Professional Documents
Culture Documents
FL-02-04 PM Sheet
FL-02-04 PM Sheet
FL-02-04 PM Sheet
No NRV
Note: NRV's and isolation valve direction is as per P & Id.
(D) Blind,spacer,spectacle blind checklist Test pack no: FL-02-04
Up stream Gasket Downstream gasket
Sr.No Blind no. Size MOC Type Remarks
MOC Rating MOC Rating
1 B06/150 2" O/SPECTACLE
2 B08/150 2" END BLIND
2 93/043 1" O/SPECTACLE
3 94/043 1" END BLIND
4 99/043 1" O/SPECTACLE
5 98/043 1" END BLIND
6 101/043 1" O/SPECTACLE
7 100/043 1" END BLIND
8 115/043 1" O/SPECTACLE
9 114/043 1" END BLIND
10 117/043 1" C/SPECTACLE
11 116/043 1" END BLIND
12 007/044 1" C/SPECTACLE
13 008/044 1" END BLIND
14 009/044 1" C/SPECTACLE
15 011/044 1" END BLIND
16 012/044 1" C/SPECTACLE
17 013/044 1" END BLIND
18 014/044 1" C/SPECTACLE
19 015/044 1" END BLIND
20 016/044 1" C/SPECTACLE
21 017/044 1" END BLIND
22 019/044 1" C/SPECTACLE
23 020/044 1" END BLIND
24 025/044 1" C/SPECTACLE
25 024/044 1" END BLIND
26 026/044 1" C/SPECTACLE
27 027/044 1" END BLIND
(E) Control valve / XV checklist: Test Pack No:FL-02-04
Tag No Fail position Size MOC Direction Leack test Mechanical Stok check Remarks
Sr.No Hydrotest Applicable Y/N of Bonet / check
Gland
No Control valve
(F) Orifice plate Checklist: Test pack No:FL-02-04
Gasket
Mechanical Drain instrument Loop
Sr.No Tag No Size Upstream Downstream Orientation
check Hole check
Remarks
No orifice
(G) PSV checklist: Test pack No:FL-02-04
No PSV
Remarks
(H) Field instrument check list Test pack no:FL-02-04
Sr.No. Tag No. PT/TT/PG/TG/FT/LT/AT Discription Instrument check Range MOC Leack Test Box up Remarks
No Instrument