MATERIAL LIST - FABRICATION

N
PT. SIZE DESCRIPTION QTY
1 18 PIPE, CS, STD ERW, API 5L GR.B, PSL 1 11640 MM
2 18 45 LR ELBOW, CS, STD SMLS, ASTM A234 WPB, ASME B16.9 2
3 18 90 LR ELBOW, CS, STD SMLS, ASTM A234 WPB, ASME B16.9 1
4 18 FLANGE, RFWN, 150LB, FS, ASTM A105, ASME B16.5 1

X 73093
Y 68761
EL +1435

45

18"-ULSD/GA-1120-BQ015
ATTWins Existing 18"
329
6

<A 2457
487 >
6 1
2 MATERIAL LIST - ERECTION
<B> 1 105
2
4 600 PT. SIZE DESCRIPTION QTY
3 4
4
173
7 173
7 5 18 GASKET, 4.5mm, 150LB, SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED, 1
AISI316, PER ANSI16.20
5
2 <C 7
>
1
18"-ULSD/GA-1120-BQ014 959
CONT. ON
DRG 2
6 <D> X 75508
1 Y 56000
18"
EL +757

678
3

678

PIPE DATA CUTTING LIST


PED Category: I
P&ID: 1628-DD1-ME17140-09-01-DG002
PIECE LENGHT [mm] SIZE SPEC
Design Temperature: <A> 4450 18" 1A
Operational Temperature: <B> 1885 18" 1A
Design Pressure: 9 barg <C> 5032 18" 1A
Operational Pressure: 2.4 barg
<D> 273 18" 1A
Insulation: -
Heat Tracing: -
Test Fluid: Water
Test Pressure: 13.5 barg
Radiographic Testing: 10%

0 PDP GJA 29.04.2020.


Revision Opis promjene / Revision Description: Revidirao Odobrio Datum /Date:
Naziv projekta: IVICOM Consulting d.o.o.

Project title: M B 0 7 0 1 0 6 5 2 8
O IB 20 7 78 5 15 76 7
Investitor: Tel: +385 1 6286 602
Fax: +385 1 6608 602
Client: OIB: 18102992360 w ww .iv ico m - co n su lti n g.c o m

Projektant: Goran Javorek dipl.ing.str.


Construction:
Lokacija: Designed by:
General Notes: Plant coordinate system XYZ: Drawing Notes: Location:
- Y parallel to Design North Razina projekta: IZVEDBENI PROJEKT Vrsta projekta: STROJARSKI PROJEKT IZOMETRIJA CJEVOVODA
- the origin of Plant coordinate system XY is: N4766922.16; E575941.45 per HTRS96 Project type: DETAIL DESIGN Project part: MECHANICAL DESIGN Content: PIPING ISOMETRIC
Gl. projektant: Goran Javorek dipl.ing.str. Suradnik: Paolo Del Ponte, mag.ing.traff. 18"-ULSD/GA-1120-1A
FABRICATION WELD SOCKET THREADED COMPN PIPE INSULATED HEATED PIPE POSITION Main Designer: Associate:
WELD WELD JOINT JOINT SUPPORT PIPE PIPE SPOOL ZOP / Job No List br. / Sheet Format / Format Datum / Date Mjerilo / Scale Revizija / Rev Oznaka dokumenta: / Designation /Dwg No
<A> 1 1823-DD 1 /4 A3 04/2020 M- 0 1823-DD-ME-19218-11-01 DG-308
MATERIAL LIST - FABRICATION
N
PT. SIZE DESCRIPTION QTY
1 18 PIPE, CS, STD ERW, API 5L GR.B, PSL 1 21301 MM
2 18X16 TEE, REDUCING, CS, STD SMLS, ASTM A234 WPB, ASME B16.9 1
3 18X2 WELDOLET, CS, SMLS, ASTM A234 WPB, MSS-SP-97 1
4 18 45 LR ELBOW, CS, STD SMLS, ASTM A234 WPB, ASME B16.9 3
5 16 FLANGE, RFWN, 150LB, FS, ASTM A105, ASME B16.5 1

