OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - BALIKUDA

Total PBH HRS Total Down hours Current UP Time


DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN 192:00:00 3:48:34 188:11:26
Jagatsinghpur BHQ_Balikuda 17th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 18th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Balikuda 19th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Local Power Cut 0:00:00 Non-IT
Jagatsinghpur BHQ_Balikuda 21th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Balikuda 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Balikuda 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Balikuda 24th OCT 2019 8:00:00 92.9% 0:34:17 7:25:42 ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Balikuda 25th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Balikuda 28th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Balikuda 29th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Balikuda 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Balikuda 31st OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Balikuda 01st NOV 2019 8:00:00 91.7% 0:39:59 7:20:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Balikuda 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 4th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 Total 0:00:00
Jagatsinghpur BHQ_Balikuda 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Balikuda 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 188:11:26 98.02
Jagatsinghpur BHQ_Balikuda 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 8th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51
Jagatsinghpur BHQ_Balikuda 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 13th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Balikuda 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - BIRIDI Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN BHQ_Bi 192:00:00 19:34:53 172:25:07
Jagatsinghpur BHQ_Biridi 17th OCT 2019 8:00:00 92.9% 0:34:00 7:25:59
Jagatsinghpur BHQ_Biridi 18th OCT 2019 8:00:00 92.9% 0:34:00 7:25:59 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Biridi 19th OCT 2019 8:00:00 96.5% 0:16:55 7:43:04 Local Power Cut 15:02:50 Non-IT
Jagatsinghpur BHQ_Biridi 21th OCT 2019 8:00:00 89.3% 0:51:18 7:08:41 Local Power Cut Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Biridi 22th OCT 2019 8:00:00 75.1% 1:59:37 6:00:22 Local Power Cut NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Biridi 23th OCT 2019 8:00:00 57.2% 3:25:27 4:34:32 Local Power Cut OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Biridi 24th OCT 2019 8:00:00 89.4% 0:51:04 7:08:55 Local Power Cut ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Biridi 25th OCT 2019 8:00:00 92.9% 0:34:00 7:25:59 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Biridi 28th OCT 2019 8:00:00 85.7% 1:08:24 6:51:35 Local Power Cut CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Biridi 29th OCT 2019 8:00:00 89.4% 0:51:07 7:08:52 Local Power Cut FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Biridi 30th OCT 2019 8:00:00 96.5% 0:16:57 7:43:02 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Biridi 31st OCT 2019 8:00:00 92.9% 0:33:56 7:26:03 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Biridi 01st NOV 2019 8:00:00 79.3% 1:39:34 6:20:25 Local Power Cut Local Strike 0:00:00 Non-IT
Jagatsinghpur BHQ_Biridi 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Biridi 4th NOV 2019 8:00:00 89.3% 0:51:14 7:08:45 Local Power Cut Total 15:02:50
Jagatsinghpur BHQ_Biridi 5th NOV 2019 8:00:00 89.3% 0:51:15 7:08:44 Local Power Cut SLA Meet %
Jagatsinghpur BHQ_Biridi 6th NOV 2019 8:00:00 78.6% 1:42:39 6:17:20 Local Power Cut SLA after evidence 187:27:57 97.64
Jagatsinghpur BHQ_Biridi 7th NOV 2019 8:00:00 89.4% 0:51:04 7:08:55
Jagatsinghpur BHQ_Biridi 8th NOV 2019 8:00:00 92.9% 0:33:58 7:26:01
Jagatsinghpur BHQ_Biridi 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Biridi 13th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Biridi 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Biridi 15th NOV 2019 8:00:00 89.4% 0:51:05 7:08:54 Local Power Cut
Jagatsinghpur BHQ_Biridi 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - ERSAMA Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN BHQ_Er 192:00:00 3:00:00 189:00:00
Jagatsinghpur BHQ_Erasama 17th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Erasama 18th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Erasama 19th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Local Power Cut 1:06:05 Non-IT
Jagatsinghpur BHQ_Erasama 21th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Erasama 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Erasama 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Erasama 24th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Erasama 25th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Erasama 28th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Erasama 29th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Erasama 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Erasama 31st OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Erasama 01st NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Erasama 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Erasama 4th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 Total 1:06:05
Jagatsinghpur BHQ_Erasama 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Erasama 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 190:06:05 99.01
Jagatsinghpur BHQ_Erasama 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Erasama 8th NOV 2019 8:00:00 95.9% 0:19:42 7:40:17
Jagatsinghpur BHQ_Erasama 11th NOV 2019 8:00:00 86.2% 1:06:05 6:53:54 Local Power Cut
Jagatsinghpur BHQ_Erasama 13th NOV 2019 8:00:00 98.2% 0:08:29 7:51:30
Jagatsinghpur BHQ_Erasama 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Erasama 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Erasama 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - KUJANGA Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN BHQ_K 192:00:00 4:17:09 187:42:51
Jagatsinghpur BHQ_Kujanga 17th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 18th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Kujanga 19th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Local Power Cut 0:00:00 Non-IT
Jagatsinghpur BHQ_Kujanga 21th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Kujanga 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Kujanga 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Kujanga 24th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Kujanga 25th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Kujanga 28th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Kujanga 29th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Kujanga 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Kujanga 31st OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Kujanga 01st NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Kujanga 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 4th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 Total 0:00:00
Jagatsinghpur BHQ_Kujanga 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Kujanga 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 187:42:51 97.77
Jagatsinghpur BHQ_Kujanga 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 8th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 13th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51
Jagatsinghpur BHQ_Kujanga 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Kujanga 16th NOV 2019 8:00:00 71.4% 2:17:08 5:42:51 Local Power Cut

