Professional Documents
Culture Documents
GeM Bidding 1869182
GeM Bidding 1869182
Dated: 10-09-2020
Bid Document
Bid Details
Total Quantity 1
Bid to RA enabled No
Inspection Required No
EMD Detail
Required No
ePBG Detail
Required No
Splitting
1. Experience Criteria: In respect of the filter applied for experience criteria, the Bidder or its OEM {themselves or
through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central
/ State Govt Organization / PSU / Public Listed Company for number of Financial years as indicated above in the bid
document before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having
supplied some quantity during each of the Financial year. In case of bunch bids, the category of primary product having
highest value should meet this criterion.
1/5
Multifunction Machines MFM ( 1 pieces )
Technical Specifications
Minimum Speed per 40 40, 43, 45, 46, 47, 50, 52,
Minute as per ISO/IEC 55, 60, 61, 65, 70, 71, 75,
24734 in A4 Size- 80, 90, 95, 100, 105, 110,
Mono 51, 56, 41, 120, 130, 160,
57, 85, 81, 53 Or higher
Minimum Speed per 0 12, 15, 16, 18, 20, 22, 23,
Minute as per ISO/IEC 24, 25, 26, 27, 28, 30, 31,
24734 in A4 Size- 35, 36, 4, 4.4, 5, 5.7, 5.8,
Colour 6.8, 10, 10.4, 15.5, 40, 50,
60, 5.5, 11, 46, 120, 130,
160, 65, 45, 7, 34, 55, 38,
56, 75, 81, 19, 71, 0, 21, 53
Or higher
2/5
Networking Feature Yes Yes Or higher
Availability
Feeder Capacity 50 *
(Number)
3/5
(Number of Prints)
Minimum Operating 10 *
Temperature (Degree C)
Minimum Operating 10 *
Humidity (%RH)
Maximum Operating 80 *
Humidity (%RH)
Dimension (mm x mm x - *
mm)
Weight (Kg) - *
In terms of GeM GTC clause 26 regarding Restrictions on procurement from a bidder of a country which shares a land border with India, any bidder
from a country which shares a land border with India will be eligible to bid in this tender only if the bidder is registered with the Competent Authority.
4/5
While participating in bid, Bidder has to undertake compliance of this and any false declaration and non-compliance of this would be a ground for
immediate termination of the contract and further legal action in accordance with the laws.
---Thank You---
5/5