BAB 1 - Apendix Siap Gabung
BAB 1 - Apendix Siap Gabung
INTRODUCTION
Internship session for students is to inform reader the main point of the
report and the introduction of the jobs that have been given. This industrial
knowledge and technical skill. It helps students able to adapt fastest into
course, the total period of industrial training for this year is 20 weeks which
(M) Sdn. Bhd located at Bayan Lepas, Pulau Pinang. The position given is
Cheng is a Senior Engineer for Process Engineering. The major task given
1
1.2 Objective of industrial training
The main purpose of industrial training was to provide guidance and new
world later. Students should always comply the regulations set by the
the company.
qualities.
vii. Planting work and practice rules and a good work ethic.
2
1.3 Objective of industrial training report
Industrial training report is for documenting the activities and the student
Hence, it can also be used as a reference for other students who will
requirements for the graduation in the semester that occupied the entire
working environment, the students are also able to understand more about
superiors can see and evaluate student abilities and focus fully on all the
knowledge that they had poured over the industrial training in their
companies.
3
1.4 Importance of industrial training
adhere to all instructions given. Students can make the industrial training
This exposure not only provide more time for students to gain knowledge
and experience in the workplace, or even hang out and get to know the
market.
With the advent of industrial training, the students are able to broaden
the mind and be more open and mature in finding their own initiative to
solve a problem that may exist without seeking help from others.
and accurately.
Thus, industrial training indirectly build and transform the personality and
image of being a student with high confidence and efficient in meeting the
needs of the industry while improving the living standards of the local
community.
4
CHAPTER 2
ORGANIZATION BACKGROUND
The purpose for this chapter is to show that reader will understand the
Knowles has manufactured in Asia since 1974, with world class facilities
market. For example, Knowles has supplies wide range of products in the
5
Manufacturing facilities of Knowles corporate are used ISO -9001
order to ensure the cost effective on time delivery and meet the customer
needs.
electronic has spinning off from Dover and establish as an individual part
quality analysis labs, research and development labs and more. Below are
6
Figure 2.1 Knowles Electronic’s location
traded company.
bandwidth.
system) microphone.
2013 – Launches the most powerful high power micro speaker, Cobra TM ,
7
2012 – Ships three billionth SiSonic TM MEMS microphone.
with N’BassTM.
phone designs.
series.
technology platform.
8
1994 – Introduces acoustic devices for global electronic business.
1994 – Presents world's flattest dynamic speaker design for cell phones.
telecom market.
Northwestern University.
sets.
1954 – Develops first miniature microphone and receiver for hearing aids.
9
2.3 KNOWLES ELECTRONICS Activities
10
ii. Sound pressure level (SPL) output typically between 125dB and
130dB
ii. Sound pressure level (SPL) output typically between 120dB and
125dB
products.
ii. Visible to the eye, but less conspicuous than BTE instruments
11
i. Assist people with mild to moderate hearing losses
120dB
environments.
12
Knowles offers reliable and advanced audio metric instrumentation
components.
13
a Green Materials Policy. The products Knowles offers are in
SS-00259.
14
2.3.2 Types of product
15
Figure 2.9 Types of product
all the products if customers have special qualification test and they
16
2.3.5 Process flow
such as die bond IC, die bond MEMS, wire bond, dispense solder,
After the final product produce from the assembly, Knowles will
carry out the final test process to test the entire product to ensure
the product beyond quality. If the products fail the final test process,
only enter the process of packing and place in the store. Finally, the
17
2.4 KNOWLES ELECTRONICS Vision and Mission
18
2.5 Organization Chart
KEM 1, KEM 2, and KEM 3. Regional quality director, Sr. SCM manager,
19
2.5.2 KEM3 Process Engineering Organization Chart
Manager.
