NRE Strategy in the National Energy Mix 2025
Projections for Optimizing the Use of CPO and Biofuel
100%
13%*) 13%*) 13%*) 15%
90% 23% 2-5% Electricity
3% Non-
80% 2%
Electricity
Import (75%) 2% 3%
70% 38% 35% 33-34%
Domestic 28-32%
60% 2%
Production 1-3% Pellet
(25%) Biomass
50%
40%
30%
20%
10%
0%
BPPT Outlook B-30 = NRE B30 + Green Biofuel 2025
B30 + Green Biofuel+
PLT Bioenergi
Gas Coal Oil Biodiesel Greenfuel Bioenergy Power Plant NRE
*) Note: IISD estimates of the role of NRE in the energy mix in 2025 by 15%
Even though the volume of exported CPO increased in Q1 due to the low CPO price, the number of exported CPO could not reduce the trade balance deficit in
Q1 2019
• The biggest BBM utilization is on transportation sector Development Strategy of CPO-based Biofuel Product
• The diesel oil utilization on transporation sector is lower that the gasoline The development of CPO-based biofuel utilization in Indonesia could be implemented through 4 products such as Biodiesel (use the
mixture of FAME), CPO-based biofuel utilization for power plants, Green Diesel and Green Gasoline development
• Biodiesel mandatory program in 2018 was quite successfull reaching for 3.5
million KL and predicted to reach 6.7 million KL in 2019, so imported diesel
oil succeeded to be reduced
• The development of CPO-based biofuel products needs to be increased to
cut down the imported BBM as well as to push down the CPO price
• The development of CPO-based utilization through 4 products: Biodiesel
(use the mixture of FAME), CPO-based biofuel utilization for power plants,
Green Diesel and Green Gasoline development
Description:
Co-processing green-diesel is based on the plan of Pertamina at FCC Plaju, RFCC Cilacap, RFCC Balongan, and RFCC
Balikpapan unit
• The NRE in the national energy mix was 8.5% (primary Gas, 21.12
energy) in the end of 2018 and NRE power plant capacity was BBM
9.9 GW or 12.7% of the total capacity in Q II 2019. (+BBN),
4.32
Semester I
• Since the issuance of MEMR Regulation 50/2017, there has 2019
not been any NRE addition capacity from new contract Coal,
61.85 NRE,
12.71
NRE Development Prospects –
RUPTL and Energy Market Creation Strategy
MW
30,000
Energy Market 3,494.3
Market Creation
25,000
24,074
20,000 1,809.1
1,392.5
845.6 17,421
15,000 RUPTL
511.9 15,184
254.2 14,064
11.6 12,887
10,000 11,256
10,335
5,000
US$ 36,95 Billion
9
Investment Projection of NRE-based Power Plant (Million USD)
No. Types of NRE Power Plant 2019 2020 2021 2022 2023 2024 2025 TOTAL
1. PLTP (Geothermal Energy) 739,2 560 320 528 1.200,0 1.460,0 12.640,0 17.447,2
