MINISTRY OF ENERGY AND MINERAL RESOURCES

DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

GOVERNMENT REGULATION
IN THE DEVELOPMENT OF NRE IN INDONESIA

F.X. Sutijastoto
Director General of New, Renewable Energy and Energy Conservation
at Pertamina Energy Forum
Jakarta, 26 November 2019
NRE Strategy in the National Energy Mix 2025
Projections for Optimizing the Use of CPO and Biofuel

100%
13%*) 13%*) 13%*) 15%
90% 23% 2-5% Electricity
3% Non-
80% 2%
Electricity
Import (75%) 2% 3%
70% 38% 35% 33-34%
Domestic 28-32%
60% 2%
Production 1-3% Pellet
(25%) Biomass
50%

40%

30%

20%

10%

0%
BPPT Outlook B-30 = NRE B30 + Green Biofuel 2025
B30 + Green Biofuel+
PLT Bioenergi
Gas Coal Oil Biodiesel Greenfuel Bioenergy Power Plant NRE

*) Note: IISD estimates of the role of NRE in the energy mix in 2025 by 15%

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 2


The Bigest Trade Balance Deficit within the Last 5 Years
Indonesia had the biggest trade balance deficit within the last five years in the Q1 2019 reaching for USD2.502 million. The main factor
causing the deficit was the amount of imported oil and gas reaching for USD2.770 in the Q1 as well as the low of CPO price for 475
USD/Ton in April 2019.
Trade Balance and CPO Export Progress per Quarter Oil and Gas, Non Oil and Gas Trade Balance and CPO Price Movement
Period: Q3 2016 – Q1 2019 Period: Q3 2016 – Q1 2019
Million Dollar Thousand Ton MIllion Dollar USD/ton

2,500 9,000 25,000 750


20,414
2,000 1,670 1,792 1,674 8,000 713
1,435 20,000 700
1,500 1,282 656 15,167
1,050 1,047 7,000 13,710
1,000 15,000
671 650
346 6,000 11,242
500 10,000
600
- 5,000 588 3,998
5,000
(500) (240) 4,000 205 550
-
(1,000) 511
3,000 (2,770) 500
(1,500) (1,075) (5,000)
2,000 (6,039) (5,634)
(2,000) 470 450
(10,000)
(8,572) 475
(2,500) 1,000
(15,000) (12,697) 400
(3,000) (2,502) - (13,441)
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 (20,000) 350
2016 2016 2016 2017 2017 2017 2017 2018 2018 2018 2018 2019 2014 2015 2016 2017 2018 Jan-Apr* 2019
Trade Balance Volume Export CPO
(Ton) Migas Non Migas Harga CPO

Deficit Trade Balance

Even though the volume of exported CPO increased in Q1 due to the low CPO price, the number of exported CPO could not reduce the trade balance deficit in
Q1 2019

Sumber : Kementerian Perdagangan, GAPKI, dan Bloomberg

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 3


High Dependency on Oil Fuels (BBM)
Domestic BBM Consumption Trend (Gasoline and HSD) Imported Gasoline vs Domestic Consumption Trend

Imported Diesel Oil vs Domestic Consumption Trend


• The need for domestic Oil Fuels is increasing and dominated by
gasoline and diesel oil
• Imported diesel oil is lower than imported gasoline
• The high consumption of gasoline is increasing and the half of domestic
gasoline needs are from import
• Bioethanol utilization mandatory is not yet implemented due to limited
bioethanol supply
• Gasoline substitution effort is relatively limited, so a policy is needed to
shift the consumption of gasoline to diesel oil

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 4


Strategy of BBM Substitution on Transportation Sector
BBM Types Composition on Transportation Sector
BBM Utilization Composition on User Sector

• The biggest BBM utilization is on transportation sector Development Strategy of CPO-based Biofuel Product
• The diesel oil utilization on transporation sector is lower that the gasoline The development of CPO-based biofuel utilization in Indonesia could be implemented through 4 products such as Biodiesel (use the
mixture of FAME), CPO-based biofuel utilization for power plants, Green Diesel and Green Gasoline development
• Biodiesel mandatory program in 2018 was quite successfull reaching for 3.5
million KL and predicted to reach 6.7 million KL in 2019, so imported diesel
oil succeeded to be reduced
• The development of CPO-based biofuel products needs to be increased to
cut down the imported BBM as well as to push down the CPO price
• The development of CPO-based utilization through 4 products: Biodiesel
(use the mixture of FAME), CPO-based biofuel utilization for power plants,
Green Diesel and Green Gasoline development

