Professional Documents
Culture Documents
Work Instructions Marking Machine (E9-P123)
Work Instructions Marking Machine (E9-P123)
4) Maintain the minimum gap between pin & part (i.e. 75% of
the depth mentioned in the program).
6) Need to run machine on average speed & not more than that.