Development And Maintenance of Losal Salasar- Ratangarh section of SH-07 & SH-92 Excluding overlapping of SH-20 from

Nechhwa to Salasar, Total Length of 78.603 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC)
Mode.
Authority:- CONTRACTOR:- INDEPENDENT ENGINEER:-
M/S Rajendra Singh Theme Engineering
Goverment Of Rajasthan, PWD Bhamboo Infra Private Limited Services Private Limited
(MoRTH,GoI)

CALIBRATION OF HOT MIX PLANT

Plant make: ATLAS ABS-160 Date of Calibration 6/1/2020

Location : 30 +700 R/S Next Calibration Dat 8/30/2020

Max. capacity: 160 Tph

Digital thermo meter

Range : 50oC to 300oC


Thermo couple No.1(Near aggregate drier)
trail 1 trail 2 trail 3

169 172 173


Actual reading by Digital thermo meter ( oC)
Display reading on pannel board(oC)
167 170 171

Thermo couple No.2(Near Hot bins)


trail 1 trail 2 trail 3

Actual reading by Digital thermo meter


166 175 168
(oC)

Display reading on pannel board( oC) 164 173 167

Thermo couple No.1(Near Bitumen pump line)


trail 1 trail 2 trail 3

Actual reading by Digital thermo meter


162 164 172
(oC)

Display reading on pannel board( oC) 160 162 170

EPC Contractor Rep. Authority/Authority's Engineer


EPC Contractor Rep. Authority/Authority's Engineer
Development And Maintenance of Losal Salasar- Ratangarh section of SH-07 & SH-92 Excluding overlapping of SH-20 from Nechhwa to
Salasar, Total Length of 78.603 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.

Authority CONTRACTOR: - INDEPENDENT


M/S Rajendra Singh Bhamboo ENGINEER: -
Theme Engineering
Goverment Of Rajasthan, PWD (MoRTH,GoI) Infra Private Limited Services Private
Limited

CALIBRATION OF HOT MIX PLANT

Plant Make ATLAS ABS-160 Date of Calibration : 6/1/2020


Location 30 +700 R/S Next Calibration Date: 8/30/2020
Capacity 160 Tph
Type of Material Aggregates

Actual Load Loading Display in Unloading


Average in Kg Variation % of Variation
Applied in (Kg) (kg) Display in (Kg)
0.0 0.0 0.0 0.0 0.0 0.0
50 50 50 50.0 0.0 0.0
100 100 100 100.0 0.0 0.0
150 150 150 150.0 0.0 0.0
200 200 200 200.0 0.0 0.0
250 250 250 250.0 0.0 0.0
300 302 301 301.5 1.5 0.5
350 350 350 350.0 0.0 0.0
400 402 402 402.0 2.0 0.5
450 450 450 450.0 0.0 0.0
500 500 502 501.0 1.0 0.2
520 522 522 522.0 2.0 0.4
540 542 542 542.0 2.0 0.4
560 562 562 562.0 2.0 0.4
580 582 582 582.0 2.0 0.3
600 602 602 602.0 2.0 0.3
620 622 622 622.0 2.0 0.3
640 641 642 641.5 1.5 0.2
660 660 660 660.0 0.0 0.0
680 682 682 682.0 2.0 0.3
700 700 701 700.5 0.5 0.1
720 720 720 720.0 0.0 0.0
740 743 742 742.5 2.5 0.3
760 762 762 762.0 2.0 0.3
780 782 782 782.0 2.0 0.3
800 802 802 802.0 2.0 0.3
820 822 822 822.0 2.0 0.2
840 842 842 842.0 2.0 0.2
860 862 862 862.0 2.0 0.2
880 882 882 882.0 2.0 0.2
900 904 904 904.0 4.0 0.4
920 922 922 922.0 2.0 0.2
940 944 944 944.0 4.0 0.4
960 962 962 962.0 2.0 0.2
980 984 984 984.0 4.0 0.4
1000 1004 1004 1004.0 4.0 0.4
1020 1024 1024 1024.0 4.0 0.4
1040 1044 1044 1044.0 4.0 0.4
1060 1064 1064 1064.0 4.0 0.4
1080 1084 1084 1084.0 4.0 0.4
1100 1104 1104 1104.0 4.0 0.4
1120 1124 1124 1124.0 4.0 0.4
1140 1144 1144 1144.0 4.0 0.4
1160 1164 1164 1164.0 4.0 0.3
1180 1184 1184 1184.0 4.0 0.3
1200 1204 1204 1204.0 4.0 0.3
1220 1224 1224 1224.0 4.0 0.3
Actual Load Loading Display in Unloading
Average in Kg Variation % of Variation
Applied in (Kg) (kg) Display in (Kg)
1240 1244 1244 1244.0 4.0 0.3
1260 1264 1264 1264.0 4.0 0.3
1280 1284 1284 1284.0 4.0 0.3
1300 1304 1304 1304.0 4.0 0.3
1320 1324 1324 1324.0 4.0 0.3
1340 1344 1344 1344.0 4.0 0.3
1360 1364 1364 1364.0 4.0 0.3
1380 1384 1384 1384.0 4.0 0.3
1400 1404 1404 1404.0 4.0 0.3
1420 1420 1422 1421.0 1.0 0.1
1440 1445 1444 1444.5 4.5 0.3
1460 1466 1466 1466.0 6.0 0.4
1480 1486 1486 1486.0 6.0 0.4
1500 1506 1506 1506.0 6.0 0.4
1520 1525 1524 1524.5 4.5 0.3
1540 1546 1546 1546.0 6.0 0.4
1560 1566 1566 1566.0 6.0 0.4
1580 1584 1584 1584.0 4.0 0.3
1600 1604 1604 1604.0 4.0 0.3

