This document outlines the budget for a new construction project to build an electrical tower protection wall in Ainaro Municipality, Timor-Leste. It includes 6 line items for overhead costs such as a site engineer for 6 months at $400 per month, material testing and safety equipment, project documentation, as-built drawings, and utilities for a total overhead budget of $5,300.
This document outlines the budget for a new construction project to build an electrical tower protection wall in Ainaro Municipality, Timor-Leste. It includes 6 line items for overhead costs such as a site engineer for 6 months at $400 per month, material testing and safety equipment, project documentation, as-built drawings, and utilities for a total overhead budget of $5,300.
This document outlines the budget for a new construction project to build an electrical tower protection wall in Ainaro Municipality, Timor-Leste. It includes 6 line items for overhead costs such as a site engineer for 6 months at $400 per month, material testing and safety equipment, project documentation, as-built drawings, and utilities for a total overhead budget of $5,300.
This document outlines the budget for a new construction project to build an electrical tower protection wall in Ainaro Municipality, Timor-Leste. It includes 6 line items for overhead costs such as a site engineer for 6 months at $400 per month, material testing and safety equipment, project documentation, as-built drawings, and utilities for a total overhead budget of $5,300.
PROJECT NAME : NEW CONSTRUCTION OF ELECTRICAL TOWER (NO.
55) PROTECTION WALL SECTION
LOCATION : Ainaro Municipality PROJECT NO. : NCB/030/MOP-2020 NO DESCRIPTION OF WORK ITEM UNIT QTY UNIT PRICE AMOUNT OVERHEAD 1 Contractor Project Team (Site Engineer) month 6.00 $ 400.00 $ 2,400.00 2 Material sampling & testing Ls 1.00 $ 1,000.00 $ 1,000.00 3 Safety equipment and first aid tool Ls 1.00 $ 1,000.00 $ 1,000.00