Item Name Page No
1) General Description 2
2) Vessel Specifications 4
3) Design Action 4
4) Permanent Action (Dead Load) 5
5) Fender Design of Breasting 5
a) Berthing Energy 5
b) Berthing Energy on Ro-Ro berth 5
6) Design of Mooring 6
a) Evaluation of Mooring Loads 6
7) Steady Drag Force 7
8) Inertia force 7
9) Wave Slam 7
10) Other Loads 7
11) References 8
12) Evaluation of Point of Fixity of Pile 8
Page 1
Analysis and Design Report on Jetty
1. Design Consideration:
a) Codes and Standards:
b) Gravity Loadings:
c) Lateral Loading:
d) Load Combinations:
I. 1.4D+1.7L
II. 0.75(1.4D+1.4T+1.7L)
III. 0.9D+1.4F
IV. 1.4D+1.7L+1.4F
V. 1.4D+1.7L+1.7H
VI. 0.9D+1.3W
VII. 0.9D+1.43E
VIII. 0.75(1.4D+1.7L+1.7W)
IX. 0.75(1.4D+1.7L+1.87E)
X. 0.9D+1.7H
XI. 1.4(D+T)
e) Material Properties:
Yield Strength of Steel, fy= 500 MPa. (ASTM A615 or equivalent)
Cylinder Crushing Strength of Concrete at 28 days, f’c =30 MPa. (ASTM C
39 or equivalent).
Target minimum strength shall be 38 MPa or as per ACI 318/ equivalent code.
Wood for edge protection as per specifications and conformed by design
engineer.
f) Other considerations:
Angle of wind off blow is 60⁰
Presumptive current velocity is 1m/s
Value of Ki in Morrison equation to be as per following SPM graph.
Page 3
Analysis and Design Report on Jetty
2. Vessel Specifications:
(Ref: Design of Marine Fender--- by Bridgestone.)
Dead Weight Tonnage (DWT) = 3000 ton
Length of Vessel = 90m
Width / Beam of Vessel = 13.0m
Maximum Draught of Vessel= 5.7m
Depth of vessel= 6.8m
3. Design Action:
Permanent Action (Dead Load).
Imposed Action (Live Load).
Wind Action.
Current Action and Debris Action.
Hydrostatic Action.
Wave Action.
Earth Quake Action.
Page 4
Analysis and Design Report on Jetty
5. Fender of Berthing
5.1. Berthing Energy
Where,
CM= Hydrodynamic mass coefficient= 1 + 2D/B= 1.877
D= Draught of the vessel= 5.7 m
B= Beam of the vessel =13.0 m
MD= Displacement of the ship= 1.4 x 3000=4200 ton
VB= Velocity of the vessel normal to the berth = 0.3 m/s
CE=Eccentricity coefficient = K2/ (K2+R2) ≈ 0.2
K= (0.19 Cd+0.11) L= 21.87
Cd= Block coefficient =0.65~0.70
R= Distance of the point of contract to the centre of mass = 45 m
L= Length of the hull between perpendiculars = 90 m
CS= Softness coefficient = 1.0
CC= Berth configuration coefficient =1.0
Page 5
Analysis and Design Report on Jetty
E2= 0.5CMMD (Vsinα) 2 CE CS CC ------------- (3) (Ref: BS: 6349-4:94, Art: 4.7.6.4.1)
α= the angle of approach = 15 deg (ref: Art: 4.7.6.4.1 of BS 6349-4: 94),
For outer end fender E2=66.2 kN-m
Design Energy to be absorbed by fender shall be 70.95kN-m.
6. Design of Mooring
Where
FTW= the transverse wind force, kN.
FLW= the longitudinal wind force, kN.
Angle of wind off bow = 60⁰ (critical condition)
CTW= the transverse wind force coefficient = 1.8
CLW= the longitudinal wind force coefficient = 0.9
ρA= density of air = 1.3096 kg/m3 at 0 °C
= 1.1703 kg/m3 at 30 °C
AL= longitudinal projected area of the vessel above water = 1.1 x 90 = 99 m2
VW= design wind velocity= 260kmph =72.25 m/s
Where,
FTC= the transverse current force, kN.
FLC= the longitudinal current force, kN.
CTC= the transverse current drag force coefficient = 1.25 at 60 deg flow (ref: fig: 26 BS6349-
1:2000)
CLC= the longitudinal current drag force coefficient = -0.1 (ref: fig: 26 BS6349-1:2000)
CCT= the depth correction factor for transverse direction= 6.7(ref: fig: 30 BS6349-1:2000)
CCL= the depth correction factor for longitudinal direction = 1.5(ref: fig: 31 BS6349-1:2000)
ρA= density of water = 1025 kg/m3
LBP= length between perpendiculars of the vessel= 90-10= 80m
dm= mean draught of the vessel=5.7m
Page 6
Analysis and Design Report on Jetty
Where,
CD= drag force coefficient =0.90
ρ= density of water in ton per m3=1.025 t/m3
V= Current velocity = 3 m/s
An= area normal to the flow = 7.75 x 0.5=5.04 m2
8. Inertia Force
The Inertia Force can be calculated from Morison equation,
Fi= 0.0625 Ci ρ g D2 H Ki --------------- (10)
9. Wave Slam
The vertical wave slam force of a cylindrical member can be expressed from
Additional force per pile = steady drag force+ Inertia force + wave slum
= 20+0.24+9.07 = 29.31 kN
Page 7
Analysis and Design Report on Jetty
11. References:
1. C.A. Thoresen, “Port Designer’s Handbook:
Recommendations and Guidelines”.
2. C. Guedes Soares & P.K.Das, “Analysis and design of
Marine Structure”.
3. J.W. Gaythwaite, “Design of Marine Facilities for the
Berthing, Mooring and Repair of Vessels.
4. Edward Bruijn, “Thesis Report on Plastic Design of
Breasting Dolphin”.
12. Evaluation of Point of Fixity of Pile from Dredged Level (-9.5mRL) at Free Head
Condition:
(A) For sands:
a. [Ep lw / nh ] 0.2
=1.8 x [3759 x 1.088/0.556]0.2 = 11.97 ft= 3.65m
Where:
Ep = modulus of elasticity of pile (ksi) = 57000√ (4350) =3759ksi
lw = weak axis moment of inertia for pile (ft4 )=1.92
nh = rate of increase of soil modulus with depth for
Sands as specified in Table C10.4.6.3-2 (AASHTO- 2010) (ksi/ft) = 0.556
Page 8
Analysis and Design Report on Jetty
Page 9