Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

NOTE

DATE REVISION SIGN

CLIENT

EMANI GLOBAL

PROJECT

PROPOSED PROTOTYPE
WATER VENDING STATION

MECHANICAL ENGINEERS

PLOT 26 DBS ROAD, ASABA, DELTA STATE.


E-mail: awandgnresources@gmail.com
0803-091-6984, 0808-470-7466

DESIGN TEAM
Engr. Godwin E. Iweka
Engr. Okey Ani
Wilson Odu

DWG TITLE DWG. No.

WATER TREATMENT
FLOW CHART P 01
PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020
NOTE

Plant Control Panel


Raw Water DATE REVISION SIGN
3 From Borehole
Water Transfer Pumps

Low Pressure Air Compressor


Sand Filter Unit Treated Water Tank
(Elevated Tank) 3 2 1 Raw Water Tank
UV Unit (Sec. Sedimentation)

CLIENT
4
Micron Filter
Ozonator 1 EMANI GLOBAL
5

Low Pressure 4 2
Sand Filter Unit PROJECT

PROPOSED PROTOTYPE
WATER VENDING STATION

Raw Water Tank


(Pry. Sedimentation)
MECHANICAL ENGINEERS

Raw Water Tank


(Aerated & Pre-Filter)

PLOT 26 DBS ROAD, ASABA, DELTA STATE.


5 E-mail: awandgnresources@gmail.com
0803-091-6984, 0808-470-7466

Toi
DESIGN TEAM
Raw Water Tank Engr. Godwin E. Iweka
Water Dispensing Machines Ticket Station Engr. Okey Ani
(Aerated & Pre-Filter)
Wilson Odu

DWG TITLE DWG. No.

Treatment Plant Layout P 02


PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020
NOTE

DATE REVISION SIGN

Capacitor
CLIENT
Pump 1 Alarm

A V V A EMANI GLOBAL
Pump 2

DPST S/W Overload


PROJECT

Black (Common)
L N

Gr/Yel (Earth)

Brown (Start)

Blue (Run)
0
0
PROPOSED PROTOTYPE
1 3
2
3 1 Pump 3 WATER VENDING STATION

B1 B2 B3

MECHANICAL ENGINEERS
C A 3 2 1 NB
1 2 3 A C

C A 3 2 1
PLOT 26 DBS ROAD, ASABA, DELTA STATE.
E-mail: awandgnresources@gmail.com
0803-091-6984, 0808-470-7466
FRONT VIEW BACK OF COVER INSIDE ARRANGEMENT
DESIGN TEAM
Engr. Godwin E. Iweka
Engr. Okey Ani
Wilson Odu

DWG TITLE DWG. No.

Electrical Control Panel P 03


PROJECT No.
DATE
AWGN/0920 - EG01 SEPT., 2020

You might also like