Professional Documents
Culture Documents
Operacion y Mantenimiento de Reconectadores
Operacion y Mantenimiento de Reconectadores
(For any troubles during operation, please refer a separate section "Troubles and Troubleshooting")
1 Initial Conditions at the time of OVR-38 recloser are shipped from the factory with
Shipping
- The recloser in OPEN(OFF) condition
- The emergency manual trip (K69) handle locked & "BLOCK CLOSE" activated.
2 Checks and preparations before Please follow the procedure of this manual and complete:
Power ON.
2.1: Installation of LV & HV Units (please refer section-6)
2.2: Installation of other optional equipments (such as Surge arrestors, Auxiliary
control transformer/Auxiliary PT) (please refer section-6)
2.3: Connecting & routing the control cable between LV & HV Units. (please refer
section-6 & Annexure-4 )
2.4: Connecting & routing all the ground connections (please refer section-6)
2.5: Reset the emergency manual trip (k69) handle & release the BLOCK CLOSE.
2.6; Check and firmly connect the 2Pin Green Coloured Male-Female connectors
F26 & F27 as per Schematic Diagram. This will connect the two 12V batteries in
series .
3 To Power ON the LV Cabinet 3.1: Connect the Auxiliary power cable to the LV Cabinet (please refer
with Auxiliary power section-6 & Annexure-5)
3.2: Switch ON the auxiliary power from the source
3.3: Check the availability of the auxiliary power on terminals "201-202" in LV
cabinet
3.4: Switch ON the MCB- AUX SUPPLY MAINS (D10-33) inside the LV Cabinet.
4 To Power ON the cubicle - Switch ON the MCB : D10-31 :MCB for LAMP AND AUX. POWER OUTLET.
illumination & Auxiliary power - Cubicle Illumination Lamp : ON/OFF is controlled by door limit switch; hence
outlet glows when and till the outer swing door is opened.
- Auxiliary power outlet socket has an inbuilt toggle switch for switching ON/OFF
the auxiliary power from the aux. power outlet.
5 To Power ON the heaters for LV - Switch ON the MCBs D10-29 & B10-30 to power the heaters in HV & LV Units
& HV units respectively.
- Heater in LV unit is thermostatically controlled. The thermostat is built in part of
ACU.
- Heater in HV unit does not have thermostat control. Thus it can be either kept
ON or OFF by the MCB B10-29.It is recommended to keep this heater always
ON to avoid condensation in HV cabinet.
6 To connect the Auxiliary Supply - Switch ON the MCB : D10-31 : MCB for ACU
to ACU
7 To connect the batteries to ACU - Switch ON the MCB: D10-24 MCB for Battery. Check and firmly connect the
2Pin Green Coloured Male-Female connectors F26 & F27 as per Schematic
Diagram. This will connect the two 12V batteries in series . Check the voltage
across Battery Terminals .It should be 24V.
8 To Power ON the Auxiliary - Switch ON the MCB : B10-36 : MCB for Radio Modem.
.Supply to Radio Modem - Note that the radio modem & the MCB for radio modem are optional provisions.
(Optional)
9 To Start Capacitor Charging - Put the Service /DISCHARGE selector in the LV cabinet from "DISCHARGE
position" to "Service" position.
- This step connects the ACU to capacitor
11 AR Ready Indication on Relay When ACU completes all the internal checks and fully charges the capacitors; the
LED LED "AR Ready" on RER615 relay turns GREEN, indicating that the recloser is
ready for operations.
(Please refer the approved/as built wiring diagram for detailed description on
RER615 LED indications applicable for your unit).
12 CLOSE Operation. - Confirm that the emergency manual trip (K69) handle is reset.
- Confirm the recloser status as OPEN (from Relay LED, from recloser
OPEN symbol of the single line diagram on relay LCD screen; from the
ON/OFF indicator on HV unit).
- Press the (I) button on relay HMI. Relay will display a message "CLOSE
CBXCBR1? YES/NO". Press the ENTER push button on YES option.
This closes the recloser.
13 OPEN Operation - Confirm the recloser status as CLOSE (from Relay LED, from recloser
CLOSE symbol of the single line diagram on relay LCD screen; from the
mechanical ON/OFF indicator on HV unit).
- Press the (O) button on relay HMI. Relay will display a message "OPEN
CBXCBR1? YES/NO". Press the ENTER push button on YES option.
This opens the recloser.
To a large extent, the safety and successful functioning of any apparatus or system connected with the recloser
depends on the proper installation, commissioning, programming and configuration of the unit.
To provide long, reliable service, the recloser should be inspected at regular intervals. Operating experience,
environmental conditions, the number of operations, the magnitude of current interrupted and any unusual service
conditions will guide you in establishing a maintenance schedule.
Recommended Recommended
Interval Interval
Sr. Tests/
Work to be performed (for installations (for installations
no. Inspections
in normal in dusty and
ambient) polluted ambient)
18 months
12 months
Check for all the Ground (earth) connections to be secured (adjust the
Visual (adjust the interval
1 and undamaged interval
inspections according to
according to
experience)
experience)
All nameplates/rating plates, labels clearly legible & secured
Recommended Recommended
Interval Interval
Sr. Tests/
`Work to be performed (for installations (for installations
no. Inspections
in normal in dusty and
ambient) polluted ambient)
handle
Battery Replacement
(Please refer to the battery product documentation by the
3 Replacements manufacturer for instructions on optimal utilization of battery 3 Years 3 years
life; based on frequency/duration of external auxiliary supply
failures and extent of battery discharge during such
conditions)
It may be required to remove the RER615 relay & Batteries for replacements. Please refer sections 8.1 & 8.2 for more
information.