457 21
CONT. ON
DRG 4
X 97833 22 1 X 98861
>
Y 56462 <D Y 56000
EL +1196 18" 9 EL +1196
8 102
4
1 20 2
>
567 <C
EL +1196 18X16"
4
19 196

906
MATERIAL LIST - ERECTION

1
17
18

>
<B
PT. SIZE DESCRIPTION QTY
641
641 6 16 GASKET, 4.5mm, 150LB, SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED, 1
386
3 AISI316, PER ANSI16.20
18X2" >
1 16 7 1 (16) STUD BOLTS, ALLOY STEEL, 150LB, ASTM A 193 GR.B7, WITH 2 1
<A SEMI-FINISHED HEAVY HEX NUTS ASTM A194 GR.2H
4 8 16 BLIND FLANGE, FS, ASTM A105, ASME B16.5 1
267
4 10
231 11 CONT. ON
DRG 3
31 4 X 94841
18"-ULSD/GA-1120-BQ013 191 912 Y 56000
SLEEVE EL +288
4 2
1790 556 CONT. FROM SLEEVE 18"-ULSD/GA-1120-BQ012
EL +555 DRG 1
X 75508
Y 56000
286 EL +757
8 9

202 PIPE DATA CUTTING LIST


18" PED Category: I
202 PIECE LENGHT [mm] SIZE SPEC
P&ID: 1628-DD1-ME17140-09-01-DG002
Design Temperature: <A> 18945 18" 1A
Operational Temperature: <B> 335 18" 1A
Design Pressure: 9 barg <C> 1335 18" 1A
Operational Pressure: 2.4 barg
<D> 686 18" 1A
Insulation: -
Heat Tracing: -
Test Fluid: Water
Test Pressure: 13.5 barg
Radiographic Testing: 10%

0 PDP GJA 29.04.2020.


Revision Opis promjene / Revision Description: Revidirao Odobrio Datum /Date:
Naziv projekta: IVICOM Consulting d.o.o.

Project title: M B 0 7 0 1 0 6 5 2 8
O IB 20 7 78 5 15 76 7
Investitor: Tel: +385 1 6286 602
Fax: +385 1 6608 602
Client: OIB: 18102992360 w ww .iv ico m - co n su lti n g.c o m

Projektant: Goran Javorek dipl.ing.str.


Construction:
Lokacija: Designed by:
General Notes: Plant coordinate system XYZ: Drawing Notes: Location:
- Y parallel to Design North Razina projekta: IZVEDBENI PROJEKT Vrsta projekta: STROJARSKI PROJEKT IZOMETRIJA CJEVOVODA
- the origin of Plant coordinate system XY is: N4766922.16; E575941.45 per HTRS96 Project type: DETAIL DESIGN Project part: MECHANICAL DESIGN Content: PIPING ISOMETRIC
Gl. projektant: Goran Javorek dipl.ing.str. Suradnik: Paolo Del Ponte, mag.ing.traff. 18"-ULSD/GA-1120-1A
FABRICATION WELD SOCKET THREADED COMPN PIPE INSULATED HEATED PIPE POSITION Main Designer: Associate:
WELD WELD JOINT JOINT SUPPORT PIPE PIPE SPOOL ZOP / Job No List br. / Sheet Format / Format Datum / Date Mjerilo / Scale Revizija / Rev Oznaka dokumenta: / Designation /Dwg No
<A> 1 1823-DD 2 /4 A3 04/2020 M- 0 1823-DD-ME-19218-11-01 DG-308
MATERIAL LIST - FABRICATION
N
PT. SIZE DESCRIPTION QTY
1 2 PIPE, CS, SCH 80 SMLS, ASTM A106 GR.B 1605 MM
2 2 90 LR ELBOW, CS, SCH 80 SMLS, ASTM A234 WPB, ASME B16.9 2
3 2 FLANGE, RFWN, 150LB, FS, ASTM A105, ASME B16.5 1