2. PLTA (Hydro) 588,0 1.128,0 2.468,0 399,6 699,2 3.432,0 6.147,0 14.861,8
3. PLT Bio 33,4 340,4 129,2 1.665,6 107,1 220,6 79,1 2.575,4
4. PLTS (Solar) 63 78,5 219,3 129 160,3 3,7 250 903,8
5. PLT Bayu (Wind) 0 0 30 360 260 50 150 850,0
6. Other NRE (Sea Current) 0 0 56 0 0 0 0 56,0
1.423,6 2.106,9 3.222,5 3.082,2 2.426,6 5.166,3 19.266,1 36.694,2
1. PLTP (Geothermal Energy) 40 484 524,0
2. PLTA (Hydro) 0,00 0,00 0,00 74,6 302,6 29,8 1.826,4 2.233,4
3. PLT Bio/ CPO 0,00 232,2 197,4 275 234,8 322,5 430,0 1.691,8
4. PLTS (Solar) 11,5 134,6 165,9 168,5 177,4 181,8 201 1.040,7
5. PLT Bayu (Wind) 0 0 0 0 109 60 250 419,0
6. Other NRE 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0
11,5 366,8 363,3 518,1 823,8 594,1 2.707,4 5.384,9
TOTAL Investment (Million USD) 1.435 2.474 3.586 3.600 3.250 5.800 22.458 42.603
10
FUNDAMENTAL OF NATIONAL NRE POLICY
11
THANK YOU
MINISTRY OF ENERGY AND MINERAL RESOURCES
Jl. Medan Merdeka Selatan No. 18, Jakarta
SUMSEL: 8 Projects PLTP in 2 Areas LAMPUNG: 7 Projects PLTP in 4 Areas JATENG: 13 Projects in 5 Areas
• Rantau Lumut Balai 115 MW, Exploitation, • Gn. Rajabasa 220 MW, Exploration, 2025 • Dataran Tinggi Dieng 245 MW, Exploitation, 2021, 2023, 2025
PLTP Project up to 2025:
2019, 2020, 2022 • Sekincau 220 MW, Exploration, 2025
• Way Panas (Ulubelu) 10 MW, Exploitation,
• Baturaden 220 MW, Exploration, 2023, 2024, 2025 113 Projects → 4.362 MW
• Rantau Dedap 220 MW, Exploitation, • Gn. Ungaran 55 MW, Exploration, 2025
2020, 2025 2023 • Candi Umbul Telomoyo 45 MW, Exploration, 2025 production equivalent to Investment (estimation)
• Way Ratai 55 MW, Exploration, 2025 • Gunung Lawu 55 MW, Exploration, 2025
205 Thousand SBM US$ 17.45 Billion
13
PROGRESS OF PLTP PROJECTS IN CENTRAL AND EAST INDONESIA
SULTENG: 1 Projects PLTP in 1 Area
Bora Pulu 40 MW, Offering Process, COD 2025
SUMMARY
MALUKU: 2 Projects PLTP in 1 Area
Installed Capacity: Tulehu 7 MW, Exploration, COD 2022
▪ Current: 2.045,6 MW
▪ Target 2025: 6.310 MW
7.288,26 MW
SUMBAR
Investment Estimation
- 8 PLTM (39,5MW), construction,
COD 2019(4),2020(3),2021(1)
- 7 PLTM (24,9MW), financing, 2021 US$ 14,58 Billion
JAMBI
1 PLTA (350 MW)
COD 2025, construction
BENGKULU
4 PLTA/M (38,7 MW)
construction,
COD 2019 (1), 2020 (1)
2021 (2)
LAMPUNG
- 1 PLTM (7,0MW)-
construction, COD 2020 Explanation:
- 1 PLTM (7,7MW)- - 0-10 MW, 139 projects 620 MW
financing, COD 2021 JABAR JATENG JATIM
- 1 PLTM (1,2 MW) - 10-50 MW, 56 projects 1089 MW
- 17 PLTM (172,7) MW- - 2 PLTM (12,4 MW)-construction
BANTEN construction COD 2019 (2) construction, COD 2020 - 50-100 MW, 11 projects 883 MW
