PT. KARYA LOGAM AGUNG Dokumen No. :


Steel Tower Fabrication & Construction Revisi No. : 00

Proyek : TOWER TEMPORARY


LIST MATERIAL CILEGON BARU SERANG
PT. SANGKAN JAYA
NO. CONTRACT :
TOWER TEMPORARY H=18M
TGL CONTRACT :
NO. QTY UNIT TOTAL LENGTH WEIGHT TOT
SECTION PROFIL GRADE KET
MARKING (Pcs) QTY QTY (mm) I Pcs WEIGHT

TT01 TOWER TEMPORARY 20 1 PLT 22 100 HS 20 774 14,17 283,40


TT02 TOWER TEMPORARY 2 1 PLT 16 80 HS 2 323 3,44 6,88
TT03 TOWER TEMPORARY 2 1 PLT 30 160 HS 2 256 10,22 20,44
TT04 TOWER TEMPORARY 1 1 PLT 30 800 HS 1 800 159,76 159,76
TT05 TOWER TEMPORARY 1 1 PLT 90 90 HS 1 260 17,52 17,52
TT06 TOWER TEMPORARY 2 1 PLT 30 70 HS 2 100 1,75 3,50
TT07 TOWER TEMPORARY 4 1 L 70 7 MS 4 254 1,99 7,96
TT08 TOWER TEMPORARY 4 1 L 70 7 MS 4 358 2,80 11,20
TT09 TOWER TEMPORARY 2 1 PLT 30 227 HS 2 279 15,81 31,62
TT10 TOWER TEMPORARY 4 1 L 70 7 MS 4 616 4,82 19,28
TT11 TOWER TEMPORARY 2 1 L 120 12 MS 2 450 10,36 20,72
TT12 TOWER TEMPORARY 2 1 L 120 12 MS 2 474 10,91 21,82
TT13 TOWER TEMPORARY 1 1 PLT 16 300 HS 1 300 11,98 11,98
TT14 TOWER TEMPORARY 72 1 L 40 4 MS 72 207 0,53 38,16
TT15 TOWER TEMPORARY 72 1 L 40 4 MS 72 207 0,53 38,16
TT16 TOWER TEMPORARY 36 1 L 120 12 MS 36 450 10,36 372,96
TT17 TOWER TEMPORARY 36 1 L 120 12 MS 36 474 10,91 392,76
TT18 TOWER TEMPORARY 18 1 L 70 7 MS 18 1.956 15,32 275,76
TT19 TOWER TEMPORARY 36 1 L 50 5 MS 36 532 2,13 76,68
TT20 TOWER TEMPORARY 108 1 L 50 5 MS 108 498 1,99 214,92
TT21 TOWER TEMPORARY 72 1 L 50 5 MS 72 500 2,00 144,00
TT22 TOWER TEMPORARY 18 1 L 70 7 MS 18 1.956 15,32 275,76
TT23 TOWER TEMPORARY 16 1 L 70 7 MS 16 456 3,57 57,12
TT24 TOWER TEMPORARY 16 1 L 120 12 MS 16 474 10,91 174,56
TT25 TOWER TEMPORARY 16 1 L 120 12 MS 16 450 10,36 165,76
TT26 TOWER TEMPORARY 4 1 UNP 100 50x6 MS 4 3.000 29,79 119,16
TT27 TOWER TEMPORARY 4 1 UNP 100 50x6 MS 4 3.000 29,79 119,16
TT28 TOWER TEMPORARY 4 1 PLT 12 123 MS 4 200 2,46 9,84
TT29 TOWER TEMPORARY 4 1 PLT 12 70 MS 4 120 0,84 3,36
579 3.094,20
BOLT TOWER TEMPORARY 144 1 M 20 70 H8.8 144 0,42 60,48
BOLT TOWER TEMPORARY 12 1 M 20 75 H8.8 12 0,43 5,16
BOLT TOWER TEMPORARY 144 1 M 20 65 H8.8 144 0,40 57,60
BOLT TOWER TEMPORARY 224 1 M 20 55 H8.8 224 0,38 85,12
BOLT TOWER TEMPORARY 4 1 M 16 45 H8.8 4 0,16 0,64
BOLT TOWER TEMPORARY 1 1 M 38 200 H8.8 1 2,50 2,50
BOLT TOWER TEMPORARY 1 1 M 30 200 H8.8 1 1,50 1,50
530 213,00
TOWER TEMPORARY Total 1109 3.307,20
Grand Total 1109 3.307,20