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 5


Strategy of Reducing the Imported Gasoil and Strengtening the CPO Price
(Million KL)
DESCRIPTION 2019 2020 2021 2022 2023 2024 2025
Demand of gasoil (A) 30,9 31,9 32,8 33,8 34,7 35,7 36,8
Capacity of gasoil production from 20,4 20,4 20,4 20,4 20,4 20,4 20,4
domestic refinery (B)
The needs of imported gasoil (A-B) 10,5 11,5 12,4 13,4 14,3 15,3 16,4
STRATEGY OF IMPORT REDUCTION
Biodiesel Substitution
FAME (B30) 6,7*) 9,6 9,8 10,1 10,4 10,7 11,0
Co-processing green-diesel 0,1 0,1 0,1 0,1
Standalone green-diesel 3,6 3,6 6,0 6,0
Total Supply of Biodiesel 6,7 9,6 9,8 13,8 14,1 16,8 17,1
CPO Substitution for Power Plants 0,2 1,0 1,0 1,0 1,3 1,5
Biomassa Substitution for Power Plants 0,1 0,1 0,3 0,3 0,3 0,3
Estimated Import 3,8 1,6 1,5 0 0 0 0
Description:
1) Domestic refinery production has calculated the plan of RDMP and GRR;
2) Co-processing green-diesel is based on the plan of Pertamina at DHDT Dumai, TDHT Cilacap, and HTU Balongan unit;
3) Standalone green-diesel phase 1 Pertamina in Plaju refinery in capacity 0,8 million KL in 2024, the remaining is the standalone plan of
private sector.
www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 6
(Million KL)
Strategy of Reducing the Imported Gasoline
DESCRIPTION 2019 2020 2021 2022 2023 2024 2025
Demand gasoline (A) 34,5 34,9 35,1 36,3 37,5 38,8 40,2
Capacity of gasoline production from domestic 14,1 14.1 14.1 14.1 14.1 14.1 14.1
refinery (B)
The needs of imported gasoline (A-B) ex 20,8 21,0 22,2 23,4 24,7 26,1
STRATEGY OF IMPORT REDUCTION
Bioetanol Substitution
Bioetanol 0,1 0,14 0,25 0,35 0,45 0,45
Co-processing green-gasoline Pertamina 0,1 0,1 0,1 0,1
Total Supply of Bioetanol 0,1 0,14 0,35 0,45 0,55 0,55
Electric Vehicle (Car and Motor) 0,003 0,3 0,5 0,7 0,9 1,0 1,2
Estimated Import 20,397 20,4 20,36 21,15 22,05 23,15 24,35

Description:
Co-processing green-diesel is based on the plan of Pertamina at FCC Plaju, RFCC Cilacap, RFCC Balongan, and RFCC
Balikpapan unit

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 7


The Current NRE Potentials
• Abundance NRE Potentials:
94.3 GW 207.8 GW 32.6 GW (including POME, EFB,
Fiber, and Palm Kernel
has been utilized for has been utilized for Shell : 8.7 GW)
has been utilized for 0.08 GW 1.86 GW
5.79 GW

PLTS PLT Bio


PLTA/M/H
25.4 GW 60.6 GW 11.6 Million KL (installed
has been utilized for capacity of
has been utilized for
1.99 GW 0.15 GW FAME refinery
equivalent to 75.2
MBOE in 2019)
PLTP PLTB Biodiesel

• The NRE in the national energy mix was 8.5% (primary Gas, 21.12

energy) in the end of 2018 and NRE power plant capacity was BBM
9.9 GW or 12.7% of the total capacity in Q II 2019. (+BBN),
4.32
Semester I
• Since the issuance of MEMR Regulation 50/2017, there has 2019
not been any NRE addition capacity from new contract Coal,
61.85 NRE,
12.71
NRE Development Prospects –
RUPTL and Energy Market Creation Strategy
MW

30,000
Energy Market 3,494.3
Market Creation
25,000
24,074
20,000 1,809.1
1,392.5
845.6 17,421
15,000 RUPTL
511.9 15,184
254.2 14,064
11.6 12,887
10,000 11,256
10,335

