Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

EVIDENCE PLAN

COMPETENCY STANDARD: ELECTRICAL INSTALLATION AND


MAINTENANCE NC II
INSTALL WIRING DEVICES OF FLOOR AND
WWALL MOUNTED OUTLETS, LIGHTING
UNIT OF COMPETENCY:
FIXTURES/SWITCHES AND AUXILIARY
OUTLETS
Ways in which evidence will be collected

Observation and Questioning

Demonstration & Questioning

Written Test
(tick the column)

The evidence must show that the trainee……

1. Read and interpreted drawings correctly based on job


/ /
requirements
2. Determined correct quantities of conduit and accessories
/ /
as per job requirements
3. Assembled conduits and ensured that fittings are fully
/ /
inserted and tightened as per job requirements
4. Bent conduits with bends not exceeding 90 0 as per job
/ / /
requirements
5. Threaded conduit in line with job requirements / /
6. Installed electrical metallic conduits* / / /
7. Installed wire ways and cable trays as per job requirement / / /
8. Performed correct procedures for installation of wiring
/ / /
devices
9. Performed correct procedures for installation of electrical
/ / /
protection system in line with job requirements
10. Followed safety procedures in line with SOP* / / /
11. Made final check to ensure that work conformed with
/ / /
instruction and job requirements
12. Clean, checked and returned tools, equipment and any
/ / /
surplus materials to storage in accordance with SOP
13. Cleaned and safe the work area according to OH&S / / /
regulations
Date developed: Document No

September 2017 Issued by: Offshore-


Onshore Institute of
Evidence Plan for Technology, Inc.
ELECTRICAL INSTALLATION AND MAINTENANCE NC II Page 1 of 2
Developed by: Revision No.
REALYN N. LECHUGA
Date developed: Document No

September 2017 Issued by: Offshore-


Onshore Institute of
Evidence Plan for Technology, Inc.
ELECTRICAL INSTALLATION AND MAINTENANCE NC II Page 2 of 2
Developed by: Revision No.
REALYN N. LECHUGA

You might also like