Estimated Cost for New Construction of 20 m Pilot Launch (1 - Unit)

Sr. Material Cost Labour Cost Total Cost


Description Qty
No MMK USD MMK USD USD
1 1 Lot 42,000 21,000,000 15,556 57,556
Hull Steel Wt. (35 Tons)
(37.88 m3 @ 1.2m T)
(Inc: Electrodes, Propane, Oxygen)
2 Outfittings 1 Lot 5,000 1,000,000 741 5,741
3 Main Engine (500 Bhp) & Gearbox 2 Sets 200,000 2,000,000 1,481 201,481
4 Main Genset (35 kVA) 1 Set 55,000 250,000 185 55,185
5 Harbor Genset (12 kVA) 1 Set 10,000 150,000 111 10,111
6 Propeller & Shafting System 2 Sets 100,000,000 74,074 5,000,000 3,704 77,778
7 Steering System 1 Lot 3,000 500,000 370 3,370
8 Anchor, Chain & Capstan Anchor Winch 1 Set 5,000 500,000 370 5,370
9 Ceiling, Walling & Furnitures 1 Lot 5,000 1,500,000 1,111 6,111
10 Plumbing & Piping System 1 Lot 5,000 1,000,000 741 5,741
11 Air Conditioning & Ventilation System 1 Lot 5,000,000 3,704 500,000 370 4,074
12 Electrical Equipments & Wiring 1 Lot - -
13 Painting & Cathodic Protection (472.6 m2) 1 Lot 7,000,000 5,185 2,500,000 1,852 7,037
14 Electricity, Yard & Undocking Charges 1 Lot 10,000,000 7,407 7,407
15 Design 10,000
Total Cost 456,963

1 USD = 1350 MMK