5,000
US$ 36,95 Billion

0 NRE Power Plant Investment


Projection:
2019 2020 2021 2022 2023 2024 2025 1. PLTP 17.45 B USD
PLTA/PLTM/MH PLTP PLTS PLT Bio PLT Bayu EBT lain Pasar Energi TOTAL 2. PLTA/M 14.58 B USD
3. PLTS & PLTB 1.69 B USD
Note: 4. PLT Hybrid 0.26 B USD
The RUPTL uses the assumption of 5.5% economic growth per year until 2020 and 6.5% for 2025 5. PLTSa 1.6 B USD
6. PLT Bioenergy 1.37 B USD

9
Investment Projection of NRE-based Power Plant (Million USD)
No. Types of NRE Power Plant 2019 2020 2021 2022 2023 2024 2025 TOTAL
1. PLTP (Geothermal Energy) 739,2 560 320 528 1.200,0 1.460,0 12.640,0 17.447,2
2. PLTA (Hydro) 588,0 1.128,0 2.468,0 399,6 699,2 3.432,0 6.147,0 14.861,8
3. PLT Bio 33,4 340,4 129,2 1.665,6 107,1 220,6 79,1 2.575,4
4. PLTS (Solar) 63 78,5 219,3 129 160,3 3,7 250 903,8
5. PLT Bayu (Wind) 0 0 30 360 260 50 150 850,0
6. Other NRE (Sea Current) 0 0 56 0 0 0 0 56,0
1.423,6 2.106,9 3.222,5 3.082,2 2.426,6 5.166,3 19.266,1 36.694,2
1. PLTP (Geothermal Energy) 40 484 524,0
2. PLTA (Hydro) 0,00 0,00 0,00 74,6 302,6 29,8 1.826,4 2.233,4
3. PLT Bio/ CPO 0,00 232,2 197,4 275 234,8 322,5 430,0 1.691,8
4. PLTS (Solar) 11,5 134,6 165,9 168,5 177,4 181,8 201 1.040,7
5. PLT Bayu (Wind) 0 0 0 0 109 60 250 419,0
6. Other NRE 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
11,5 366,8 363,3 518,1 823,8 594,1 2.707,4 5.384,9
TOTAL Investment (Million USD) 1.435 2.474 3.586 3.600 3.250 5.800 22.458 42.603

10
FUNDAMENTAL OF NATIONAL NRE POLICY

11
THANK YOU
MINISTRY OF ENERGY AND MINERAL RESOURCES
Jl. Medan Merdeka Selatan No. 18, Jakarta

DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION


Jl. Pegangsaan Timur No.1 Menteng, Jakarta

www.ebtke.esdm.go.id @djebtke @djebtke @djebtke 12


PROGRESS OF PLTP PROJECTS IN WEST INDONESIA
SUMUT: 9 Projects PLTP in 3 Areas ACEH: 5 Projects PLTP in 3 Areas
JABAR: 13 Projects PLTP in 6 Areas
• Sibual-Buali (Sarulla) 150 MW, Exploitation, • Jaboi 10 MW, Exploitation, 2022
• Cibeureum-Parabakti 70 MW, Exploitation, 2023, 2025
2024, 2025 • Seulawah Agam 55 MW, Exploration, 2025 BANTEN: 2 Projects • Cibuni 30 MW, Exploitation, 2025
• Sorik Marapi 240 MW, Exploitation, 2019, • Gn. Geureudong 115 MW Exploration, 2025 PLTP in 1 Areas • Gn. Tgkuban Perahu 60 MW, Exploration, 2024, 2025
2020, 2021, 2022, 2023 Kaldera Danau Banten • Kamojang 20 MW, Exploitation, 2025
• Simbolon Samosir 110 MW, Exploration, 2025 110 MW, Exploration, • Pangalengan (Patuha) 110 MW, Exploitation, 2023, 2025
2025 • Pangalengan (Wayang Windu) 60 MW, Exploitation, 2024
• Gn. Gede Pangrango 55 MW, 2025
SUMBAR: 6 Projects PLTP in 4 Areas
• Liki Pinangawan Muaralaboh 275 MW,
Exploitation, 2019, 2025
• Gn Talang-Bukit Kili 20 MW, Exploration,
2025
• Bonjol 40 MW, Exploration, 2025
• Tandikat Singgalang 20 MW, Exploration,
2025 JATIM: 6 Projects in 3 Areas
• Blawan-Ijen 55 MW,
Exploration, 2024 SUMMARY
BENGKULU: 6 Projects PLTP in 2 Areas • Arjuno Welirang 120 MW,
• Hululais 175 MW, Exploitation, 2023, 2025 Exploration, 2025
• Kepahiang 110 MW, Exploration, 2025 • Gn. Wilis 110 MW, Installed Capacity:
Exploration, 2025
JAMBI: 4 Proyek PLTP in 2 Areas ▪ Current: 2.045,6 MW
• Sungai Penuh 60 MW, Exploitation, 2025
• Graho Nyabu 110 MW, Exploration, 2025 ▪ Target 2025: 6.310 MW

