Professional Documents
Culture Documents
Sl. No: (J. Pradhan) S.S.O, Gangtok R.O. Sikkim. Due To Lockdown Hence Its Reflection Was Not Shown On MPR
Sl. No: (J. Pradhan) S.S.O, Gangtok R.O. Sikkim. Due To Lockdown Hence Its Reflection Was Not Shown On MPR
Remarks: if any to qualify the progress of actual work undertaken in the current month:-
1. AlI India Monthly Progress Report in respect of CPI (U), Sch. House Rent Enquiry:
Sl. Name of No.of dwellings No. of Inspections Data transmission
No
R.O
Allotted Completed Casualty Supdt/ AD& Total % age Already In the Total
Sr.Supdt above Inspections Uploaded process of
uploading by
due date
(1) ( 2) (3) (4) (5) (6) (7) ( 8) (9) (10) (11) (12)
1 Gangtok 16 0 - 0 0 0 0% 0 - 0
All India Monthly Progress Report in respect of CPI(U), Sch.3.04 (PDS): Consumer prices of selected commodities
supplied under Public Distribution System in Urban areas:
Sl. Name of No.of Quotations No. of Inspections Data transmission
No
R.O
Allotted Completed Casualty Supdt/ AD& Total % age Already In the Total
Sr.Supdt above Inspections Uploaded process of
uploading by
due date
(1) ( 2) (3) (4) (5) (6) (7) ( 8) (9) (10) (11) (12)
1 Gangtok 1 1 - 0 - 0 0% 1 - 1
(J. PRADHAN)
S.S.O,
GANGTOK R.O. SIKKIM.
NOTE: CPI(U) FIELD WORK FOR HOUSE RENT ENQUIRY FOR THE MONTH OF APRIL 2020 COULD NOT BE DONE
DUE TO LOCKDOWN HENCE ITS REFLECTION WAS NOT SHOWN ON MPR.