- 4 PLTM (16,7MW)- COD 2019 (1),2020 (9), 2021(7) - 6 PLTM (162 MW)- COD plan - 6 PLTA/M(190,5 MW), - >100, 9 projects 2780 MW
construction, COD - 6 PLTM (1.048 MW)- 2019(1), 2020 (1), 2021 (2), COD plan 2020(2), - Excluding pump storage
2020(2),2022 (2) financing, COD 2024 2022(1), 2023(1) 2021(1), 2022(1), 2025(2)
- 3 PLTM (18 MW)-COD - 6 PLTM (141,90 MW)-COD plan - 4 PS (943 MW) – COD plan 2025
plan 2022 (1), 2023 (1), 2021(1), 2022(1), 2023 (1), 2024
2024 (1)
15
PROGRESS OF PLTA/M PROJECTS IN CENTRAL & EAST INDONESIA up to 2025
KALBAR KALTARA KALTIM GORONTALO SULUT
7 PLTM (47,07 MW), planning, 1 PLTM (90 MW), 2 PLTM (145 MW), 2 PLTM (11,9 MW)- - 1 PLTM (3,5 MW)-financing, 2020
2021(1), 2023(2), 2024(2), 2025(3) planning, 2025 planning, 2025 construction, 2020, 2021 - 4 PLTM (60,3 MW), planning,
COD 2021(1),2023(2), 2024(1)
SULTENG
- 5 PLTM (282,2 MW), construction,
COD 2020(3), 2021(1), 2023(1)
- 2 PLTM (9,6 MW), financing
COD 2020, 2021
- 7 PLTM (108,4 MW), planning
COD 2021(1),2022(1),2023(4),2024(1)
Explanation:
- 0-10 MW, 139 projects 620 MW SULTRA
- 10-50 MW, 56 projects 1089 MW - 1 PLTM (10 MW), procurement, 2024
- 50-100 MW, 11 projects 883 MW - 5 PLTM (45,8 MW) planning
- >100, 9 projects 2780 MW 2020(1),2023(3), 2024(1)
- Excluding pump storage
SUMMARY SULBAR
MALUKU PABAR
2 PLTM (20 MW), procurement,
8 PLTM (30,6 MW), 1 PLTM (1,3 MW)
COD 2022, 2023
218 Projects planning, 2022 (1), 2024(3), planning, COD 2024
2025(4)
Installed Capacity Estimation
7.288,26 MW PAPUA
- 1 PLTM (3 MW)
Investment Estimation SULSEL financing, COD 2024
NTB NTT
- 4 PLTA/M (108 MW), construction, COD 2020(2), 2021(2) - 2 PLTM (1,9 MW) 5 PLTM (15,35 MW) - 11 PLTM (31 MW)
US$ 14,58 Miliar - 2 PLTA/M (208,3 MW), FC process, COD 2020, 2025 construction, 2019 planning, 2021(1), planning,
- 3 PLTM (860MW), procurement, COD 2024 (1), 2025(2) - 5 PLTM (22 MW) 2022(2), 2025(2) COD 2023(2), 2024(9)
- 2 PLTA/M (433,1 MW), planning, COD 2025 planning, 2020(2), 2021(1), 2022(1)
16
Explanation:
- 0-25 MW, 41 projects 228 MW
PROGRESS OF PLTS & PLTB PROJECTS up to 2025 - > 25 MW, 19 projects 1503 MW
KEPRI BABEL KALTENG KALTARA KALTIM GORONTALO SULTENG
1 PLTS (1,8 MW) 1 PLTS (0,3 MW) 1 PLTS (0,5 MW), 1 PLTS (3 MW), planning, 1 PLTS (0,7 MW), planning, 1 PLTS (10 MW)- 1 PLTS (3,72 MW),
planning COD 2021, planning, COD (2024) COD (2024) COD (2024) construction, COD 2019 planning, COD 2019
COD 2021, planning
MALUKU UTARA
2 PLTS (1,175 MW), procurement,
COD 2021 (1), 2023 (1)
MALUKU
SUMATERA
2 PLTS (4,10 MW), procurement,
2 PLTS (51,7) MW-planning
COD 2020 (1), 2021 (1)
COD 2021 (1), 2022 (1)
PABAR
1 PLTS Lisdes (2,92 MW)
BANTEN procurement, COD 2019