SUMSEL: 8 Projects PLTP in 2 Areas LAMPUNG: 7 Projects PLTP in 4 Areas JATENG: 13 Projects in 5 Areas
• Rantau Lumut Balai 115 MW, Exploitation, • Gn. Rajabasa 220 MW, Exploration, 2025 • Dataran Tinggi Dieng 245 MW, Exploitation, 2021, 2023, 2025
PLTP Project up to 2025:
2019, 2020, 2022 • Sekincau 220 MW, Exploration, 2025
• Way Panas (Ulubelu) 10 MW, Exploitation,
• Baturaden 220 MW, Exploration, 2023, 2024, 2025 113 Projects → 4.362 MW
• Rantau Dedap 220 MW, Exploitation, • Gn. Ungaran 55 MW, Exploration, 2025
2020, 2025 2023 • Candi Umbul Telomoyo 45 MW, Exploration, 2025 production equivalent to Investment (estimation)
• Way Ratai 55 MW, Exploration, 2025 • Gunung Lawu 55 MW, Exploration, 2025
205 Thousand SBM US$ 17.45 Billion
13
PROGRESS OF PLTP PROJECTS IN CENTRAL AND EAST INDONESIA
SULTENG: 1 Projects PLTP in 1 Area
Bora Pulu 40 MW, Offering Process, COD 2025

SULUT: 8 Projects PLTP in 3 Areas


• Kotamobagu 20 MW, Assignment Process, COD 2025
• Lahendong-Tompaso 55 MW, Exploitation, COD 2023, 2024,
2025
• Klabat Wineru 40 MW, Exploration, COD 2025

MALUT: 5 Projects PLTP in 2 Areas


• Songa Wayaua 10 MW, Exploration, COD 2023
• Gn.Hamiding 100 MW, Exploration, COD 2025

SUMMARY
MALUKU: 2 Projects PLTP in 1 Area
Installed Capacity: Tulehu 7 MW, Exploration, COD 2022
▪ Current: 2.045,6 MW
▪ Target 2025: 6.310 MW

NTT: 14 Projects PLTP in 6 Areas


PLTP Project up to 2025: BALI: 2 Projects in 1 Area NTB: 2 Projects in 2 Areas
• Ulumbu 40 MW, Exploitation, COD 2024, 2025
• Mataloko 20 MW, Exploitation, COD 2024, 2025
113 Projects → 4.362 MW Tabanan 65 MW, Exploitation, • Hu’u Daha 10 MW, Exploration, COD 2025 • Atadei 5 MW, Exploration, COD 2025
COD 2025 • Sembalun 10 MW, Offering Process, COD 2025 • Sokoria 30 MW, Exploitation, COD 2019, 2021,
production equivalent to Investment (estimation)
2022
205 Thousand SBM US$ 17.45 Billion • Gn. Sirung 5 MW, Exploration, COD 2025
• Waesano 20 MW, Government Drilling, COD 2025
14
PROGRESS OF PLTA/M PROJECTS IN WEST INDONESIA up to 2025
SUMMARY
ACEH SUMUT SUMSEL
- 3 PLTA/M (149,99 MW)-construction - 5 PLTA (723MW), construction,COD 2019 - 4 PLTM (22MW), construction,
COD 2019, 2020, 2021 (1), 2021 (1), 2023 (1), 2024 (1) COD 2019(1), 2020(2),2021(1) 218 Projects
- 1 PLTM (45 MW)-COD plan - 20 PLTM(168,1MW), construction, - 2 PLTM (8,9MW), FC process,
2024 COD 2019(6), 2020(5), 2021(9) COD 2020(1),2021(1) Installed Capacity Estimation
- 14 PLTM(105,3MW), FC process, COD 2021

7.288,26 MW
SUMBAR
Investment Estimation
- 8 PLTM (39,5MW), construction,
COD 2019(4),2020(3),2021(1)
- 7 PLTM (24,9MW), financing, 2021 US$ 14,58 Billion

