Download as pdf
Download as pdf
You are on page 1of 7
IMBAS PARA ALTO VACIO DE DOS ETAPAS. = TWO STAGES HIGH VACUUM PUMPS. _ Manual de Operaciones Operating Manual DVP-2A 1. COMPONENTES DE LA BOMBA 1. Manija de transporte 2. Gi bast ‘3 Carga de aceite y expulsion 1. Wsor de nivel de aceite 5, Tapén de drengje de aceite 6. citer Modelo BYP/24: 7, Base conregatonesantieszantes 8, Motor elctico con protector térmico incrporado 8. Coneccanes 1/4" fare 12" acme 10.Tapas de potecién con ong poswac 2. CARACTERISTICAS - DISEHO rset i mi 0 a a 2 {sven os magn st et es ‘Sttarsmgnranar tn et ear nn pa ge ae ‘Sn ho ans pcg ne Se mac 2 sg aa Bc mya ‘patina seas nec Pees ‘3, PROCEDIMIENTO DE PUESTA EN MARCHA - REVISIONES PREVIAS (von soreness sap ‘inet pn eh aus pty www dosivac.com estoy anderson tp ren Hn nee 4, USO DEL GAS-BALLAST ‘act ibe gee memen ra waa igi anak 5. APAGADO DE LA BOMBA ‘ir entra Aeruconcon craton ea lapse prea oie Vee sree Compectaanmacae a wx 6. MANTENIMIENTO smn camtr scat one i kn i dean tema ‘Sone ncmen cna eas ot mm og eee ‘cr en sepa nc pn ee mee Ba pee a, ‘Scoangoasesetpoheicn ‘en x pou a art anon ta atc coustenls pusean doemeuas tanaastanos cuweemecnpeteenans PROCEDIMIENTO PARA EL cAMBIO OE ACEITE: ‘re eben tte a heen Silom aetna Sis gyn 1 Featemac impr ec o riny asot 1 set ees seme nsec Soe etm re ania da i ne 7 ESPECIFICACIONES, Tenner on ie oe — 8. GARANTIA (poceetnrp tem as www dosivac.com ooswme ‘8. SOLUCIONANDO PROBLEMAS 1, PUMP COMPONENTS one ace |e rom ee ntact noe om et i ieee lew ecemem [eee a leupaa |muneeane Soemedoa tery | ? ‘Anatomic handle 7. Molded base as-ballast vane 1. loctre motor with thermal Oi fil port and exaust overioad protector Oi evel sight glass 8. Intake connections 14" are cain cap We" acme ‘Aluminum Housing (reservoir) 10, Protecting caps with orng te cn | ee www dosivac.com 2, FEATURES - DESIGN ‘sre ge sng een ons heat ee ‘va tn cw es or phi ty asa ch hn setae emnten, "imprest bac Sey het et an a ect ee ih EAE AO ‘sacra ep charpy pe ee ‘So 9rd tn side a gag. ‘sane erg nas be pt pega nec a aes ‘awesome tony ‘erm xm ee ie te a 3. START-UP PROCEDURES ‘ee “ {Qa tet gn 820 ap ‘pms unmet aw pei en ge {hemos tpn mat bm wh eed pty etter ate win Rr ea to ao ercihacerame gn erat cep ‘oan ene noe ha tans — oosmac Sringeri. aa ing wis rnin Ri etbpt de nacatand senna ot Sew a ae 4, USE OF THE GAS-BALLAST ‘Ren aan ing pis spn st ps ce ie ang ‘sca xT es eg seh na a ee ca ‘antegrade pt ‘Repo ta psd tw pe aes oi eg 8 {oi nb pa i oa ena uh nee ‘inn moe ota oc pe 5. PUMP SHUT DOWN (ene pb rss OF topo ol ‘cetera Inne rt pn oy cnn pt on ig ot het cancun 6, MAINTENANCE ‘seu omen a png tru ne ean lao ‘meats noe ea so sy est nnn eeH eS ‘nepotism sm ey | ‘tyme pe www.dosivac.com ‘1 cnansenaceoune + aerecereerenunteeeme 2) RSSRSSADSSS c ene emeceseo men =e 2 Solomons tase arene _ SERS Tet by comet ac ne ce ey 7. SPECIFICATIONS. 9, TROUBLESHOOTING GUIDE extn a a F Simms fer — law aa aa aa RTE arma [rea —tario ae | me a | oe ie - wow ena tn pte Tew oe et smasae tcc 8, WARRANTY | Coston ae ‘commun tonneatd in uci nnacawdwomnte pecan | APOE oes amram ‘Rename a Wp ons eg at | ESE wi ici pmo mt 8 ‘erase mae gray ne nyc arg me a er St ee se (vere muri tn wrap cc a mane pct ld cy om. SHOMBAS PARA ALTO VACIO DE DOS ETAPAS ‘TWO STAGES HIGH VACUUM PUMPS Manual de Operaciones Operating Manual DVP-2A

You might also like