X 95148
Y 57777 7
EL +208 178

15
45

34

159
0
MATERIAL LIST - ERECTION
SL
OP
E PT. SIZE DESCRIPTION QTY
0.3
%
4 2 GASKET, 4.5mm, 150LB, SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED, 2
. AISI316, PER ANSI16.20
5 5/8 (4) STUD BOLTS, ALLOY STEEL, 150LB, ASTM A 193 GR.B7, WITH 2 1
SEMI-FINISHED HEAVY HEX NUTS ASTM A194 GR.2H
<B> 1 6 2 GATE VALVE, 150LB, RF, 1-GA-R-R-C 1
2" 7 2 BLIND FLANGE, FS, ASTM A105, ASME B16.5 1

2
14

13

CONT. FROM
DRG 2
X 94841 >
1 PIPE DATA CUTTING LIST
<A
Y 56000 PED Category: I
307 P&ID: 1628-DD1-ME17140-09-01-DG002
PIECE LENGHT [mm] SIZE SPEC
EL +288
76 Design Temperature: <A> 155 2" 1A
Operational Temperature:
2"

12
<B> 1450 2" 1A
Design Pressure: 9 barg
2 Operational Pressure: 2.4 barg
EL +212 Insulation: -
Heat Tracing: -
Test Fluid: Water
Test Pressure: 13.5 barg
Radiographic Testing: 10%

0 PDP GJA 29.04.2020.


Revision Opis promjene / Revision Description: Revidirao Odobrio Datum /Date:
Naziv projekta: IVICOM Consulting d.o.o.

Project title: M B 0 7 0 1 0 6 5 2 8
O IB 20 7 78 5 15 76 7
Investitor: Tel: +385 1 6286 602
Fax: +385 1 6608 602
Client: OIB: 18102992360 w ww .iv ico m - co n su lti n g.c o m

Projektant: Goran Javorek dipl.ing.str.


Construction:
Lokacija: Designed by:
General Notes: Plant coordinate system XYZ: Drawing Notes: Location:
- Y parallel to Design North Razina projekta: IZVEDBENI PROJEKT Vrsta projekta: STROJARSKI PROJEKT IZOMETRIJA CJEVOVODA
- the origin of Plant coordinate system XY is: N4766922.16; E575941.45 per HTRS96 Project type: DETAIL DESIGN Project part: MECHANICAL DESIGN Content: PIPING ISOMETRIC
Gl. projektant: Goran Javorek dipl.ing.str. Suradnik: Paolo Del Ponte, mag.ing.traff. 18"-ULSD/GA-1120-1A
FABRICATION WELD SOCKET THREADED COMPN PIPE INSULATED HEATED PIPE POSITION Main Designer: Associate:
WELD WELD JOINT JOINT SUPPORT PIPE PIPE SPOOL ZOP / Job No List br. / Sheet Format / Format Datum / Date Mjerilo / Scale Revizija / Rev Oznaka dokumenta: / Designation /Dwg No
<A> 1 1823-DD 3 /4 A3 04/2020 M- 0 1823-DD-ME-19218-11-01 DG-308
X 100333
MATERIAL LIST - FABRICATION
Y 56238
EL +1813 9
N
PT. SIZE DESCRIPTION QTY
8
1 18 PIPE, CS, STD ERW, API 5L GR.B, PSL 1 544 MM
35
2 18X16 TEE, REDUCING, CS, STD SMLS, ASTM A234 WPB, ASME B16.9 2
3 18 FLANGE, RFWN, 150LB, FS, ASTM A105, ASME B16.5 1
76 16 4 16 FLANGE, RFWN, 150LB, FS, ASTM A105, ASME B16.5 2
34
61