JAMBI
1 PLTA (350 MW)
COD 2025, construction

BENGKULU
4 PLTA/M (38,7 MW)
construction,
COD 2019 (1), 2020 (1)
2021 (2)

LAMPUNG
- 1 PLTM (7,0MW)-
construction, COD 2020 Explanation:
- 1 PLTM (7,7MW)- - 0-10 MW, 139 projects 620 MW
financing, COD 2021 JABAR JATENG JATIM
- 1 PLTM (1,2 MW) - 10-50 MW, 56 projects 1089 MW
- 17 PLTM (172,7) MW- - 2 PLTM (12,4 MW)-construction
BANTEN construction COD 2019 (2) construction, COD 2020 - 50-100 MW, 11 projects 883 MW
- 4 PLTM (16,7MW)- COD 2019 (1),2020 (9), 2021(7) - 6 PLTM (162 MW)- COD plan - 6 PLTA/M(190,5 MW), - >100, 9 projects 2780 MW
construction, COD - 6 PLTM (1.048 MW)- 2019(1), 2020 (1), 2021 (2), COD plan 2020(2), - Excluding pump storage
2020(2),2022 (2) financing, COD 2024 2022(1), 2023(1) 2021(1), 2022(1), 2025(2)
- 3 PLTM (18 MW)-COD - 6 PLTM (141,90 MW)-COD plan - 4 PS (943 MW) – COD plan 2025
plan 2022 (1), 2023 (1), 2021(1), 2022(1), 2023 (1), 2024
2024 (1)
15
PROGRESS OF PLTA/M PROJECTS IN CENTRAL & EAST INDONESIA up to 2025
KALBAR KALTARA KALTIM GORONTALO SULUT
7 PLTM (47,07 MW), planning, 1 PLTM (90 MW), 2 PLTM (145 MW), 2 PLTM (11,9 MW)- - 1 PLTM (3,5 MW)-financing, 2020
2021(1), 2023(2), 2024(2), 2025(3) planning, 2025 planning, 2025 construction, 2020, 2021 - 4 PLTM (60,3 MW), planning,
COD 2021(1),2023(2), 2024(1)
SULTENG
- 5 PLTM (282,2 MW), construction,
COD 2020(3), 2021(1), 2023(1)
- 2 PLTM (9,6 MW), financing
COD 2020, 2021
- 7 PLTM (108,4 MW), planning
COD 2021(1),2022(1),2023(4),2024(1)
Explanation:
- 0-10 MW, 139 projects 620 MW SULTRA
- 10-50 MW, 56 projects 1089 MW - 1 PLTM (10 MW), procurement, 2024
- 50-100 MW, 11 projects 883 MW - 5 PLTM (45,8 MW) planning
- >100, 9 projects 2780 MW 2020(1),2023(3), 2024(1)
- Excluding pump storage

SUMMARY SULBAR
MALUKU PABAR
2 PLTM (20 MW), procurement,
8 PLTM (30,6 MW), 1 PLTM (1,3 MW)
COD 2022, 2023
218 Projects planning, 2022 (1), 2024(3), planning, COD 2024
2025(4)
Installed Capacity Estimation

7.288,26 MW PAPUA
- 1 PLTM (3 MW)
Investment Estimation SULSEL financing, COD 2024
NTB NTT
- 4 PLTA/M (108 MW), construction, COD 2020(2), 2021(2) - 2 PLTM (1,9 MW) 5 PLTM (15,35 MW) - 11 PLTM (31 MW)
US$ 14,58 Miliar - 2 PLTA/M (208,3 MW), FC process, COD 2020, 2025 construction, 2019 planning, 2021(1), planning,
- 3 PLTM (860MW), procurement, COD 2024 (1), 2025(2) - 5 PLTM (22 MW) 2022(2), 2025(2) COD 2023(2), 2024(9)
- 2 PLTA/M (433,1 MW), planning, COD 2025 planning, 2020(2), 2021(1), 2022(1)

