Professional Documents
Culture Documents
(Electronic Maintenance of Rural Roads Under PMGSY) Faqs: Emarg
(Electronic Maintenance of Rural Roads Under PMGSY) Faqs: Emarg
It stands for Defect Liability Period. It is 5 years maintenance of the road to be carried by the contractor who had
constructed it. It is also termed as Pre-5 maintenance period.
2. What is CA/NIT?
Rights of freezing and unfreezing of package has been given to PIU Incharge. When a package is freezed, no further
changes can be done. To enable the changes package need to be unfreezed. After unfreezing package become
available at AE/AM/JE/Sub. Engg. level for updation.
After freezing of CA/NIT by the state coordinator, it becomes available for mapping with package.
8. What to do if CA/NIT no. not found in NIT list at the time of Package and Road Updation?
If CA/NIT no. not found in the list, contact NMO. NMO has to enter and freeze that CA/NIT into eMARG.
9. What is the registration process of any contractor working on multiple departments within a state?
If any contractor is working in multiple Departments within a state then contractor has to register separately for all
the departments, Please refer Help>>Operating Instruction>>Contractor Registration Process.
eMARG 1
NIC
10. What do you mean by locking of a Package?
If any Package is locked, if implies that the package as well as its NIT is permanently freezed and will not be
available for unfreezing.
11. Sometimes after successful login, system logs out automatically. Why ?
This problem may be related with your existing service provider for Internet connectivity. Please try with different
service provider.
Bank user is the person deputed by the bank. He will be responsible for payment of scrolls uploaded by the
PIU/District.
14. During the registration process of contractor registration pdf is not downloading. Why?
KM wise total 4 PE (0th km,1st km,2nd km,3rd km) will be performed and rest of the calculation based on PE marks
obtained in that km.
PE in km PE Marks
th st
0 (1 km) PE1
st nd
1 (2 km) PE2
2nd (3rd km) PE3
rd
3 (Partial Length .750km) PE4
Calculation Formula
eMARG 2
NIC