3.5
6 (6)

7 Temperature °C °C ID= 1200

8 38 120 (3)
9 (6) TL

LLL
HLL
10

E
Min.(1)
11 SHELL/ENDS INTERNALS

N
200 200
12 Materials KCS (4)(12)

H1
13 Corrosion allow. 6mm
Pump center line
T1
14

(7)
15 Fluid : Lean/Rich Amine (DEA+H2O+H2S+HC trace) (9)
16 Density at T : 1027 kg/m³
(7)
17 Insulation NO
18 Lining NO
19 Lower TL elevation above ground = (2) min.
LI2

3000
20
LI1

21 NOTES:
22 Refer to page 2
23

24
1%

1%
H2

25 NOZZLE DATA
26 REF. Nb Ø SERVICE
Min.(1)

27 A1 1 4 Inlet
TI

28
W

29 T1 1 (8) Pump TL

30

31
A1

32

33 W 1 4 Flare
34 E 1 4 Vent
35

36

38 H1 1 (8) Pump flange


37 H2 2 20 Man hole
39

40 N 1 2 Steam-out/Draw off (11)


41

42 LI1-LI2 2 (1) Level transmitter (10)


43

44 TI 1 (1) Temp. Transmitter


45

46

47

48
affinage-Offsites\9952T-PEC-ALGIERS\3 - Package #3 - UOP Licensed Units\0600. MEROX\6. PDS\EQUIPMENTS\DRUMS\600-D-014 - AMINE CB DRUM\Rev A\[9952T-600-PDS-0800-
PROCESS DATA SHEET
Project N° - Unit Doc. type Equipment N° Serial N° Rev. index

9952T-600 PDS 0800 0009 A


CLIENT SONATRACH Rev. Date Made by Checked by Page
A 03-MAR-11 GD ST
Revision

LOCATION ALGIERS REFINERY


DRUM 2
ALGERIA
UNIT 600
MEROX
2 Notes :
3

4 (1) By Discipline Engineer


5 (2) Underground vessel inside concrete pit
6 (3) Minimum design metal temperature is +1°C
7 (4) Wet H2S Service (max H2S: 0.41 mol% total), PWHT required
8 (5) Quick coupling connection for pump out by mobile pump
9 (6) Subject to steam out conditions : 0.5 kg/cm² (g) @ 230°C
10 (7) Boot dimensions to be finalized by specialist after pump selection
11 (8) To be sized according to the pump type
12 (9) 0.33mol Acid gas/ mol rich amine Maximum
13 (10) 600-P-014 A/B stop at LLL and starts at HLL
14 (11) Connection for steam out and emptying by mobile device
15 (12) To be confirmed by corrosion department
16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

46

47

48
ata-Snk003\Raffinage-Offsites\9952T-PEC-ALGIERS\3 - Package #3 - UOP Licensed Units\0600. MEROX\6. PDS\EQUIPMENTS\DRUMS\600-D-014 - AMINE CB DRUM\Rev A\[9952T-600-PDS-0800-

You might also like