Document Number

NCI CONSULTANTS NCI-BER-CON-ACC-001


Revision Number/Date
COMMERCIAL MANAGEMENT 15 June 2016
Page Number
ACCEPTANCE COMPLETION CERTIFICATE Page 1 of 1

Project No. TITLE: OFF LOADING GANTRY

UNIT No: OFF LOADING UNIT OFF LOADING GANTRY


DESCRIPT
ION:
NOTICE OF ACCEPTANCE OF WORK CONDUCTED IN PETROMOC – BEIRA TERMINAL – OFF LOADING
GANTRY
Sub-Section No: OFF LOADING Sub-Section Title: OFF LOADING GANTRY
The Managing Contractor advises that the above OFF LOADING GANTRY conforms in all respects to the AFC drawings and
specifications and is considered to have met the conditions for "Acceptance of Completion". The work includes, as applicable:

- Installation of Off Loading Pumps


- Installation of Valves
- Corrosion Protection
- Commissioning of both Off loading Pumps

1. The system was not pressure tested due to modifications done to suit.
2. 2 off Off loading PUMPS have been connected to existing PETROMOC Electrical system and tested in line with
Manufacturers requirements
3. 100% NDT was done on all modifications to line which is in line with ASME B31.3
4. Both Export Pumps have been Laser Aligned as per ASME Standard Code requirements

All Category 1 punch items have been signed-off;


Hand marked-up, as-built drawings will be provided;
All construction - related documentation has been provided, as per project procedures;
All engineering - related documentation has been provided, as per project procedures.

ADVISED RESPONSIBILITY NAME & SURNAME SIGNATURE DATE


BY NCI CONSULTANTS 02/02/2017
NCI CONSULTANTS 02/02/2017
PETROMOC OPERATOR 02/02/2017
PETROMOC OPERATOR 02/02/2017

ACCEPTANCE OF COMPLETION (AC) OF WORK CONDUCTED IN PETROMOC – BEIRA TERMINAL – OFF


LOADING GANTRY
PETROMOC confirms acceptance of the above was completed and both OFF LOADING pumps have been commissioned in the
presence of NCI.

NCI – confirms that they will only be held liable for modification of line up until the TIE-IN. This existing line was
previously utilized by PETROMOC and still remains their responsibility.
Document Number
NCI CONSULTANTS NCI-BER-CON-ACC-001
Revision Number/Date
COMMERCIAL MANAGEMENT 15 June 2016
Page Number
ACCEPTANCE COMPLETION CERTIFICATE Page 2 of 1

TRUCK No TOTAL VOLUME (Litres) DURATION COMMENTS

NB – This document serves as confirmation that NCI has conformed to contract requirements set out by PETROMOC and
also notes that Commissioning has been completed successfully.

NAME & DATE


RESPONSIBILITY COMPANY SIGNATURE
SURNAME

PROJECT MANAGER NCI CONSULTANTS DEON LAZARUS

QUALITY CONTROL NCI CONSULTANTS STEVEN NZIMELA

BEIRA TERMINAL
PETROMOC – BEIRA JOSÉMARIA SIMÃO
MANAGER

OPERATIONS BEIRA PETROMOC – BEIRA ARMANDO CAISSE

HEAD OF ENGINEERING
AND MAINTENANCE PETROMOC – MAPUTO ELEUTERIO UAILA
DIVISION
ENGINEERING AND
MAINTENANCE PETROMOC - MAPUTO LUIS MACIE
MANAGER
OPERATIONS PROJECT
PETROMOC - MAPUTO SERGIO UAMUSSE
LEAD