20
CHAPTER 3
5.1 Introduction
the book of reflection journal will briefly described in chapter covers the
recorded in the book of daily reports. Therefore, this section will explain
one semester of twenty weeks. All activities will be explained from week to
week so can conclude the work that has been done in a week set aside to
facilitate the review process. Day work week is not necessarily the same
every week because there are public holidays and public holidays
practice what they have learned at the university, I have also been
exposed to the rules and ethics of the company and it should be practiced
21
every Friday factories doing work (prevention maintenance) it means
In industrial training, I have given time for 8 hours and 30 minutes a day,
Thermome
Get introduce to Supervisor – KM Cheng, ter
Process Engineer
22
solder may help in used of the product. For
syringe
Tear down process – monitoring the surface
23
high power scope.
Tweezer
High
power
scope
power scope
Solder
splash
Help supervisor collected data (solder
Weighting
tool
24
5&6
Measure the syringe temperature - The
syringe
Tear down process – monitoring the surface
Tweezer
High
power
scope
25
Bubble rate inspection – inspect whether the was
Solder
Explore minitab tool splash
excel
Bubble
rate
inspection
7&8
Measure the syringe temperature - The
syringe
Tear down process – monitoring the surface
26
Tweezer
High
power
scope
weight monitoring)
Weighting
tool
9 & 10
Measure the syringe temperature - The
syringe
Tear down process – monitoring the surface
27
while used. The solder splash located around the
Jig
Tweezer
High
power
scope
resistance on unit.
Weighting
tool
28
Solder
dispense
machine
Multimeter
11 & 12
Measure the syringe temperature - The
syringe
Tear down process – monitoring the surface
29
Key in collected data of syringe temperature into
excel
Tweezer
High
power
scope
tool.
Solder
dispense
machine
Multimeter
30
13 & 14
Measure the syringe temperature - The
syringe
Tear down process – monitoring the surface
Tweezer
Solder
dispense
machine
31
Measurement-Measure solder height and
15 & 16
Measure the syringe temperature - The
syringe
Do multimeter plotting to identify electrical
32
Tweezer
17 & 18
Measure the syringe temperature - The
syringe
Do multimeter plotting to identify electrical
tool.
Multimeter
Weighting
tool
33
Perform KGM test for several job to find certain
failures units.
Solder
dispense
Update report and slide for every week
machine
KGM
tester
19 & 20
Perform KGM test for several job to find certain
failures units.
KGM
tester
Do multimeter plotting after KGM test to
AOI maccine.
syringe
Solder
CHAPTER 4
REFLOW PROCESS
9.1 Introduction
Reflow process is a process to melt the solder and heat the adjoining
the conventional reflow soldering process, there are usually four stages,
called “zones”, which are preheat, thermal soak, reflow and cooling.
35
The equipment used is :
i. Reflow machine
36
4.2.2 Reflow oven
i. Put the PCB board on the reflow jig in the correct position.
iii. Make sure the correct profiled is used for each different model.
37
4.4.1 Type of working process
how fast the temperature on the printed circuit board changes. The
between 1.0 oC and 3.0 oCper second, often falling between 2.0 oC
and 3.0 oC per second. If the rate exceeds the maximum slope,
incomplete.
38
9.4.2 Thermal soak zone
The third section is also referred as the “time above reflow “ and is
39
9.4.4 Cooling zone
ignored. It may be that the ramp rate is less critical above certain
usually with larger ovens, some of edge conveyor system, often with a
conveyor, for example, has pins protruding from the sides of the chain to
provides an edge support that carries the board through the reflow system
conveyor has lateral warpage of greater than this amount, the product will
41
CHAPTER 5
SYRINGE MEASUREMENT
5.1 Introduction
Frequency of this monitoring is two times every day for three weeks at all 3
42
5.2.1 Infrared thermometer
43
5.2.2 Empty syringe
ii. Use the empty syringe to measure the solder level (put the empty
iv. Explanation are given from trainer how to measure the solder.
i. Measurement taken must be the 2nd board and above after the machine
44
iv. Measure the solder then followed by speed and pressure.
v. Measure at three points, above piston, ½ inch below piston and 1 inch
45
5.4.2 ½ inch below piston
46
Is the laser pointer of the infrared thermometer.
