0.5 to 1 km.
Increase in traffic
volume and worsening
of traffic flow
Impacts on community
health and safety
SITE WASTE Road rehabilitation project Construction aggregate materials and Regularly monitor Costs integrated in the
MANAGEMENT supplies are transported and stored submission of reports to construction and
Project Name: Concreting of Lauan To Tud-ol Farm To Market Road
INITIAL ENVIRONMENT EXAMINATION (IEE) CHECKLIST REPORT FOR ROAD PROJECTS
Noise and vibration Excessive noise and Construction noise and vibration is tolerable Contractor/LGU
vibration
Geology Change in landforms Consistent with the construction plans and Contractor/LGU
design
Appropriate erosion control measures
Hazardous wastes Destructive and threat Waste management is appropriate Contractor/LGU
to environment
Storage of hazardous materials(oil, fuel) is
appropriate
Maintenance program of vehicles/engines
that may cause oil leakage on the ground is
appropriate
Traffic and access Threat to human Management of traffic volume and safety is Contractor/LGU
security and safety appropriate
Conduct of education and awareness program
Establishment of traffic signs