3 PLTS/B spreading (320 MW)
planning PAPUA
COD 2022 (1), 2023 (1), 2025 (1) 1 PLTS Lisdes (2,55 MW)
KALSEL
1 PLTB (30 MW), planning, procurement,COD 2019
JABAR COD (2024) SULSEL
- 3 PLTS spreading (200) MW-
1 PLTB (60 MW), planning,
COD plan 2020 (1), 2021(1),
COD (2023)
SUMMARY
2022 (1)
- 2 PLTS/B spreading (300) MW-
COD plan 2023 (1), 2025 (1) 60 Projects
PLTH MALUKU
TENGAH (SERAM)
7 MW
PLTS (Baterai)
BURU 8MW
PLTB
PLTH
AMBON
Karimun Jawa PLTS (Baterai)
20MW
5 MW KEI KECIL
PLTS BUTON 8 MW
PLTS (Baterai)
30MW
SELAYAR
8 MW
18
PROGRESS OF PLTSA PROJECTS IN 12 CITIES IN 2019 (PSN) SUMMARY
PLTSa Manado
Waste: 1.000 ton/day
Prod. (est): 10-20 MW Processed Waste
COD : 2023
PLTSa Sunter Status: Pra FS ±16.000 ton/day
Waste: 2.200 ton/day
Prod. : 35 MW
PLTSa Palembang COD: 2023 Installed Capacity Estimation
Waste: 1.200 ton/day Status: Financial Close
Prod. (est): 10-20 MW
COD: 2023
160 – 240 MW
Status: FS PLTSa Semarang
Waste: 1.000 ton/hari Estimated Investment
Prod. (est): 10-20 MW PLTSa Makassar
COD: 2023 Waste: 1.400 ton
PLTSa Tangerang
Status: OBC Finalization Prod. (est): 10-20 MW US$ 1.66 Billion
Waste: 2.000 ton/day COD: 2023
Prod. (est): 10-20 MW Status: OBC revision
COD: 2023
Status: Tender
19
PROGRESS OF PLT BIOENERGY PROJECTS BASED ON
RUPTL 2019 - 2025 TOTAL : 794.1 MW
(Status November 2019) • Construction= 64.4 MW (8%)
Estimated INVESTMENT: US$ 2.6 Billion • PJBL = 85.7 MW (11%)
1
3 20 27
4 25
18
5
6 23
9
19 26
8 24
7 22 28
10
12
11
13
14
15 16
17
CPO Implementation Plan on PLN's PLTD (Diesel Power Plant) Amount: 2022 : 127,87 MW
Aceh
2023
1. PLTD An Laot Sabang
2. PLTD Pulo Pisang Kalimantan Selatan South East Sulawesi
3. PLTD Cot Trueng
2023
SUMMARY
4. PLTD Dedalu
5. PLTD Ayangan 1. PLTD Pagatan 2021 332 Units
6. PLTD Kuning 2. PLTD Kotabaru PLTD Wua Wua
Estimated Installed Capacity
7. PLTD Blangkejeren
8. PLTD Seuneubok
9. PLTD Rimo 522,92 MW
10.
11.
PLTD Tapak Tuan
PLTD Suak
West Sumatra Estimated Investment
12. PLTD Ampang Gadang
2020 2024 Rp 5,38 Trillion
13. PLTD Balun
1. PLTD Ra nting 1. PLTD Lopana
Pa i nan 2. PLTD Lambuya
2. PLTD Ra nting S.
3. PLTD Kolaka Nusa Tenggara Barat Maluku and North Maluku
Penuh
4. PLTD Bau Bau
2022 Nusa Tenggara Timur
3. PLTD Ba l un 1. PLTD Ampenan 7. PLTD Alas 2021
2. PLTD Paokmotong 8. PLTD Taliwang 2022 1. PLTD Tobelo
4. PLTD Luna ng 1. PLTD Kuanino dan Tenau 5. PLTD Waikabubak 2. PLTD Langgur
3. PLTD Niu 9. PLTD Sebotok
4. PLTD Kuanino dan Tenau 10. PLTD Dompu 2. PLTD Baranusa 6. PLTD Mautapaga 3. PLTD Masohi
5. PLTD Taman 11. PLTD Sape 3. PLTD Atambua 7. PLTD Aesesa 4. PLTD Haruku 21
6. PLTD Labuhan 4. PLTD Waingapu 5. PLTD Saparua