<C> 5
3/4"
120

33

7
32
19

X 100921
MATERIAL LIST - ERECTION
<B Y 56000
> PT. SIZE DESCRIPTION QTY
5
EL +1196
19
200 7 5 3/4 PIPE, CS, SCH 80 SMLS, ASTM A106 GR.B 399 MM
3 10 12
EL +1537 6 18X3/4 SOCKOLET, 3000LB, ASTM A105, MSS SP-97 1
31
14 7 3/4 90 ELBOW, SW 3000LB, ASTM A105, ASME B16.11 2
19 36
8 3/4 NIPPLE, CS, SCH 160 SMLS, T.O.E., ASTM A106 GR.B (THRD. AS PER 1
ASME B1.20.1) (76 MM LG)
9 3/4 CAP, SCREWED, 3000LB, ASTM A105, ASME B16.11 1
30
1 10 18 GASKET, 4.5mm, 150LB, SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED, 1
> AISI316, PER ANSI16.20
<D
11 16 GASKET, 4.5mm, 150LB, SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED, 1
19 AISI316, PER ANSI16.20
12 1.1/8 (16) STUD BOLTS, ALLOY STEEL, 150LB, ASTM A 193 GR.B7, WITH 2 1
79

18"-ULSD/GA-1120-BQ011 SEMI-FINISHED HEAVY HEX NUTS ASTM A194 GR.2H


13 1 (16) STUD BOLTS, ALLOY STEEL, 150LB, ASTM A 193 GR.B7, WITH 2 1
<A> 5

584
SEMI-FINISHED HEAVY HEX NUTS ASTM A194 GR.2H
243
14 18 BLIND FLANGE, FS, ASTM A105, ASME B16.5 1
15 16 BLIND FLANGE, FS, ASTM A105, ASME B16.5 1
16 3/4 GATE VALVE, 800LB, SW, 8-GA-Z-R 1
29 167

28 PIPE DATA CUTTING LIST


PED Category: I
X 99890 6
P&ID: 1628-DD1-ME17140-09-01-DG002
PIECE LENGHT [mm] SIZE SPEC
Y 56462 457 18X3/4"
Design Temperature: <A> 79 3/4" 1A
15 EL +1196 4 11 13
Operational Temperature: <B> 200 3/4" 1A
26 443 Design Pressure: 9 barg <C> 120 3/4" 1A
4
Operational Pressure: 2.4 barg
27 <D> 544 18" 1A
24
Insulation: -
CONT. FROM 25 Heat Tracing: -
DRG 2 686 2
Test Fluid: Water
X 98861 457 18X16"
Y 56000 18" Test Pressure: 13.5 barg
EL +1196 Radiographic Testing: 10%
23 343
CONT. ON 2
16"-ULSD-1284-1A 18X16"
X 99204
Y 56457
EL +1196

0 PDP GJA 29.04.2020.


Revision Opis promjene / Revision Description: Revidirao Odobrio Datum /Date:
Naziv projekta: IVICOM Consulting d.o.o.

Project title: M B 0 7 0 1 0 6 5 2 8
O IB 20 7 78 5 15 76 7
Investitor: Tel: +385 1 6286 602
Fax: +385 1 6608 602
Client: OIB: 18102992360 w ww .iv ico m - co n su lti n g.c o m

Projektant: Goran Javorek dipl.ing.str.


Construction:
Lokacija: Designed by:
General Notes: Plant coordinate system XYZ: Drawing Notes: Location:
- Y parallel to Design North Razina projekta: IZVEDBENI PROJEKT Vrsta projekta: STROJARSKI PROJEKT IZOMETRIJA CJEVOVODA
- the origin of Plant coordinate system XY is: N4766922.16; E575941.45 per HTRS96 Project type: DETAIL DESIGN Project part: MECHANICAL DESIGN Content: PIPING ISOMETRIC
Gl. projektant: Goran Javorek dipl.ing.str. Suradnik: Paolo Del Ponte, mag.ing.traff. 18"-ULSD/GA-1120-1A
FABRICATION WELD SOCKET THREADED COMPN PIPE INSULATED HEATED PIPE POSITION Main Designer: Associate:
WELD WELD JOINT JOINT SUPPORT PIPE PIPE SPOOL ZOP / Job No List br. / Sheet Format / Format Datum / Date Mjerilo / Scale Revizija / Rev Oznaka dokumenta: / Designation /Dwg No
<A> 1 1823-DD 4 /4 A3 04/2020 M- 0 1823-DD-ME-19218-11-01 DG-308