04 Q&CR Thickeners
04 Q&CR Thickeners
Copyright © 2008, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Page 1 of 4
Goldfields
Salares Norte Project
Contract A9SN Quality & Certification Requirements
Page 2 of 4
Copyright © 2008, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Page 2 of 4
Goldfields
Salares Norte Project
Contract A9SN Quality & Certification Requirements
Page 3 of 4
VI. SUPPLEMENTAL
VERIFICATIONS (as req’d per
P.O./ Specifications)
Piping, Valves & Filters b
Electric motors and drives f
Safety Requirements b
Coating Procedures f Fluor rep. shall review coating procedures.
Fluor rep. shall review supplier engineering, procurement and production status
Production Schedule f
against agreed Production Schedule.
Mechanical Run Test Procedures f f For HPP Only
Fabrication tolerances f
Lubrication Systems b f
Spare parts f
Internal / External Protection b
Lubrication System f
Internal Insp. Prior to Final
f
Closure
Dimensional & Visual Inspection f f X Fluor shall be notified of all dimensional differences from Vendor’s drawings.
Fluor rep. shall review internal Release Report and shall Issue material and equipment
Release Report f f X
Release Report
Packing & Preparation for
f b X
Shipment
Storage and Preservation
f f
Procedures
The Quality and Certification Requirement document provide guidelines to enable the supplier to understand the minimum
level of inspection involvement intended for the purchased equipment. The Quality and Certification Requirements are not
intended to outline all requirements for inspection and quality control as required by the purchase order, material requisition,
referenced codes, specifications and standards listed in the order requirements. Witnessed inspections, documentation
reviews, procedural compliance checks and supplemental inspections by the buyer will be conducted to ensure the
equipment's compliance with the purchase order, applicable codes, specifications and standards has been attained.
The Quality and Certification Requirement document does not imply that Fluor’s SQS representative will performed 100%
inspection on each listed activity or that the material or equipment will be accepted based on that assumption .
The Fluor SQS representative will issue an NCR to the seller when a product or service, presented to the Fluor SQS
representative for Fluor acceptance, fails to comply with PO (Purchase Order) quality requirements. The intent of the NCR is to
document the nonconforming condition for proper and timely disposition and to document the corresponding failure in the
supplier's quality system.
HOLD POINTS ASSOCIATED WITH “REVIEW” ACTIVITES WILL BE PERFORMED AT OR BEFORE FINAL RELEASE FOR SHIPMENT AND IS
NOT TO BE INTERPRETED AS AN ACTIVITY THAT HALTS MANUFACTURING.
HOLD POINTS ARE NOT INTENDED TO IMPEDE MANUFACTURERS PRODUCTION SCHEDULE PROVIDED “HOLD POINT/OBSERVATION”
NOTIFICATION IS PROVIDED TO FLUOR IN ADVANCE OF ACTIVITY.
Copyright © 2008, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Page 3 of 4
Goldfields
Salares Norte Project
Contract A9SN Quality & Certification Requirements
Page 4 of 4
SUPPLIER ACTION REQUIRED - applies to Hold and Observation columns only. Supplier is to note all 'X' marks and transfer those points
to their Inspection and Test Plans. The Fluor SQS representative will review the other action types (noted as b, c or f) with the supplier
during the Supplier Quality Alignment Meeting. These other action types are to be addressed in the Supplier's Inspection and Test Plans or
supporting Quality System.