CHAPTER 6
11.1 Introduction
47
4 5
1
6
Machine Parts
1. Input elevator loading table
2. Left epoxy controller
3. Right epoxy controller
4. Monitor
5. Output elevator loading table
6. Mouse controller
7. Keyboard
8. EMO
All metal can board direction. Board two holes and undercut
48
Figure 6.3.1.1
Dispenser operation :
iii. Put magazine on the Input elevator, ensure PCB in bottom area
of magazine.
alignment.
49
vi. Learn Z for dispense solder. Access to set up – Process set up
vii. Back to main table and confirm that Output elevator buttons
Wafer PR, confirm that hole location on top if can have hole.
Up-look PR, confirm that hole location on top if can have hole.
Post bond PR, confirm that image created without solder and position
of the PCB.
Map” bottom.
Select left three column and right three column to enable, then run
the machine.
50
100% inspection under minimum 10x microscope, no rotation, ring is
6.4.1.1
Procedures) required.
idle 6 hours.
change.
51
v. Dispensing adaptor must be changed after needle
removal by operator.
6.4.4 Solder
ii. Collect rest can in bowl and pack them in the bag
52
6.4.5.1 Metal can track
ii. Once needle clog / needle broken / needle scratch PCB or find
53
CHAPTER 7
7.1 INTRODUCTION
Sisonic microphone is in batch process, a batch of ten PCB board and one
54
i. FR4 Strip Attach
Before After
Plasma clean the wire bond PCB pad to remove any possible
Before After
55
iii. Die Bond
Die mount IC, MEMS. Place and attach the IC and MEMS onto the PCB.
Before After
iv. Curing
56
Oven
v. Wire Bond
Attach and bond the wires from MEMS to IC and to PCB pad per the wire
vi. Encapsulate
57
Encapsulation process Before After
vii. Curing
Oven
58
Solder dispense process Before After
x. Reflow solder
59
Reflow machine Before After
Mount the tape on the PCB to secure the units during the dicing process
60
Tape mount process Before After
xiii. Dice
xiv. UV Cure
61
UV cure process Before After
xvi. Tape-n-reel
62
Tape-n-reel machine Before After
xvii. Warehouse
63
CHAPTER 8
CONCLUSION
8.1 Conclusion
Working with Knowles Electronic (M) Sdn. Bhd. is one of opportunity to learned
For a four and half months training period, a new knowledge were exposed. For
example, even from mechatronic course, student also can learn the system in the
production where the function of each machines and how it is work. To gain the
technician and engineer, new things were gain. With helping from other engineer
also can help in working. Getting information, collecting data and analysis the
data is one of routine task since internship period started. With own effort,
and technician) needs to be applied. In this company, mostly they used English as
applied still the same. The Knowles Company also applied Lean manufacturing
system.
64
CHAPTER 9
9.1 Suggestion
need to extend internship period at least six months. It is because for that period,
more tasks can be given and can study more about machines. For the tasks
given, it is success made student understood about the works. Even not fully
enough the whole process was understood, but at least tasks given is success
finished.
65
REFERENCE
Resources Website
1. www.knowles.com
2. Knowles Intranet
3. Kem3 filesharing
Resources Human
66
APPENDIX
10.1 AD838L
67
10.3 Encap Machine
68
10.5 Pick & Place Machine
69
10.7 Cartridge
10.8 DJ9500
70
10.9 Microphone
71
10.11 Gold Wire
10.12 Tweeezers
72
10.13 Syringe
73
10.15 Infrared Thermometer
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90
91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150
151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180
181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210
211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240
241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270
271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300
301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330
331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360
361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390
391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420
421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450
451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480
481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510
511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540
541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570
571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600
74
10.17 Metal Can Track
75