Professional Documents
Culture Documents
FL-02-09 PM Sheet
FL-02-09 PM Sheet
FL-02-09 PM Sheet
No NRV
Note: NRV's and isolation valve direction is as per P & Id.
(D) Blind,spacer,spectacle blind checklist Test pack no: FL-02-09
Up stream Gasket Downstream gasket
Sr.No Blind no. Size MOC Type Remarks
MOC Rating MOC Rating
1 B05/151 2" END BLIND
2 B08/151 2" O/SPECTACLE
3 93/059 1" O/SPECTACLE
4 94/059 1" END BLIND
5 99/059 1" O/SPECTACLE
6 98/059 1" END BLIND
7 101/059 1" O/SPECTACLE
8 100/059 1" END BLIND
9 115/059 1" O/SPECTACLE
10 114/059 1" END BLIND
11 117/059 1" C/SPECTACLE
12 116/059 1" END BLIND
13 007/060 1" C/SPECTACLE
14 008/060 1" END BLIND
15 009/060 1" C/SPECTACLE
16 011/060 1" END BLIND
17 012/060 1" C/SPECTACLE
18 013/060 1" END BLIND
19 014/060 1" C/SPECTACLE
20 015/060 1" END BLIND
21 016/060 1" C/SPECTACLE
22 017/060 1" END BLIND
23 019/060 1" C/SPECTACLE
24 020/060 1" END BLIND
25 025/060 1" C/SPECTACLE
26 024/060 1" END BLIND
27 026/060 1" C/SPECTACLE
28 027/060 1" END BLIND
(E) Control valve / XV checklist: Test Pack No:FL-02-09
Tag No Fail position Size MOC Direction Leack test Mechanical Stok check Remarks
Sr.No Hydrotest Applicable Y/N of Bonet / check
Gland
No Control valve
(F) Orifice plate Checklist: Test pack No:FL-02-09
Gasket
Mechanical Drain instrument Loop
Sr.No Tag No Size Upstream Downstream Orientation
check Hole check
Remarks
No Orifice
(G) PSV checklist: Test pack No:FL-02-09
No PSV
Remarks
(H) Field instrument check list Test pack no:FL-02-09
Sr.No. Tag No. PT/TT/PG/TG/FT/LT/AT Discription Instrument check Range MOC Leack Test Box up Remarks
No Instrument