P E C L I: Rocess Ngineering Ourse - Ecture
P E C L I: Rocess Ngineering Ourse - Ecture
(Overview of Course)
Today’s Agenda
Introduction Industry Overview &Work Cycle
Contents
03. Block Flow Diagram
Process Flow Diagram
Lors been.
Loras been.
05. H&MB
P&ID (Basic)
.
09 Utility Summary
Effluent Summary
simply dummy text of the printing and typesetting industry. Lorem Ipsum has been.
Feasibility
Client Study
PMC
EPC
Licensor FEED (Front
(Engineering
(Technology) End Commissioning
Procurement
FEED Engineering and Start-up
and
Package Design)
Construction)
Vendor
Responsibly of Client
u To Provide all Details about Feedstock Details (Properties, flow rate etc)
u Product Requirement based on Market Demand
u Export location and Details & way of Export
u Site Information (Climate Conditions, Earthquake Zone, Wind conditions =>
All these information will be gathered in BEDD)
u Utility Design Information (Available with Client)
u Design Life
Responsibility of Feasibility Work Contractor
u Selected By Client
u Visit Feedstock location and gather flowrate, properties and other
information of Feedstock
u Collect all Site information and Prepare Basic Engineering Design Data
(BEDD)
u Prepared BFD, PFD, Process Description , HMB, Equipment List, Utility
Summary, Effluent Summary, Plot Plan and Equipment Layout etc
u Identify Recommended Licensor name and general flow scheme
u Rough Cost Estimation of the Project (+/- 30%)
Responsibility of PMC Contractor
2
7