16
Explanation:
- 0-25 MW, 41 projects 228 MW
PROGRESS OF PLTS & PLTB PROJECTS up to 2025 - > 25 MW, 19 projects 1503 MW
KEPRI BABEL KALTENG KALTARA KALTIM GORONTALO SULTENG
1 PLTS (1,8 MW) 1 PLTS (0,3 MW) 1 PLTS (0,5 MW), 1 PLTS (3 MW), planning, 1 PLTS (0,7 MW), planning, 1 PLTS (10 MW)- 1 PLTS (3,72 MW),
planning COD 2021, planning, COD (2024) COD (2024) COD (2024) construction, COD 2019 planning, COD 2019
COD 2021, planning
MALUKU UTARA
2 PLTS (1,175 MW), procurement,
COD 2021 (1), 2023 (1)

MALUKU
SUMATERA
2 PLTS (4,10 MW), procurement,
2 PLTS (51,7) MW-planning
COD 2020 (1), 2021 (1)
COD 2021 (1), 2022 (1)

PABAR
1 PLTS Lisdes (2,92 MW)
BANTEN procurement, COD 2019
3 PLTS/B spreading (320 MW)
planning PAPUA
COD 2022 (1), 2023 (1), 2025 (1) 1 PLTS Lisdes (2,55 MW)
KALSEL
1 PLTB (30 MW), planning, procurement,COD 2019
JABAR COD (2024) SULSEL
- 3 PLTS spreading (200) MW-
1 PLTB (60 MW), planning,
COD plan 2020 (1), 2021(1),
COD (2023)
SUMMARY
2022 (1)
- 2 PLTS/B spreading (300) MW-
COD plan 2023 (1), 2025 (1) 60 Projects

JATENG BALI Installed Capacity Estimation


2 PLTS/B spreading (160MW) - 1 PLTS (50 MW) NTB NTT
planning, COD 2022 (1), 2025 procurement, 2 PLTS (10 MW) - 3 PLTS (14,2 MW) 1.731,39 MW
(1) COD 2020 construction, 2019 construction, COD2019(1)
JATIM - 1 PLTS/PLTB (50 MW) planning, 2021 planning, COD 2022(2)
- 3 PLTS/B spreading (200 MW) planning, planning, COD 2025 - 1 PLTS/B/AL (7 MW) Investment Estimation
COD 2022 (1), 2024 (1), 2025 (1) - 1 PLTH (10 MW), planning, COD 2021
- 5 PLTH (11 MW) COD plan 2020 (1), 2021 planning,COD 2020 - 1 PLTS/H (9 MW) US$ 1,69 Miliar
(4) construction, COD 2019 17
HYBRID PLTS/PLTB – PLT BIOMASS DEVELOPMENT PLAN
THROUGH MARKET CREATION
Explaination

Project Sites under


Development

PLTH MALUKU
TENGAH (SERAM)
7 MW

PLTS (Baterai)
BURU 8MW
PLTB
PLTH
AMBON
Karimun Jawa PLTS (Baterai)
20MW
5 MW KEI KECIL
PLTS BUTON 8 MW
PLTS (Baterai)
30MW
SELAYAR
8 MW

PLTH PLTH TANIMBAR


Nusa Penida 5MW
10 MW
PLTH
SUMBA TIMUR Estimated Investment
5 MW

US$ 0,26 Billion

18
PROGRESS OF PLTSA PROJECTS IN 12 CITIES IN 2019 (PSN) SUMMARY

(Status November 2019) 13 Projects


12
Cities

PLTSa Manado
Waste: 1.000 ton/day
Prod. (est): 10-20 MW Processed Waste
COD : 2023
PLTSa Sunter Status: Pra FS ±16.000 ton/day
Waste: 2.200 ton/day
Prod. : 35 MW
PLTSa Palembang COD: 2023 Installed Capacity Estimation
Waste: 1.200 ton/day Status: Financial Close
Prod. (est): 10-20 MW
COD: 2023
160 – 240 MW
Status: FS PLTSa Semarang
Waste: 1.000 ton/hari Estimated Investment
Prod. (est): 10-20 MW PLTSa Makassar
COD: 2023 Waste: 1.400 ton
PLTSa Tangerang
Status: OBC Finalization Prod. (est): 10-20 MW US$ 1.66 Billion
Waste: 2.000 ton/day COD: 2023
Prod. (est): 10-20 MW Status: OBC revision
COD: 2023
Status: Tender

