Professional Documents
Culture Documents
Premium Pent Workshop 3 X 1.8M: Pre Drill All Holes Before Screwing
Premium Pent Workshop 3 X 1.8M: Pre Drill All Holes Before Screwing
08
4 2
1
OMPWS318DP
1
OMPWS318FP
120
FIXING PACK
SANW6905703
41 4
door panel
37 6
30mm Nail
10mm Tack
70mm screw
31 100 24 7
1 2
25mm Screw Panel pin 35mm Screw
50mm screw
2x 57x12x2120mm
SMOMDRPTR
OMPS318FLS
(57122120PARPTR)
small door
floor
3x 57x12x1865mm
(571221865PARPTR) B (X35)
4x 57x12x665mm Place the OLWS318PP (plain panel) onto the
2 1 (57120665PARPTR) OLWS318FL (floor) and flush against the
STRIPS
LGOMDRPTR
large door
2x 80x12x1920mm
(80121920PARPTR) screws.
4x 80x12x1584mm
(80121584PTR) Repeat the procedure for the opposite side and
1 OLPWS318FL with the OLPWS318DP (door panel) and the
150100020PARPTR
WSOWFBI
window
1
2 OLPWS318RHSP
2
OMPWS108RFS
2x 15x12x1775mm
(15121775PTR)
roof
STRIPS
4x 15x12x573mm
(15120573PTR)
2
4x 15x12x669mm OLWS318WP
(15120669PTR)
OMPWS318RHSP
B
A
right hand side
(45281465PARSPTR) OLPWS318LHSP
1 battens are all running in the same OLWS318DP
1x 28x28x1770mm
direction.
(28281770PTR) C
B
When the frame of the building is complete and
OMPWS318WP
window panel
Sit a 57120655PARPTR
(sill) along the bottom of the (x 20)
(X 24)
window space, on the
57120761PARPTR
OMPWS318WP so that it is WS0WFBI
ss
(X 4)
(x 12)
45281465PARSPTR
F
Secure the casement stay
to the window assembly
using 2x25mm screws.
Making sure the window is
closed, mark the positions
for the casement pins and K
G
K
secure in place using Place the 45281465PARSPTR (drip strip)
Opening Window 2x25mm screws per pin. above the windows as shown. Make sure there
is clearance for the windows to open. Secure
Casement Stay Repeat this step for both by using 4x70mm screws taking care to screw
windows. into the batten on the reverse of the panel.
Casement Pins
Ins
ide
of
S he
d
(X 3)
(X 42)
(x 8)
I
SMOMDRPTR
Place the 28281770PTR (batten) against the end of the
SMOMDRPTR, on the inside so that it pushes up against the frame
work of the door. Secure in place by screwing through the (batten)
into the framework as shown, using 3x50mm screws.
LGOMDRPTR
Fix the tower bolt to the top and bottom of the (batten) using 4x25mm
28281770DTR
screws per bolt.
H Mark the position of the bolt on the top and bottom battens of the door
Fix three tee hinges to each of the doors frame and drill a recess for the bolt to locate.
(SMOMDRPTR) and (LGOMDRPTR). Screwing into the
battens of the door, using 4x25mm screws per hinge.
(X7) (x 2)
J
Attach the 150100020PARPTR (lock
block) to the (large door) screwing from
the outside using 2x35mm screws. Make
sure that the block is sat on the central
door batten and is positioned squarely.
Escution
Lock block
K
Rim Lock
Position the Rim Lock on the lock block, mark the position of the holes for
the spindle and the keyhole and the pre-drilled the holes. Make sure that
there is enough room for key to move easily.
Grub Screw Catch Plate
Secure the lock in place using 3x35m screws. Secure the handles to the
spindle using a Grub Screw for each.
Handle
Close the doors and Line up the catch plate and fix in place using 2x35mm
screws. Make sure that the catch plate is positioned so that it will hold the
door shut.
Spindle
On the outside of the door place the Escutions over the hole and secure in
place using 2x25mm screws.
(X15)
(x 28)
57121865PARDTR
(x 2)
M
Place the OMPWS108RFS (roof
sections) onto the shed as shown so
that they both sit on the framing of the
shed with equal overhang on the front
and back.
(x 26)
K
O
K
Place the 4x 80121584PARDTR
and the 2x 80121920PARDTR (barge
boards) against the end of the roof
sections as shown. Make sure that these
are flush and are square in the corners.
Secure all using 30mm nails
80121920PARPTR 80121584PARPTR
80121584PARDTR = 4x30mm nails
80121920PARDTR = 5x30mm nails
K
N
K
Unroll the 3x85065 an place over the top of
the shed as shown. Make sure that there is
sufficient overlap on all sides.
Secure the felt in place using the felt tacks
provided, spaced approximately 150mm
apart.