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - NUAGAON Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN 192:00:00 5:52:56 186:07:04
Jagatsinghpur BHQ_Naugaon 17th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51
Jagatsinghpur BHQ_Naugaon 18th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Naugaon 19th OCT 2019 8:00:00 90.7% 0:44:36 7:15:23 Local Power Cut 3:08:20 Non-IT
Jagatsinghpur BHQ_Naugaon 21th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Naugaon 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Naugaon 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Naugaon 24th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Naugaon 25th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Naugaon 28th OCT 2019 8:00:00 60.8% 3:08:19 4:51:40 Local Power Cut CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Naugaon 29th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Naugaon 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Naugaon 31st OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Naugaon 01st NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Naugaon 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 4th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 Total 3:08:20
Jagatsinghpur BHQ_Naugaon 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Naugaon 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 189:15:24 98.57
Jagatsinghpur BHQ_Naugaon 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 8th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 13th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Naugaon 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - RAGHUNATHPUR Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN BHQ_R 192:00:00 2:34:17 189:25:43
Jagatsinghpur BHQ_Raghunathpur 17th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 18th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Raghunathpur 19th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Local Power Cut 1:42:51 Non-IT
Jagatsinghpur BHQ_Raghunathpur 21th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Raghunathpur 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Raghunathpur 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Raghunathpur 24th OCT 2019 8:00:00 89.3% 0:51:25 7:08:34 Local Power Cut ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Raghunathpur 25th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Raghunathpur 28th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Raghunathpur 29th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Raghunathpur 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Raghunathpur 31st OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Raghunathpur 01st NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Raghunathpur 2nd NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 4th NOV 2019 8:00:00 89.3% 0:51:25 7:08:34 Local Power Cut Total 1:42:51
Jagatsinghpur BHQ_Raghunathpur 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Raghunathpur 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 191:08:34 99.55
Jagatsinghpur BHQ_Raghunathpur 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 8th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 13th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Raghunathpur 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51

Authorised Signature With Seal


OSWAN PoP STATUS REPORT FOR THE PERIOD FROM 17 OCT to 16 NOV -2019 DHQ JAGATSINGHPUR BLOCK - TIRTOL Total PBH HRS Total Down hours Current UP Time
DHQ BHQ Date Working Hours Availability Down Time UP Time REASON FOR DOWN BHQ_Tir 192:00:00 2:17:09 189:42:51
Jagatsinghpur BHQ_Tirtol 17th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51
Jagatsinghpur BHQ_Tirtol 18th OCT 2019 8:00:00 96.4% 0:17:08 7:42:51 REASON FOR DOWN Down Hours Issue Type
Jagatsinghpur BHQ_Tirtol 19th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Local Power Cut 0:00:00 Non-IT
Jagatsinghpur BHQ_Tirtol 21th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Electrical Issue 0:00:00 Non-IT
Jagatsinghpur BHQ_Tirtol 22th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 NMS Pooling Error 0:00:00 Others
Jagatsinghpur BHQ_Tirtol 23th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 OFC Cut 0:00:00 Link Issue
Jagatsinghpur BHQ_Tirtol 24th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 ETR Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Tirtol 25th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 PCM Failure 0:00:00 Link Issue
Jagatsinghpur BHQ_Tirtol 28th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 CPE Issue 0:00:00 HO Dependency
Jagatsinghpur BHQ_Tirtol 29th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 FANI Cyclone 0:00:00 Others
Jagatsinghpur BHQ_Tirtol 30th OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 UPS Issue 0:00:00 IT
Jagatsinghpur BHQ_Tirtol 31st OCT 2019 8:00:00 100.0% 0:00:00 8:00:00 Router Issue 0:00:00 IT
Jagatsinghpur BHQ_Tirtol 01st NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 Water Leakage 0:00:00 Non-IT
Jagatsinghpur BHQ_Tirtol 2nd NOV 2019 8:00:00 96.4% 0:17:08 7:42:51
Jagatsinghpur BHQ_Tirtol 4th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 Total 0:00:00
Jagatsinghpur BHQ_Tirtol 5th NOV 2019 8:00:00 92.9% 0:34:17 7:25:42 SLA Meet %
Jagatsinghpur BHQ_Tirtol 6th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00 SLA after evidence 189:42:51 98.81
Jagatsinghpur BHQ_Tirtol 7th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 8th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 11th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 13th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 14th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 15th NOV 2019 8:00:00 100.0% 0:00:00 8:00:00
Jagatsinghpur BHQ_Tirtol 16th NOV 2019 8:00:00 96.4% 0:17:08 7:42:51