PLTSa Tangerang Selatan


Waste: 1.000 ton/day
Prod. (est): 10-20 MW PLTSa Bekasi-1
COD: 2023 Waste: 200 ton/day PLTSa Denpasar
PLTSa Bandung PLTSa Bekasi-2 PLTSa Surakarta PLTSa Surabaya
Status: approval PDF Prod.: 1.5 MW Waste: 1.200 ton
Waste: 1.820 ton/day Waste: 450 ton Waste: 1.400-1.500 ton
COD: 2020 Waste: 2.000 ton Prod. : 10-20 MW
Prod. (est): 21-29 MW Prod.: 10 MW Prod.: 11 MW
Status: Agreement Prod. (est): 10-20 MW COD: 2023
COD: 2023 COD: 2023 COD: 2021 COD: 2020
Amendment Status: FS
Status: Bid preparation Status: Pra FS Status: EPC Status: EPC
and FS/SI evaluation

19
PROGRESS OF PLT BIOENERGY PROJECTS BASED ON
RUPTL 2019 - 2025 TOTAL : 794.1 MW
(Status November 2019) • Construction= 64.4 MW (8%)
Estimated INVESTMENT: US$ 2.6 Billion • PJBL = 85.7 MW (11%)
1

21 • Planning= 644 MW (81%)


2

3 20 27
4 25
18
5
6 23
9
19 26
8 24
7 22 28

10
12
11
13
14
15 16
17
CPO Implementation Plan on PLN's PLTD (Diesel Power Plant) Amount: 2022 : 127,87 MW

Bangka Belitung East Kalimantan


2020 2023
2020 : 107,95 MW 2023 : 109,19 MW
2020 2023 2024
1. PLTD Merawang PLTD 1. PLTD 1. PLTD Tanah Grogot
PLTD
2. PLTD Mentok Bitung Gunungmalang 2. PLTD Petung
Merawang
3. PLTD Toboali 2. PLTD Ba takan 2021 : 91,83 MW 2024 : 86,06 MW
4. PLTD Pilang 3. PLTD Ka ra ng Asam 2024
5. PLTD Padang 4. PLTD Kel edang 1. PLTD Raha
Belitung Timur 2. PLTD Wangi-Wangi Papua and West Papua
West Kalimantan 3. PLTD Tello
4. PLTD Selayar 2021
2023 1. PLTD Waena 8. PLTD Kebun Kapas
1. PLTD Semboja 2. PLTD Yarmokh 9. PLTD Sanggeng
2. PLTD Tanjung Puri 3. PLTD Timika 10. PLTD Nabire
3. PLTD Sambas 4. PLTD Genyem 11. PLTD Kalibobo
4. PLTD Sukaharja 5. PLTD Sarmi 12. PLTD Karangmulia
6. PLTD Klademak 13. PLTD Serui
7. PLTD Klasaman 14. PLTD Kelapa Lima

Aceh
2023
1. PLTD An Laot Sabang
2. PLTD Pulo Pisang Kalimantan Selatan South East Sulawesi
3. PLTD Cot Trueng
2023
SUMMARY
4. PLTD Dedalu
5. PLTD Ayangan 1. PLTD Pagatan 2021 332 Units
6. PLTD Kuning 2. PLTD Kotabaru PLTD Wua Wua
Estimated Installed Capacity
7. PLTD Blangkejeren
8. PLTD Seuneubok
9. PLTD Rimo 522,92 MW
10.
11.
PLTD Tapak Tuan
PLTD Suak
West Sumatra Estimated Investment
12. PLTD Ampang Gadang
2020 2024 Rp 5,38 Trillion
13. PLTD Balun
1. PLTD Ra nting 1. PLTD Lopana
Pa i nan 2. PLTD Lambuya
2. PLTD Ra nting S.
3. PLTD Kolaka Nusa Tenggara Barat Maluku and North Maluku
Penuh
4. PLTD Bau Bau
2022 Nusa Tenggara Timur
3. PLTD Ba l un 1. PLTD Ampenan 7. PLTD Alas 2021
2. PLTD Paokmotong 8. PLTD Taliwang 2022 1. PLTD Tobelo
4. PLTD Luna ng 1. PLTD Kuanino dan Tenau 5. PLTD Waikabubak 2. PLTD Langgur
3. PLTD Niu 9. PLTD Sebotok
4. PLTD Kuanino dan Tenau 10. PLTD Dompu 2. PLTD Baranusa 6. PLTD Mautapaga 3. PLTD Masohi
5. PLTD Taman 11. PLTD Sape 3. PLTD Atambua 7. PLTD Aesesa 4. PLTD Haruku 21
6. PLTD Labuhan 4. PLTD Waingapu 5. PLTD Saparua