GOVERNMENT OF RAJASTHAN

Name Of Work: Development And Maintenance of Losal Salasar- Ratangarh section of SH-07 & SH-92 Excluding overlapping of SH-20 from Nechhwa to Salasar, Total Length of 78.603 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.
Authority Public Works Department (PPP), PIU-Laxmangarh (Sikar)
Authority Engineer Theme Engineering Services Private Limited
Name of EPC Contractor M/S Rajendra Singh Bhamboo Infra Private Limited
Status of Quality Control Test Results Conducted - Interim Payment Cerificate (IPC)-02
Witness
Quantity Executed No. Of Test Required No. Of Test Conducted Total upto date Witness (Authority)
Sr. No Name of Test Testing Method Frequency of Test Specification (Authority Enggineer)
Up to Prev. This Bill Total Up to Prev. This bill Total Up to Prev. This bill Total Passed Failed Required Conducted Required Conducted
1) SUB-GRADE
1 Atterberge`s Limit IS: 2720 Part-5 Max. LL= 50 % PI +25% 0 88 88 0 120 120 120 0 24 38 2 2
2 Sieve Analiysis IS: 2720 Part-4 2 Test per 3000 Cum as required 0 88 88 0 120 120 120 0 24 38 2 2
135315 Cum 0 135315 Cum
3 Proctor Test IS: 2720 Part-8 as required 0 88 88 0 120 120 120 0 24 38 2 2
4 CBR IS: 2720 Part-16 1 Test per 3000 Cum as required 0 15 15 0 18 18 18 0 4 4 1 1
5 Field Density IS: 2720 Part-28 1 Set 2000 Sqm Min. Compaction 97 % 270630 Sqm 0 270630 Sqm 0 1316 1316 0 2142 2142 2140 10 425 486 22 24
2) GRANULAR SUB BASE
1 Atterberge`s Limit IS: 2720 Part-5 1 Test per 400 Cum Max. LL= 25 % PI 6% 0 84 84 0 104 104 104 0 21 25 2 2
2 Sieve Analiysis IS: 2386 Part-1 1 Test per 400 Cum MORT&H sec.400 Table-1 0 84 84 0 104 104 104 6 21 26 2 2
36795 Cum 13332 Cum 50127 Cum
3 Proctor Test IS: 2720 Part-8 as required as required 0 3 3 0 3 3 3 0 3 3
4 CBR IS: 2720 Part-16 as required Min. 30% 0 3 3 0 3 3 3 0 3 3
5 AIV IS: 2720 Part-2 1 Test per 1000 Cum as required 0 34 34 0 40 40 40 0 8 16 1 1
183975 Sqm 66660 Sqm 250635 Sqm
6 Field Density IS: 2720 Part-28 1 set per 1000 sqm Min. Compaction 98 % 0 502 502 0 580 580 580 4 116 140 6 7
3)WET MIX MACADAM (WMM)
1 Gradation IS: 2386 Part-1 1 Test per 200Cum MORT&H sec.400-13 0 37 37 0 41 41 41 0 9 15 1 1
2 AIV IS:2386 part-4 1 Test per 1000 Cum 30 % Max. 0 8 8 0 35 35 35 0 2 21 1 1
7222 Cum 8766 Cum 15987 Cum
3 FI&EI IS:2386 part-1 1 Test per 500 Cum 35 % Max. 0 16 16 0 35 35 35 0 4 21 1 1
4 Atterberge`s Limit IS: 2720 Part-5 1 Test per 200Cum Max. LL= 25 % PI 6% 0 37 37 0 41 41 41 0 9 18 1 1
1 set of Three test per
6 Field Density IS: 2720 Part-28 1000 sqm 48144 Sqm 58436 Sqm 106580 Sqm 0 146 146 0 222 222 222 0 45 72 3
1000sqm 3
4) PRIME COAT /TACK COAT
1 Prime Coat MORT&H sec.900-3 3 Test per day 0.7kg-1.0kg/sqm 30870 Sqm 90489 Sqm 121359 Sqm 0 30 30 0 30 30 30 0 6 10 1 1
2 Tack Coat MORT&H sec.900-3 3Test per day 0.25kg-0.30kg /sqm 30870 Sqm 90489 Sqm 121359 Sqm 0 27 27 0 27 27 27 0 6 9 1 1
5) DBM
1test per 400 Tonnes
1 Gradation Dry mix IS 2386 PART -1
(2 Test per day/plant
MORT&H sec.900-3 0 18 18 0 18 18 18 0 4 12 1
1
2 FI & EI 1 Test per 350cum MORT&H sec.900-3 0 6 6 0 9 9 9 0 2 5 1 1
1test per 400 Tonnes
3 Binder content % ASTM D 2172
(2 Test per day/plant)
MORT&H sec.900-3 1543.5 Cum 4525 Cum 6068.5 Cum 0 18 18 0 18 18 18 0 4 14 1
1
4 AIV IS:2386 part-4 1 Test per 350cum 27 % Max. 0 6 6 0 9 9 9 0 2 5 1 1
1test per 400 Tonnes
6 Marshal Stability AASTHO T 245
(2 Test per plant)
Min. Stability 9.00kn 0 18 18 0 18 18 18 0 4 14 1
1
Density of Compacted
7
layer
AASTHO T 166 1 test per 700 sqm Area 30870 Sqm 90489 Sqm 121359 Sqm 0 46 46 0 76 76 76 0 16 21 1
1

EPC Contractor Authority Engineer Authority