18

16
f(x) = 1.00357805336657 x − 0.521820576201526
R² = 0.999994669009034

14

12

10

800.0

600.0

400.0

200.0

0.0
0.0 200.0 400.0 600.0 800.0 10 12 14 16 18

Remarks:-

EPC Contractor Rep. Authority/Authority's Engineer


Development And Maintenance of Losal Salasar- Ratangarh section of SH-07 & SH-92 Excluding overlapping of SH-20 from Nechhwa to
Salasar, Total Length of 78.603 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.

Authority CONTRACTOR: - INDEPENDENT ENGINEER: -


M/S Rajendra Singh Bhamboo Infra Theme Engineering
Services Private Limited
Goverment Of Rajasthan, PWD (MoRTH,GoI) Private Limited

CALIBRATION OF HOT MIX PLANT

Plant Make ATLAS ABS-160 Date of Calibration : 6/1/2020


Location 30 +700 R/S Next Calibration Date: 8/30/2020
Capacity 160 Tph
Type of Material Bitumen

Actual Load Loading Display Unloading


Average in Kg Variation % of Variation
Applied in (Kg) in (kg) Display in (Kg)
0.0 0.0 0.0 0.0 0.0 0.00
10.0 10.0 10.0 10.0 0.0 0.00
20.0 20.0 20.0 20.0 0.0 0.00
30.0 30.0 30.0 30.0 0.0 0.00
40.0 40.0 40.0 40.0 0.0 0.00
50.0 50.0 50.0 50.0 0.0 0.00
60.0 60.0 60.0 60.0 0.0 0.00
70.0 70.0 70.0 70.0 0.0 0.00
80.0 80.0 80.0 80.0 0.0 0.00
90.0 90.0 90.0 90.0 0.0 0.00
100.0 100.0 100.0 100.0 0.0 0.00

120.0

100.0
f(x) = x
R² = 1

80.0

60.0 Load Display in (Kg)


Unloading Display in (Kg)
Linear (Unloading Display in (Kg))

40.0

20.0

0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0

Remarks:-

EPC Contractor Rep. Authority/Authority's Engineer


Development And Maintenance of Losal Salasar- Ratangarh section of SH-07 & SH-92 Excluding overlapping of SH-20 from Nechhwa to Salasar, Total
Length of 78.603 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.

Authority CONTRACTOR: - M/S INDEPENDENT ENGINEER: - Theme


Rajendra Singh Bhamboo Infra Private Limited Engineering Services Private Limited
Goverment Of Rajasthan, PWD (MoRTH,GoI)

CALIBRATION OF HOT MIX PLANT

Plant Make ATLAS ABS-160 Date of Calibration: 6/1/2020


Location 30 +700 R/S Next Calibration Date: 8/30/2020
Capacity 160 Tph
Type of Material Filler

Actual Load Applied in Unloading Display in Average in


Loading Display in (kg) variation % of Variation
(Kg) (Kg) (Kg)

0.0 0.0 0.0 0.0 0.0 0.0


10.0 10.0 10.0 10.0 0.0 0.00
20.0 20.0 20.0 20.0 0.0 0.00
30.0 30.0 30.0 30.0 0.0 0.00
40.0 40.0 40.0 40.0 0.0 0.00
50.0 50.0 50.0 50.0 0.0 0.00
60.0 60.0 60.0 60.0 0.0 0.00
70.0 70.0 70.0 70.0 0.0 0.00
80.0 80.0 80.0 80.0 0.0 0.00
90.0 90.0 90.0 90.0 0.0 0.00

100.0 100.0 100.0 100.0 0.0 0.00

120.0

100.0

80.0
Load displayed

60.0 Load Applied (kg)


Linear (Load Applied (kg))
Load Applied (kg)
40.0 Linear (Load Applied (kg))

20.0

0.0
0.0 20.0 40.0 60.0 80.0 100.0 120.0
Load applied
Remarks:-