This document outlines several requested changes and issues with an ongoing construction project. It notes that teak doors should be installed for all main doors, door hardware needs quality improvements, and the lift/elevator was only constructed to the third floor instead of as agreed to the second floor. Additional requests include completing shutters, painting, replacing damaged flooring, installing designed gates, and adding balconies and safety rods.
This document outlines several requested changes and issues with an ongoing construction project. It notes that teak doors should be installed for all main doors, door hardware needs quality improvements, and the lift/elevator was only constructed to the third floor instead of as agreed to the second floor. Additional requests include completing shutters, painting, replacing damaged flooring, installing designed gates, and adding balconies and safety rods.
This document outlines several requested changes and issues with an ongoing construction project. It notes that teak doors should be installed for all main doors, door hardware needs quality improvements, and the lift/elevator was only constructed to the third floor instead of as agreed to the second floor. Additional requests include completing shutters, painting, replacing damaged flooring, installing designed gates, and adding balconies and safety rods.
This document outlines several requested changes and issues with an ongoing construction project. It notes that teak doors should be installed for all main doors, door hardware needs quality improvements, and the lift/elevator was only constructed to the third floor instead of as agreed to the second floor. Additional requests include completing shutters, painting, replacing damaged flooring, installing designed gates, and adding balconies and safety rods.
Lift as per agrees should make construction facilitates till 2nd floor initially, as we are constructing 2nd floor from them itself the condition 2nd floor should be till 3rd floor. But now not providing this way (closed this in 3rd floor) even lift providers suggested the same as what we are asking for. Delay in shutters handover / Outside of shutters work pending step down (started 2 days back) Painting (It started on 3rd Jul 2020) Change flooring marbles / granite wherever got damaged due to other works. Placing marbles on gate front side (slope) – Same like in the pic provided for gate designs Not placed the same design gate (like what we chosen) … Actual placed gate is different than the image what they showed (size of bars & placing small ball type part btw bars etc…) Placing marble / granite for 2nd floor balcony (they have placed for all outer windows) – Not placing at the balcony window instead if they place here it will follow the uniformity. Placing supportive / safety rod for the same 2nd floor balcony (same what they will place for steps & front side balconies).