Date : 31/08/2020

Report No. : PT. JEL-CLM-E&I-JSP-001-2020


Page : 1 of 2
Title : IPB Unit #1
PT. JURONG ENGINEERING LESTARI SAMSUNG C&T

DAILY FIT - UP INSPECTION REPORT


Joint Thikness Fit - Up Fit -Up Inspection Result
No Line-Iso-Drw-Spool Filler Met Mat'l Remark
No (mm) Date Date Acc Reject
1 J1-EGE-SCT-DRW-S00-0026 T502-1 839-1 12.5 E7018H4R S355J2 29-Aug-20
2 J1-EGE-SCT-DRW-S00-0026 T502-2 813-1 12.5 E7018H4R S355J2 29-Aug-20
3 J1-EGE-SCT-DRW-S00-0026 T502-1 839-2 12.5 E7018H4R S355J2 29-Aug-20
4 J1-EGE-SCT-DRW-S00-0026 T502-2 813-2 12.5 E7018H4R S355J2 29-Aug-20

Subcont QC QA/QC Contractor Jawa Satu Power

Nama : Nama : Nama :

Date : Date : Date :

Sign : Sign : Sign :


Date : 31/08/2020
Report No. : PT. JEL-CLM-E&I-JSP-001-2020
Page : 2 of 2
Title : IPB Unit #1
PT. JURONG ENGINEERING LESTARI SAMSUNG C&T

DAILY FIT - UP INSPECTION PHOTOS

Subcont QC QA/QC Contractor Jawa Satu Power

Nama : Nama : Nama :

Date : Date : Date :

Sign : Sign : Sign :