Professional Documents
Culture Documents
Basic Data Sheet - Format
Basic Data Sheet - Format
A. Identification
District State
Type of company
(Propreitorship / Partnership / Pvt. Ltd. / Ltd)
Name of CEO/ MD
- CO2 Percentage
- O2 Percentage
- Others
CA Chamber RH (%)
Special Provisions
- Ethylene Control
- Air Purification
- Sanitation
Bins/ Crates
- Size of Bin
L x B x H (m)
No of mezzanine floors
Ante Room
Machine Room
Office Area
Any Other
External Internal
Type of material
Density (kg/m3)
No of layers &
Type of Bituminious/Sticking
Compound
No of Insulated CA doors
Insulation Material
Type of Cladding
& Equipments
Process Line
Please attach a Plan & Layout of the proposed Cold Store unit in accordance to the Statutory
Building By-Laws and BIS Building Codes & Standards duly approved by a Registered
Architect and Structural Engineer. The drawings should detail out insulation type, thickness,
and fixing methodology in sectional details.
Others
Transmission Load
Product Load
Internal Lighting load
Load
Occupancy Load
Infiltration Load
Holding Period
Defrost Period
Please attach detailed heat load calculation sheets of the proposed cold store unit in
accordance to the prescribed Technical Standards and Guidelines duly approved by a
Qualified Engineer.
Type of System
Type of Compressor
Type of condenser
Type of defrosting
Cooling Nos Operating Parameters Cooling Fan & Pump Total Remarks
Tower DB & WB Temp, in/ Tower Capacity Electric Working
Make & out water temp (°C) Capacity (CMH/LPS) Power. /Standb
Model (kW) Motor (kW) (BkW) y
Please attach Technical Data sheets of each equipment namely Compressors, Condensers,
Cooling Towers, Air Cooling Units giving General Layout, Dimensions, Material of
Construction, Rated Capacity, Operating Parameters and COP (please note that the Air
Cooling Unit data sheet should include heat transfer area. Fin spacing, no. of rows, air
flow, face velocity, fan static, air throw, Fan Motor BKW/KW, fin spacing, etc ) duly
Certified by the respective equipment manufacturers with reference to the Relevant Codes
& Standards. In case, equipment selection is in process, then data sheet for options being
tried be provided and range of design values be indicated in data sheet.
E. Electrical Installation
(proposed)
Water based
Handling
measures
Safety devices – LP/HP cutouts, safety valves, shut
off valves etc.
Details of Emergency alarm system
& push buttons in cold chambers
Emergency lighting in Cold chambers & other areas
Lighting arrestors
Construction Materials
CA Storage Systems
Food Safety
Others
- CA Safety Considerations for
Operators
Air Purger
Pollution Control
K. Other Information